메뉴 건너뛰기




Volumn 15, Issue 4, 2009, Pages 349-359

Evaluation methods for construction projects

Author keywords

Decisionmaking; Financial management; Investments

Indexed keywords

CONSTRUCTION MARKETS; CONSTRUCTION PROJECTS; DECISION TOOL; EVALUATION METHOD; FINANCIAL EVALUATION; FINANCIAL MANAGEMENT; FINANCIAL MANAGEMENTS; INTERNAL RATE OF RETURN; INVESTMENT DECISIONS; NET PRESENT VALUE; PRESENT VALUE; RATE OF RETURN; SYSTEMATIC BIAS;

EID: 73349136611     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/1392-3730.2009.15.349-359     Document Type: Article
Times cited : (19)

References (16)
  • 1
    • 0542408682 scopus 로고
    • Net present value and rate of return: Implicit and explicit reinvestment assumptions
    • doi: 10.1080/00137918808966958
    • Beaves, R. G. 1988. Net present value and rate of return: implicit and explicit reinvestment assumptions, The Engineering Economist 33(4): 275-302. doi: 10.1080/00137918808966958.
    • (1988) The Engineering Economist , vol.33 , Issue.4 , pp. 275-302
    • Beaves, R.G.1
  • 2
    • 8744308516 scopus 로고
    • The case for a generalized net present value formula
    • doi: 10.1080/00137919308903091
    • Beaves, R. G. 1993. The case for a generalized net present value formula, The Engineering Economist 38(2): 119-133. doi: 10.1080/00137919308903091.
    • (1993) The Engineering Economist , vol.38 , Issue.2 , pp. 119-133
    • Beaves, R.G.1
  • 3
    • 31444433179 scopus 로고
    • Base selection for modified rates of return and its irrelevance for optimal project choice
    • doi: 10.1080/00137918908903003
    • Bernhard, R. H. 1989. Base selection for modified rates of return and its irrelevance for optimal project choice, The Engineering Economist 35(1): 55-65. doi: 10.1080/00137918908903003.
    • (1989) The Engineering Economist , vol.35 , Issue.1 , pp. 55-65
    • Bernhard, R.H.1
  • 5
    • 34548446273 scopus 로고    scopus 로고
    • Project options valuation with net present value and decision tree analysis
    • DOI 10.1016/j.ejor.2006.07.047, PII S037722170601099X
    • De Reyck, B.; Degraeve, Z., and Vandenborre, R. 2008. Project options valuation with net present value and decision tree analysis, European Journal of Operational Research 184(1): 341-355. doi: 10.1016/j.ejor.2006.07.047. (Pubitemid 47368909)
    • (2008) European Journal of Operational Research , vol.184 , Issue.1 , pp. 341-355
    • De Reyck, B.1    Degraeve, Z.2    Vandenborre, R.3
  • 6
    • 19644381768 scopus 로고    scopus 로고
    • How do CFOs make capital budgeting and capital structure decisions?
    • doi: 10.1111/j.1745-6622.2002.tb00337.x
    • Graham, J. and Harvey, C. 2002. How do CFOs make capital budgeting and capital structure decisions? Journal of Applied Corporate Finance 15(1): 8-22. doi: 10.1111/j.1745-6622.2002.tb00337.x.
    • (2002) Journal of Applied Corporate Finance , vol.15 , Issue.1 , pp. 8-22
    • Graham, J.1    Harvey, C.2
  • 7
    • 0030551295 scopus 로고    scopus 로고
    • Adjusting the modified internal rates of return
    • doi: 10.1080/00137919608967484
    • Hajdasinski, M. M. 1996. Adjusting the modified internal rates of return, The Engineering Economist 41(2): 173-186. doi: 10.1080/00137919608967484.
    • (1996) The Engineering Economist , vol.41 , Issue.2 , pp. 173-186
    • Hajdasinski, M.M.1
  • 8
    • 23344450027 scopus 로고    scopus 로고
    • The relevant internal rate of return
    • DOI 10.1080/00137910490453419
    • Hartman, J. C. and Schafrick, I. C. 2004. The relevant internal rate of return, The Engineering Economist 49(2): 139-158. doi: 10.1080/ 00137910490453419. (Pubitemid 41100750)
    • (2004) Engineering Economist , vol.49 , Issue.2 , pp. 139-158
