메뉴 건너뛰기




Volumn 56, Issue 8, 2009, Pages 730-744

A two-echelon inventory-location problem with service considerations

Author keywords

Response time requirements; Service parts inventory systems; Supply chain design

Indexed keywords

BASE STOCK; COMPUTATIONAL RESULTS; EXPECTED COSTS; INVENTORY SYSTEMS; LAGRANGIAN HEURISTICS; LOCATION PROBLEMS; MANUFACTURING PROCESS; MIXED INTEGER NONLINEAR PROGRAMMING MODELS; NP-HARD; NUMBER OF SERVICES; QUEUING SYSTEMS; RESPONSE TIME; SERVICE CENTER; SERVICE CONSTRAINTS; SET OF CUSTOMERS; SPARE PARTS INVENTORIES; STOCHASTIC DEMAND; STORAGE CAPACITY; SUPPLY CHAIN DESIGN; TWO-ECHELON INVENTORY;

EID: 73049109200     PISSN: 0894069X     EISSN: 15206750     Source Type: Journal    
DOI: 10.1002/nav.20376     Document Type: Article
Times cited : (39)

References (38)
  • 1
    • 0003953131 scopus 로고    scopus 로고
    • second edition, Springer, New York
    • S. Axsäter, Inventory control, second edition, Springer, New York, 2006.
    • (2006) Inventory Control
    • Axsäter, S.1
  • 2
    • 61349138766 scopus 로고    scopus 로고
    • Demand allocation in systems with multiple inventory locations and multiple demand sources
    • S. Benjaafar, Y. Li, D. Xu, and S. Elhedhli, Demand allocation in systems with multiple inventory locations and multiple demand sources, Manufacturing Service Oper Manage 10 (2008), 43-60.
    • (2008) Manufacturing Service Oper Manage , vol.10 , pp. 43-60
    • Benjaafar, S.1    Li, Y.2    Xu, D.3    Elhedhli, S.4
  • 6
    • 2942668214 scopus 로고    scopus 로고
    • Two-echelon spare parts inventory system subject to a service constraint
    • D. Caglar, C.L. Li, and D. Simchi-Levi, Two-echelon spare parts inventory system subject to a service constraint, IIE Trans 36 (2004), 655-666.
    • (2004) IIE Trans , vol.36 , pp. 655-666
    • Caglar, D.1    Li, C.L.2    Simchi-Levi, D.3
  • 7
    • 33845324136 scopus 로고    scopus 로고
    • Benefits of considering inventory in service parts logistics network design problems with time-based service constraints
    • M.F. Candas and E. Kutanoglu, Benefits of considering inventory in service parts logistics network design problems with time-based service constraints, IIE Trans 39 (2007), 159-176.
    • (2007) IIE Trans , vol.39 , pp. 159-176
    • Candas, M.F.1    Kutanoglu, E.2
  • 8
    • 0024480893 scopus 로고
    • Near-optimal service constrained stocking policies for spare parts
    • M.A. Cohen, P.A. Kleindorfer, and H.L. Lee, Near-Optimal Service Constrained Stocking Policies for Spare Parts, Oper Res 37 (1989), 104-117.
    • (1989) Oper Res , vol.37 , pp. 104-117
    • Cohen, M.A.1    Kleindorfer, P.A.2    Lee, H.L.3
  • 11
    • 0036033283 scopus 로고    scopus 로고
    • An inventory-location model: Formulation solution algorithm and computational results
    • M. Daskin, C. Coullard, and Z.J. Shen, An Inventory-Location Model: Formulation, Solution Algorithm and Computational Results, Annals Oper Res 110 (2002), 83-106.
    • (2002) Annals Oper Res , vol.110 , pp. 83-106
    • Daskin, M.1    Coullard, C.2    Shen, Z.J.3
  • 13
    • 0037533147 scopus 로고    scopus 로고
    • Springer, New York,Z. Drezner and H.W. Hamacher (Editors)
    • Z. Drezner and H.W. Hamacher (Editors), Facility Location: Applications and Theory, Springer, New York, 2002.
    • (2002) Facility Location: Applications and Theory
  • 14
    • 12344266783 scopus 로고    scopus 로고
    • Outbound supply chain network design with mode selection, lead times and capacitated vehicle distribution centers
    • E. Eskigun, R. Uzsoy, P.V. Preckel, G. Beaujon, S. Krishnan, and J.D. Tew, Outbound Supply Chain Network Design with Mode Selection, Lead Times and Capacitated Vehicle Distribution Centers, Eur J Oper Res 165 (2005), 182-206.
