Volumn 3, Issue 11, 2009, Pages 1000-1019

Relative electrical distance concept for evaluation of network reactive power and loss contributions in a deregulated system

Author keywords

[No Author keywords available]

Indexed keywords

BUS SYSTEMS; DEREGULATED SYSTEMS; ELECTRICAL DISTANCE; ELECTRICITY MARKET; GENERATOR BUS; LIBERALISATION; PROPORTIONAL SHARING; REACTIVE FLOW; REACTIVE GENERATION; SWITCHABLE; TRANSMISSION LINE; TRANSMISSION NETWORKS;

EID: 72349094491     PISSN: 17518687     EISSN: None     Source Type: Journal    
DOI: 10.1049/iet-gtd.2009.0154     Document Type: Article
Times cited : (33)

References (12)
  • 2
    • 0036474359 scopus 로고    scopus 로고
    • Incremental transmission loss allocation under pool dispatch
    • 0885-8950
    • Galiana, F.D., Conejo, A.J., and Kockar, I.: ' Incremental transmission loss allocation under pool dispatch ', IEEE Trans. Power Syst., 2002, 17, p. 26-33 0885-8950
    • (2002) IEEE Trans. Power Syst. , vol.17 , pp. 26-33
    • Galiana, F.D.1    Conejo, A.J.2    Kockar, I.3
  • 3
    • 0031200253 scopus 로고    scopus 로고
    • Topological generation and load distribution factors for supplement charge allocation in transmission open access
    • 10.1109/59.630460 0885-8950
    • Bialek, J.: ' Topological generation and load distribution factors for supplement charge allocation in transmission open access ', IEEE Trans. Power Syst., 1997, 12, (3), p. 1185-1193 10.1109/59.630460 0885-8950
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.3 , pp. 1185-1193
    • Bialek, J.1
  • 4
    • 0031079076 scopus 로고    scopus 로고
    • Contributions of individual generators to loads and flows
    • (), 10.1109/59.574923 0885-8950
    • Kirschen, D., Allan, R., and Strbac, G.: ' Contributions of individual generators to loads and flows ', IEEE Trans. Power Syst., 1997, 12, (1), p. 52-60 10.1109/59.574923 0885-8950
    • (1997) IEEE Trans. Power Syst. , vol.12 , Issue.1 , pp. 52-60
    • Kirschen, D.1    Allan, R.2    Strbac, G.3
  • 5
    • 0035248048 scopus 로고    scopus 로고
    • Z-bus loss allocation
    • DOI 10.1109/59.910787, PII S0885895001023136
    • Conejo, A.J., Galiana, F.D., and Kockar, I.: ' Z-bus loss allocation ', IEEE Trans. Power Syst., 2001, 16, p. 105-110 10.1109/59.910787 0885-8950 (Pubitemid 32297475)
    • (2001) IEEE Transactions on Power Systems , vol.16 , Issue.1 , pp. 105-110
    • Conejo, A.J.1    Galiana, F.D.2    Kockar, I.3
  • 6
    • 1442289994 scopus 로고    scopus 로고
    • Allocating the costs of reactive power purchased in an ancillary service market by modified Y-bus matrix method
    • (), 10.1109/TPWRS.2003.821425 0885-8950
    • Chu, W.-C., Chen, B.-K., and Liao, C.-H.: ' Allocating the costs of reactive power purchased in an ancillary service market by modified Y-bus matrix method ', IEEE Trans. Power Syst., 2004, 19, (1), p. 174-179 10.1109/TPWRS.2003.821425 0885-8950
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.1 , pp. 174-179
    • Chu, W.-C.1    Chen, B.-K.2    Liao, C.-H.3
  • 7
    • 4944251281 scopus 로고    scopus 로고
    • Transmission charges of power contracts based on relative electrical distances in open access
    • 0378-7796
    • Vishaka, K., Thukaram, D., and Jenkins, L.: ' Transmission charges of power contracts based on relative electrical distances in open access ', Electr. Power Syst. Res., 2004, 70, p. 153-161 0378-7796
    • (2004) Electr. Power Syst. Res. , vol.70 , pp. 153-161
    • Vishaka, K.1    Thukaram, D.2    Jenkins, L.3
  • 8
    • 33749385434 scopus 로고    scopus 로고
    • Comparison of optimum reactive power schedule with different objectives using LP technique
    • () Article 4
    • Thukaram, D., and Yesuratnam, G.: ' Comparison of optimum reactive power schedule with different objectives using LP technique ', Int. J. Emerg. Electr. Power Syst., 2006, 7, (3), p. 1-31, Article 4
    • (2006) Int. J. Emerg. Electr. Power Syst. , vol.7 , Issue.3 , pp. 1-31
    • Thukaram, D.1    Yesuratnam, G.2
  • 9
    • 72349095764 scopus 로고    scopus 로고
    • Some aspects of voltage stability improvement in planning and operation of power systems ', 2004, PhD, Indian Institute of Science, Bangalore, India
    • Vishaka, K.: ' Some aspects of voltage stability improvement in planning and operation of power systems ', 2004, PhD, Indian Institute of Science, Bangalore, India
    • Vishaka, K.1
  • 10
    • 72349091471 scopus 로고    scopus 로고
    • Evaluation and improvement of real and reactive power flows in deregulated transmission networks
    • IIT Roorkee
    • Thukaram, D., and Vyjayanthi, C.: ' Evaluation and improvement of real and reactive power flows in deregulated transmission networks ', National Power Systems Conf., 2006, IIT Roorkee
    • (2006) National Power Systems Conf.
    • Thukaram, D.1    Vyjayanthi, C.2
  • 11
    • 67649204425 scopus 로고    scopus 로고
    • Evaluation of suitable locations for generation expansion in restructured power systems: A novel concept of T-index
    • (), Article 4
    • Thukaram, D., and Vyjayanthi, C.: ' Evaluation of suitable locations for generation expansion in restructured power systems: a novel concept of T-index ', Int. J. Emerg. Electr. Power Syst., 2009, 10, (1), p. 1-26, Article 4
    • (2009) Int. J. Emerg. Electr. Power Syst. , vol.10 , Issue.1 , pp. 1-26
    • Thukaram, D.1    Vyjayanthi, C.2
  • 12
    • 0021406608 scopus 로고
    • Improved algorithm for optimum reactive power allocation
    • (), 0142-0615
    • Thukaram, D., Parthasarathy, K., and Prior, D.L.: ' Improved algorithm for optimum reactive power allocation ', Int. J. Electr. Power Energy Syst., 1984, 6, (2), p. 72-74 0142-0615
    • (1984) Int. J. Electr. Power Energy Syst. , vol.6 , Issue.2 , pp. 72-74
    • Thukaram, D.1    Parthasarathy, K.2    Prior, D.L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.