    • Hartman, J.C.1    Schafrick, I.C.2
  • 9
    • 23344439408 scopus 로고    scopus 로고
    • A new perspective on multiple internal rates of return
    • doi: 10.1080/00137910308965050
    • Hazen, G. B. 2003. A new perspective on multiple internal rates of return, The Engineering Economist 48(1): 31-51. doi: 10.1080/00137910308965050.
    • (2003) The Engineering Economist , vol.48 , Issue.1 , pp. 31-51
    • Hazen, G.B.1
  • 10
    • 67651095653 scopus 로고    scopus 로고
    • An extension of the internal rate of return to stochastic cash flows
    • doi: 10.1287/mnsc.1080.0989
    • Hazen, G. B. 2009. An extension of the internal rate of return to stochastic cash flows, Management Science 55(6): 1030-1034. doi: 10.1287/mnsc.1080.0989.
    • (2009) Management Science , vol.55 , Issue.6 , pp. 1030-1034
    • Hazen, G.B.1
  • 11
    • 16244420747 scopus 로고    scopus 로고
    • How real option disinvestment flexibility augments project NPV
    • DOI 10.1016/j.ejor.2004.02.028, PII S0377221704003030
    • Keswani, A., and Mark, B. S. 2006. How real option disinvestment flexibility augments project NPV, European Journal of Operational Research 168(1): 240-252. doi: 10.1016/j.ejor.2004.02.028. (Pubitemid 40454560)
    • (2006) European Journal of Operational Research , vol.168 , Issue.1 , pp. 240-252
    • Keswani, A.1    Shackleton, M.B.2
  • 12
    • 84952087310 scopus 로고
    • The modified rate of return and investment criterion
    • doi: 10.1080/00137917608902796
    • Lin, S. A. Y. 1976. The modified rate of return and investment criterion, The Engineering Economist 21(4): 237-247. doi: 10.1080/00137917608902796.
    • (1976) The Engineering Economist , vol.21 , Issue.4 , pp. 237-247
    • Lin, S.A.Y.1
  • 13
    • 84987460503 scopus 로고
    • Discounted cash flow with explicit reinvestment rates: Tutorial and extension
    • doi: 10.1111/j.1540-6288.1988.tb01276.x
    • Mc Daniel, W. R.; McCarty, D. E., and Jessell, K. A. 1988. Discounted cash flow with explicit reinvestment rates: Tutorial and extension, The Financial Review 23(3): 369-385. doi: 10.1111/j.1540-6288.1988.tb01276.x.
    • (1988) The Financial Review , vol.23 , Issue.3 , pp. 369-385
    • Mc Daniel, W.R.1    McCarty, D.E.2    Jessell, K.A.3
  • 14
    • 84900341179 scopus 로고
    • Efficient capital project selection through a yield-based capital budgeting technique
    • doi: 10.1080/00137919208903083
    • Shull, D. M. 1992. Efficient capital project selection through a yield-based capital budgeting technique, The Engineering Economist 38(1): 1-18. doi: 10.1080/00137919208903083.
    • (1992) The Engineering Economist , vol.38 , Issue.1 , pp. 1-18
    • Shull, D.M.1
  • 15
    • 31444455031 scopus 로고
    • Overall rates of return: Investment base, reinvestment rates, and time horizon
    • doi: 10.1080/00137919408903118
    • Shull, D. M. 1994. Overall rates of return: investment base, reinvestment rates, and time horizon, The Engineering Economist 39(2): 139-163. doi: 10.1080/00137919408903118.
    • (1994) The Engineering Economist , vol.39 , Issue.2 , pp. 139-163
    • Shull, D.M.1
  • 16
    • 0008563034 scopus 로고    scopus 로고
    • NPV-at-risk method in infrastructure project investment evaluation
    • doi: 10.1061/(ASCE)0733-9364(2000)126: 3(227)
    • Ye, S. and Tiong, R. L. K. 2000. NPV-at-risk method in infrastructure project investment evaluation, Journal of Construction Engineering and Management 126(3): 227-233. doi: 10.1061/(ASCE)0733-9364(2000)126: 3(227).
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.3 , pp. 227-233
    • Ye, S.1    Tiong, R.L.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.