메뉴 건너뛰기




Volumn 3, Issue , 2009, Pages 1324-1333

Integrating construction safety and project performance through safety information management in an industrial construction company

Author keywords

[No Author keywords available]

Indexed keywords

CONSTRUCTION SAFETY; CORRECTIVE ACTIONS; COST-INCREASES; DATA COLLECTION; HUMAN INJURY; INDUSTRIAL CONSTRUCTION; INFORMATION MANAGEMENT SYSTEMS; KNOWLEDGE DISCOVERY AND DATA MININGS; LEADING INDICATORS; MANAGEMENT DECISIONS; NEW APPROACHES; PLANNING AND CONTROL; PROJECT PERFORMANCE; RESEARCH AND DEVELOPMENT; ROOT CAUSE; SAFETY INCIDENTS; SAFETY INFORMATION; SAFETY INFORMATION MANAGEMENT; SAFETY MANAGEMENT; SAFETY PERFORMANCE; SAFETY PLANNING; SINGLE SOURCE; STANDARD CONSTRUCTIONS; SYSTEM DEVELOPMENT;

EID: 72849110102     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (1)

References (7)
  • 1
    • 13944256609 scopus 로고    scopus 로고
    • Factors that influence safety performance of specialty contractors
    • Hinze, J., and Gambatese, J. (2003). "Factors that influence safety performance of specialty contractors." J.Constr.Eng.Manage., 129(2), 159-164.
    • (2003) J.Constr.Eng.Manage , vol.129 , Issue.2 , pp. 159-164
    • Hinze, J.1    Gambatese, J.2
  • 2
    • 0013199180 scopus 로고    scopus 로고
    • Identifying Root Causes of Construction Injuries
    • Hinze, J., Pedersen, C., and Fredley, J. (1998). "Identifying Root Causes of Construction Injuries." J. Constr. Engrg. and Mgmt., 124(1), 67-71.
    • (1998) J. Constr. Engrg. and Mgmt , vol.124 , Issue.1 , pp. 67-71
    • Hinze, J.1    Pedersen, C.2    Fredley, J.3
  • 3
    • 0042275878 scopus 로고
    • Analysis of fatalities recorded by OSHA
    • Hinze, J., and Russell, D. B. (1995). "Analysis of fatalities recorded by OSHA." J.Constr.Eng.Manage., 121(2), 209-214.
    • (1995) J.Constr.Eng.Manage , vol.121 , Issue.2 , pp. 209-214
    • Hinze, J.1    Russell, D.B.2
  • 4
    • 0034272030 scopus 로고    scopus 로고
    • Moving toward a zero injury objective
    • Hinze, J., and Wilson, G. (2000). "Moving toward a zero injury objective." J.Constr.Eng.Manage., 126(5), 399-403.
    • (2000) J.Constr.Eng.Manage , vol.126 , Issue.5 , pp. 399-403
    • Hinze, J.1    Wilson, G.2
  • 5
    • 38449107781 scopus 로고
    • Integrating construction safety and health performance into CPM
    • ASCE, San Diego, CA, USA
    • Kartam, N. (1995). "Integrating construction safety and health performance into CPM." Proceedings of the 1995 Construction Congress, ASCE, San Diego, CA, USA, 456-462.
    • (1995) Proceedings of the 1995 Construction Congress , pp. 456-462
    • Kartam, N.1
  • 6
    • 0032073187 scopus 로고    scopus 로고
    • Psychology of Accident Prevention in the Construction Industry
    • Loosemore, M. (1998). "Psychology of Accident Prevention in the Construction Industry." J. Mgmt. in Engrg., 14(3), 50-56.
    • (1998) J. Mgmt. in Engrg , vol.14 , Issue.3 , pp. 50-56
    • Loosemore, M.1
  • 7
    • 1842842991 scopus 로고    scopus 로고
    • Safety and production: An integrated planning and control model
    • Saurin, T. A., Formoso, C. T., and Guimaraes, L. B. M. (2004). "Safety and production: An integrated planning and control model." Constr.Manage.Econ., 22(2), 159-169.
    • (2004) Constr.Manage.Econ , vol.22 , Issue.2 , pp. 159-169
    • Saurin, T.A.1    Formoso, C.T.2    Guimaraes, L.B.M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.