메뉴 건너뛰기




Volumn , Issue , 2009, Pages 91-94

Predictive analysis and basic judgment of development targets in China's wind power industry

Author keywords

China; Predictive analysis; Wind power targets

Indexed keywords

BASIC PRINCIPLES; CHINA; GM (1 , 1) MODEL; GROWTH RATE METHOD; INSTALLED CAPACITY; PLANNING GOAL; PREDICTIVE ANALYSIS; RAPID DEVELOPMENT; VALUE METHODS; WIND POWER INDUSTRY;

EID: 73449134131     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WNWEC.2009.5335834     Document Type: Conference Paper
Times cited : (1)

References (8)
  • 1
    • 78751532329 scopus 로고    scopus 로고
    • Center of technology development of China's rural areas in Ministry of Science and Technology, Beijing: China Agricultural Science and Technology Press
    • Center of technology development of China's rural areas in Ministry of Science and Technology, Wind Energy Utilization Technologies, Beijing: China Agricultural Science and Technology Press, 2006, pp. 5-7.
    • (2006) Wind Energy Utilization Technologies , pp. 5-7
  • 2
    • 56449128380 scopus 로고    scopus 로고
    • in China, Beijing: Chemical Industry Press, pp
    • J. Li, Wind 12 in China, Beijing: Chemical Industry Press, pp.106-107, 2005.
    • (2005) Wind 12 , pp. 106-107
    • Li, J.1
  • 4
    • 73449148707 scopus 로고    scopus 로고
    • Beijing: Mechanical Industry Press, pp
    • J. Gong, Manual Wind Engineering, Beijing: Mechanical Industry Press, pp. 527-529, 2004.
    • (2004) Manual Wind Engineering , pp. 527-529
    • Gong, J.1
  • 6
    • 73449097470 scopus 로고    scopus 로고
    • Beijing: Chemical Industry Press, pp
    • X. Guo, Wind Energy Technology, Beijing: Chemical Industry Press, pp. 26-28, 2007.
    • (2007) Wind Energy Technology , pp. 26-28
    • Guo, X.1
  • 7
    • 73449146982 scopus 로고    scopus 로고
    • We must speed up the training base construction for the rapid development of wind power
    • Shanghai
    • X.O. Hong, Z.F.Wang, "We must speed up the training base construction for the rapid development of wind power," International Wind Energy Conference Proceedings, Shanghai, 2007, pp.28-29
    • (2007) International Wind Energy Conference Proceedings , pp. 28-29
    • Hong, X.O.1    Wang, Z.F.2
  • 8
    • 73449137904 scopus 로고    scopus 로고
    • A Comparison of Wind Power Industry Development Strategies in Spain, India and China
    • Shanghai
    • J. Lewis. "A Comparison of Wind Power Industry Development Strategies in Spain, India and China," Proceedings of Wind Power Shanghai, 2007, pp. 55-65
    • (2007) Proceedings of Wind Power , pp. 55-65
    • Lewis, J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.