메뉴 건너뛰기




Volumn , Issue , 2009, Pages

Reliability assessment of wind integration in operating and planning of generation systems

Author keywords

Adequacy; Operating reserve; Planning reserve; Reliability; Wind generation integration

Indexed keywords

ADEQUACY; GENERATION SYSTEMS; IEEE-RELIABILITY TEST SYSTEM; INTERMITTENCY; LONG TERM PLANNING; OPERATING RESERVE; POWER SYSTEMS; PROBABILISTIC METHODS; REAL-TIME OPERATION; RELIABILITY ASSESSMENTS; RELIABILITY MODEL; SIGNIFICANT IMPACTS; SYSTEM SECURITY; WIND GENERATION; WIND INTEGRATION; WIND MODELING;

EID: 71849109602     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/PES.2009.5275532     Document Type: Conference Paper
Times cited : (9)

References (12)
  • 1
    • 71849097273 scopus 로고    scopus 로고
    • 2007 Integrated Energy Policy Report, CEC-100-2007-008-CMF
    • California Energy Commission, pp
    • California Energy Commission, "2007 Integrated Energy Policy Report, CEC-100-2007-008-CMF", pp. 101.
  • 2
    • 52349086797 scopus 로고    scopus 로고
    • CAISO, available at
    • CAISO, "Integration of Renewable Resources", 2007, available at http://www.caiso.com/1ca5/1ca5a7a026270.pdf.
    • (2007) Integration of Renewable Resources
  • 3
    • 0020497503 scopus 로고
    • Development of a new procedure for reliability modeling of wind turbine generators
    • January
    • P. Giorsetto and K. F. Utsurogi, "Development of a new procedure for reliability modeling of wind turbine generators", IEEE Transactions, Vol. PAS-102, No. 1, pp. 134-143, January 1983.
    • (1983) IEEE Transactions , vol.PAS-102 , Issue.1 , pp. 134-143
    • Giorsetto, P.1    Utsurogi, K.F.2
  • 4
    • 0021388829 scopus 로고
    • Reliability modeling of large wind farms and associated electric utility interface systems
    • March
    • X. Wang, H. Dai, and R. Thomas, "Reliability modeling of large wind farms and associated electric utility interface systems", IEEE Transactions, Vol. PAS-103, No. 3, pp. 569-575, March 1984.
    • (1984) IEEE Transactions , vol.PAS-103 , Issue.3 , pp. 569-575
    • Wang, X.1    Dai, H.2    Thomas, R.3
  • 5
    • 27144467492 scopus 로고    scopus 로고
    • A. A. Chowdhury, Reliability Models for Large Wind Farms in Generation System Planning, in Proceedings of 2005 IEEE PES Annual General Meeting, San Francisco, CA, June 12-16, 2005.
    • A. A. Chowdhury, "Reliability Models for Large Wind Farms in Generation System Planning", in Proceedings of 2005 IEEE PES Annual General Meeting, San Francisco, CA, June 12-16, 2005.
  • 7
    • 14544271494 scopus 로고    scopus 로고
    • Operational Reserve of a Power system with Large Amount of Wind Generation
    • Iowa State University, Ames, Iowa, Sept. 12-16
    • E. Gouveia and M. Matos, "Operational Reserve of a Power system with Large Amount of Wind Generation 8th International Conference on Probabilistic Methods to Power Systems, Iowa State University, Ames, Iowa, Sept. 12-16, 2004.
    • (2004) 8th International Conference on Probabilistic Methods to Power Systems
    • Gouveia, E.1    Matos, M.2
  • 8
    • 71849085881 scopus 로고    scopus 로고
    • NERC/WECC Planning Standards
    • NERC/WECC Planning Standards
  • 9
    • 84990973394 scopus 로고    scopus 로고
    • Reliability Evaluation of Power Systems
    • 2nd edition
    • R. Billinton, R. Allan, "Reliability Evaluation of Power Systems," Plenum Press, 2nd edition, 1996.
    • (1996) Plenum Press
    • Billinton, R.1    Allan, R.2
  • 10
    • 33947319093 scopus 로고    scopus 로고
    • Considering Load-Carrying Capability and Wind Speed Correlation of WECS in Generation Adequacy Assessment
    • Sept
    • W. Wangdee and R. Billionton, "Considering Load-Carrying Capability and Wind Speed Correlation of WECS in Generation Adequacy Assessment", IEEE Trans. On Energy Conversion, Vol. 21, No. 3, Sept. 2006, pp734-741.
    • (2006) IEEE Trans. On Energy Conversion , vol.21 , Issue.3 , pp. 734-741
    • Wangdee, W.1    Billionton, R.2
  • 11
    • 0018040081 scopus 로고
    • Reliability Evaluation in Energy Limited Generating Capacity Studies
    • Nov/Dec
    • R. Billionton and P. Harrington, "Reliability Evaluation in Energy Limited Generating Capacity Studies," IEEE Trans. On Power Apparatus and Systems, Vol. PAS-97, No. 6, Nov/Dec, 1978, pp. 2076-2085.
    • (1978) IEEE Trans. On Power Apparatus and Systems , vol.PAS-97 , Issue.6 , pp. 2076-2085
    • Billionton, R.1    Harrington, P.2
  • 12
    • 0018544097 scopus 로고
    • IEEE Reliability Test System
    • Reliability Test System Task Force, Nov./Dec
    • Reliability Test System Task Force, "IEEE Reliability Test System," IEEE Trans. On Power Apparatus and Systems, Vol. PAS-98, No. 6, Nov./Dec., 1979, pp. 2047-2054.
    • (1979) IEEE Trans. On Power Apparatus and Systems , vol.PAS-98 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.