메뉴 건너뛰기




Volumn 33, Issue 12, 2009, Pages 2091-2105

Centralized-decentralized optimization for refinery scheduling

Author keywords

Centralized; Decentralized; Optimization; Refinery; Scheduling

Indexed keywords

DECENTRALIZED OPTIMIZATION; DECOMPOSITION SCHEME; DECOMPOSITION STRATEGY; GLOBAL OPTIMALITY; INTERMEDIATE STORAGE; OPTIMAL RESULTS; OPTIMAL SCHEDULE; OPTIMALITY; OPTIMIZATION STRATEGY; REFINERY SCHEDULING; SUB-SYSTEMS;

EID: 71549139151     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compchemeng.2009.06.010     Document Type: Article
Times cited : (34)

References (14)
  • 2
    • 9644308639 scopus 로고
    • Partitioning procedures for solving mixed-variables programming problems
    • Benders J.F. Partitioning procedures for solving mixed-variables programming problems. Numerische Mathematic 4 (1962) 238-252
    • (1962) Numerische Mathematic , vol.4 , pp. 238-252
    • Benders, J.F.1
  • 3
    • 19944363902 scopus 로고    scopus 로고
    • The multi-item replenishment problem in a two-echelon supply chain: The effect of centralization versus decentralization
    • Chen J.M., and Chen T.H. The multi-item replenishment problem in a two-echelon supply chain: The effect of centralization versus decentralization. Computers & Operations Research 32 (2005) 3191-3207
    • (2005) Computers & Operations Research , vol.32 , pp. 3191-3207
    • Chen, J.M.1    Chen, T.H.2
  • 4
    • 0038112232 scopus 로고    scopus 로고
    • Prodcution planning of a multi-site manufacturing system by hybrid modeling: A case study from the automotive industry
    • Gnoni M., Iavagnilio R., Mossa G., Mummolo G., and Leva A.D. Prodcution planning of a multi-site manufacturing system by hybrid modeling: A case study from the automotive industry. International Journal of Production Economics 85 (2003) 251-262
    • (2003) International Journal of Production Economics , vol.85 , pp. 251-262
    • Gnoni, M.1    Iavagnilio, R.2    Mossa, G.3    Mummolo, G.4    Leva, A.D.5
  • 5
    • 0035890549 scopus 로고    scopus 로고
    • A decomposition approach for the scheduling of a steel plant production
    • Harjunkoski I., and Grossmann I.E. A decomposition approach for the scheduling of a steel plant production. Computers and Chemical Engineering 25 (2001) 1647-1660
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 1647-1660
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 6
    • 0032216046 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling 2. Continuous and semicontinuous processes
    • Ierapetritou M.G., and Floudas C.A. Effective continuous-time formulation for short-term scheduling 2. Continuous and semicontinuous processes. Industrial & Engineering Chemistry Research 37 11 (1998) 4360-4374
    • (1998) Industrial & Engineering Chemistry Research , vol.37 , Issue.11 , pp. 4360-4374
    • Ierapetritou, M.G.1    Floudas, C.A.2
  • 7
    • 0032877613 scopus 로고    scopus 로고
    • Effective continuous-time formulation for short-term scheduling: 3 Multiple intermediate due dates
    • Ierapetritou M.G., Hene T.S., and Floudas C.A. Effective continuous-time formulation for short-term scheduling: 3 Multiple intermediate due dates. Industrial & Engineering Chemical Research 38 9 (1999) 3446-3461
    • (1999) Industrial & Engineering Chemical Research , vol.38 , Issue.9 , pp. 3446-3461
    • Ierapetritou, M.G.1    Hene, T.S.2    Floudas, C.A.3
  • 8
    • 0038310819 scopus 로고    scopus 로고
    • Refinery short-term scheduling using continuous time formulation: Crude-oil operations
    • Jia Z., Ierapetritou M., and Kelly J.D. Refinery short-term scheduling using continuous time formulation: Crude-oil operations. Industrial & Engineering Chemical Research 42 (2003) 3085-3097
    • (2003) Industrial & Engineering Chemical Research , vol.42 , pp. 3085-3097
    • Jia, Z.1    Ierapetritou, M.2    Kelly, J.D.3
  • 9
    • 50549101227 scopus 로고    scopus 로고
    • Hierarchical decomposition heuristic for scheduling: Coordinated reasoning for decentralized and distributed decision-making problems
    • Kelly J.D., and Zyngier D. Hierarchical decomposition heuristic for scheduling: Coordinated reasoning for decentralized and distributed decision-making problems. Computers and Chemical Engineering 32 (2008) 2684-2705
    • (2008) Computers and Chemical Engineering , vol.32 , pp. 2684-2705
    • Kelly, J.D.1    Zyngier, D.2
  • 10
    • 30344468781 scopus 로고    scopus 로고
    • A decomposition framework for the scheduling of single- and multi-stage processes
    • Maravelias C.T. A decomposition framework for the scheduling of single- and multi-stage processes. Computers & Chemical Engineering 30 3 (2006) 407-420
    • (2006) Computers & Chemical Engineering , vol.30 , Issue.3 , pp. 407-420
    • Maravelias, C.T.1
  • 12
    • 0036532644 scopus 로고    scopus 로고
    • Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure
    • Roslof J., Harjunkoski I., Westerlund T., and Isaksson J. Solving a large-scale industrial scheduling problem using MILP combined with a heuristic procedure. European Journal of Operational Research 138 1 (2002) 29-42
    • (2002) European Journal of Operational Research , vol.138 , Issue.1 , pp. 29-42
    • Roslof, J.1    Harjunkoski, I.2    Westerlund, T.3    Isaksson, J.4
  • 14
    • 58149138903 scopus 로고    scopus 로고
    • Centralized and decentralized control policies for a two-stage stochastic supply chain with subcontracting
    • Saharidis G.K.D., Kouikoglou V.S., and Dallery Y. Centralized and decentralized control policies for a two-stage stochastic supply chain with subcontracting. International Journal of Production Economics 117 1 (2009) 117-126
    • (2009) International Journal of Production Economics , vol.117 , Issue.1 , pp. 117-126
    • Saharidis, G.K.D.1    Kouikoglou, V.S.2    Dallery, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.