    • (2005) Eur J Oper Res , vol.165 , pp. 182-206
    • Eskigun, E.1    Uzsoy, R.2    Preckel, P.V.3    Beaujon, G.4    Krishnan, S.5    Tew, J.D.6
  • 15
    • 34047228875 scopus 로고    scopus 로고
    • Outbound supply chain network design with mode selection and lead time considerations
    • E. Eskigun, R. Uzsoy, P.V. Preckel, G. Beaujon, S. Krishnan, and J.D. Tew, Outbound Supply Chain Network Design with Mode Selection and Lead Time Considerations, Naval Res Log 54 (2007), 282-300.
    • (2007) Naval Res Log , vol.54 , pp. 282-300
    • Eskigun, E.1    Uzsoy, R.2    Preckel, P.V.3    Beaujon, G.4    Krishnan, S.5    Tew, J.D.6
  • 16
    • 0034156160 scopus 로고    scopus 로고
    • A supply network model with base-stock control and service requirements
    • M. Ettl, G.E. Feigin, G.Y. Lin, and D.D. Yao, A Supply Network Model with Base-Stock Control and Service Requirements, Oper Res 48 (2000), 216-232.
    • (2000) Oper Res , vol.48 , pp. 216-232
    • Ettl, M.1    Feigin, G.E.2    Lin, G.Y.3    Yao, D.D.4
  • 17
    • 73049117665 scopus 로고
    • A multi-echelon inventory model for a repairable item with one-for-one replenishment
    • S.C. Graves, A Multi-Echelon Inventory Model for a Repairable Item with One-for-one Replenishment, Manage Sci 40 (1985), 597-602.
    • (1985) Manage Sci , vol.40 , pp. 597-602
    • Graves, S.C.1
  • 18
    • 73049099735 scopus 로고    scopus 로고
    • IBM (March 16, 2009), Available at, Accessed date: March 16
    • IBM (March 16, 2009), Spare Parts Inventory Management Solution-Business View. Available at: http://www-03.ibm.com/industries/automotive/us/detail/ solution/U225671Y82885J57.html?tab=2, Accessed date: March 16, 2009.
    • Spare Parts Inventory Management Solution-Business View , pp. 2009
  • 19
    • 0040377750 scopus 로고
    • Some equilibrium results for the queuing process Ek/M/1
    • R.R.P. Jackson and D.G. Nickols, Some Equilibrium Results for the Queuing Process Ek/M/1, J R Stat Soc Ser B 18 (1956), 275-279.
    • (1956) J R Stat Soc Ser B , vol.18 , pp. 275-279
    • Jackson, R.R.P.1    Nickols, D.G.2
  • 20
    • 38849176183 scopus 로고    scopus 로고
    • Insights into inventory sharing in service parts logistics systems with time-based service levels
    • E. Kutanoglu, Insights into Inventory Sharing in Service Parts Logistics Systems with Time-based Service Levels, Computers Ind Eng 54 (2008), 341-358.
    • (2008) Computers Ind Eng , vol.54 , pp. 341-358
    • Kutanoglu, E.1
  • 21
    • 0027658539 scopus 로고
    • Material management in decentralized supply chains
    • H.L. Lee and C. Billington, Material Management in Decentralized Supply Chains, Oper Res 41 (1993), 835-847.
    • (1993) Oper Res , vol.41 , pp. 835-847
    • Lee, H.L.1    Billington, C.2
  • 23
    • 0022900029 scopus 로고
    • Batch size and stocking levels in multi-echelon reparable systems
    • K. Moinzadeh and H.L. Lee, Batch Size and Stocking Levels in Multi-Echelon Reparable Systems, Manage Sci 32 (1986),
    • (1986) Manage Sci , vol.32
    • Moinzadeh, K.1    Lee, H.L.2
  • 24
    • 0034779557 scopus 로고    scopus 로고
    • A two-echelon inventory allocation and distribution center location analysis
    • L.K. Nozick and M.A. Turnquist, A Two-Echelon Inventory Allocation and Distribution Center Location Analysis, Transportation Res E 37 (2001), 425-441.
    • (2001) Transportation Res E , vol.37 , pp. 425-441
    • Nozick, L.K.1    Turnquist, M.A.2
  • 25
    • 43949140914 scopus 로고    scopus 로고
    • Capacitated facility location model with risk pooling
    • L. Ozsen, M. Daskin, and C. Coullard, Capacitated Facility Location Model with Risk Pooling, Naval Res Log 55 (2008), 295-312.
