|
Volumn 110, Issue 3-4, 2010, Pages 33-42
|
Effect of Excavation-Induced Groundwater Level Drawdown on Tunnel Inflow in a Jointed Rock Mass
|
Author keywords
Distinct element method; Groundwater inflow; Groundwater level drawdown; Hydro mechanically coupled behavior of joints
|
Indexed keywords
ANALYTICAL METHOD;
ANALYTICAL SOLUTIONS;
BEHAVIOR OF JOINT;
DISTINCT ELEMENT METHODS;
EMPIRICAL METHOD;
ENGINEERING PRACTICES;
FIELD OBSERVATIONS;
GROUND WATER INFLOW;
GROUND WATER LEVEL;
GROUND WATER RECHARGE;
GROUND WATER TABLE;
HYDRAULIC HEADS;
INFLOW RATE;
JOINTED ROCK MASS;
TUNNEL ALIGNMENTS;
TUNNEL INFLOW;
WATER LEVEL DRAWDOWN;
EXCAVATION;
FLOW PATTERNS;
HYDROGEOLOGY;
RESERVOIRS (WATER);
TUNNELS;
WATER LEVELS;
WIND TUNNELS;
RECHARGING (UNDERGROUND WATERS);
DISTINCT ELEMENT METHOD;
DRAWDOWN;
EXCAVATION;
GROUNDWATER FLOW;
HYDRAULIC HEAD;
HYDROMECHANICS;
INFLOW;
JOINT;
NUMERICAL MODEL;
RECHARGE;
ROCK MASS RESPONSE;
TUNNEL;
WATER TABLE;
|
EID: 72549097427
PISSN: 00137952
EISSN: None
Source Type: Journal
DOI: 10.1016/j.enggeo.2009.09.002 Document Type: Article |
Times cited : (87)
|
References (11)
|