    • (2008) Naval Res Log , vol.55 , pp. 295-312
    • Ozsen, L.1    Daskin, M.2    Coullard, C.3
  • 26
  • 27
    • 22944440358 scopus 로고    scopus 로고
    • A multi-commodity supply chain design problem
    • Z.J.Shen,A Multi-Commodity Supply Chain Design Problem, IIE Trans 37 (2005), 753-762.
    • (2005) IIE Trans , vol.37 , pp. 753-762
    • Shen, Z.J.1
  • 28
    • 56649096217 scopus 로고    scopus 로고
    • Integrated supply chain design models: A survey and future research directions
    • Z.J. Shen, Integrated Supply Chain Design Models: A Survey and Future Research Directions, J Industrial Manage Optim 3 (2006), 1-27.
    • (2006) J Industrial Manage Optim , vol.3 , pp. 1-27
    • Shen, Z.J.1
  • 30
    • 25444439324 scopus 로고    scopus 로고
    • Trade-offs between customer service and cost in integrated supply chain design
    • Z.J. Shen and M.S. Daskin, Trade-offs Between Customer Service and Cost in Integrated Supply Chain Design, Manufacturing Service Oper Manage 7 (2005), 188- 207.
    • (2005) Manufacturing Service Oper Manage , vol.7 , pp. 188-207
    • Shen, Z.J.1    Daskin, M.S.2
  • 31
    • 33751397147 scopus 로고    scopus 로고
    • Incorporating inventory and routing costs in strategic location models
    • Z.J.Shen and L.Qi, Incorporating Inventory and Routing Costs in Strategic Location Models, Eur J Oper Res 179 (2006), 372-389.
    • (2006) Eur J Oper Res , vol.179 , pp. 372-389
    • Shen, Z.J.1    Qi, L.2
  • 32
    • 0000946660 scopus 로고
    • METRIC: A multi-echelon technique for recoverable item control
    • C.C. Sherbrooke, METRIC: A Multi-Echelon Technique for Recoverable Item Control, Oper Res 34 (1968), 311-319.
    • (1968) Oper Res , vol.34 , pp. 311-319
    • Sherbrooke, C.C.1
  • 33
    • 14644433042 scopus 로고    scopus 로고
    • Stochastic transportation inventory network design problem
    • J. Shu, C.P. Teo, and Z.J. Shen, Stochastic Transportation Inventory Network Design Problem, Oper Res 53 (2005), 48-60.
    • (2005) Oper Res , vol.53 , pp. 48-60
    • Shu, J.1    Teo, C.P.2    Shen, Z.J.3
  • 34
    • 28244494183 scopus 로고    scopus 로고
    • Safety stock positioning in supply chains with stochastic lead times
    • D. Simchi-Levi and Y. Zhao, Safety Stock Positioning in Supply Chains with Stochastic Lead Times, Manufacturing Service Oper Manage 7 (2005), 295-318.
    • (2005) Manufacturing Service Oper Manage , vol.7 , pp. 295-318
    • Simchi-Levi, D.1    Zhao, Y.2
  • 36
    • 33847775973 scopus 로고    scopus 로고
    • A single-product network design model with lead time and safety stock considerations
    • DOI 10.1080/07408170600941631, PII 771652203
    • K. Sourirajan, L. Ozsen, and R. Uzsoy, A Single-Product Network Design Mode with Lead Time and Safety Stock Considerations, IIE Trans 39 (2007), 411-424. (Pubitemid 46388891)
    • (2007) IIE Transactions (Institute of Industrial Engineers) , vol.39 , Issue.5 , pp. 411-424
    • Sourirajan, K.1    Ozsen, L.2    Uzsoy, R.3
  • 37
    • 33646348751 scopus 로고    scopus 로고
    • Facility location under uncertainty: A review
    • L. Snyder, Facility Location Under Uncertainty: A Review, IIE Trans 38 (2006), 537-554.
    • (2006) IIE Trans , vol.38 , pp. 537-554
    • Snyder, L.1
  • 38
    • 25144463125 scopus 로고    scopus 로고
    • Reliability models for facility location: The expected failure cost case
    • L. Snyder and M.S. Daskin, Reliability Models for Facility Location: The Expected Failure Cost Case, Transportation Sci 39 (2005), 400-416.
    • (2005) Transportation Sci , vol.39 , pp. 400-416
    • Snyder, L.1    Daskin, M.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.