메뉴 건너뛰기




Volumn , Issue , 2009, Pages 124-129

Are software engineers' responses to incomplete requirements related to project characteristics?

Author keywords

[No Author keywords available]

Indexed keywords

EMPIRICAL STUDIES; HIGH-QUALITY SOFTWARE; PROJECT CHARACTERISTICS; SOFTWARE ENGINEERS; SOFTWARE PRODUCT QUALITY; SOFTWARE REQUIREMENTS;

EID: 71449088007     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/ICADIWT.2009.5273869     Document Type: Conference Paper
Times cited : (4)

References (17)
  • 2
    • 0030107431 scopus 로고    scopus 로고
    • Identifying Quality-requirement Conflicts
    • Mar
    • B. Boehm, "Identifying Quality-requirement Conflicts", IEEE Software, Mar 1996, Volume: 13, Issue: 2, pp. 25-35.
    • (1996) IEEE Software , vol.13 , Issue.2 , pp. 25-35
    • Boehm, B.1
  • 3
    • 34748841665 scopus 로고    scopus 로고
    • B.H.C. Cheng, and J.M. Atlee, Research Directions in Requirements Engineering, Future of Software Engineering (FOSE '07), IEEE 2007, 23-25 May 2007, pp. 285-303.
    • B.H.C. Cheng, and J.M. Atlee, "Research Directions in Requirements Engineering", Future of Software Engineering (FOSE '07), IEEE 2007, 23-25 May 2007, pp. 285-303.
  • 4
    • 34748904800 scopus 로고    scopus 로고
    • B. Zagajsek, K. Separovic, Z. Car, Requirements Management Process Model for Software Development Based on Legacy System Functionalities, 9th International Conference on Telecommunications, (ConTel 2007), 13-15 June 2007 pp.115-122.
    • B. Zagajsek, K. Separovic, Z. Car, "Requirements Management Process Model for Software Development Based on Legacy System Functionalities", 9th International Conference on Telecommunications, (ConTel 2007), 13-15 June 2007 pp.115-122.
  • 6
    • 33947125957 scopus 로고    scopus 로고
    • An Empirical Study of the Complex Relationships between Requirements Engineering Processes and Other Processes that Lead to Payoffs in Productivity, Quality, and Risk Management
    • July
    • D. Damian and J. Chisan, "An Empirical Study of the Complex Relationships between Requirements Engineering Processes and Other Processes that Lead to Payoffs in Productivity, Quality, and Risk Management", IEEE Transactions on Software Engineering, Volume 32, Issue 7, July 2006, pp.433-453.
    • (2006) IEEE Transactions on Software Engineering , vol.32 , Issue.7 , pp. 433-453
    • Damian, D.1    Chisan, J.2
  • 7
    • 0035393371 scopus 로고    scopus 로고
    • Requirements Engineering as a Success Factor in Software Projects
    • July-Aug
    • H.F. Hoffman, and F. Lehner, "Requirements Engineering as a Success Factor in Software Projects", IEEE Software, July-Aug 2001, pp. 58-66.
    • (2001) IEEE Software , pp. 58-66
    • Hoffman, H.F.1    Lehner, F.2
  • 8
    • 0034654989 scopus 로고    scopus 로고
    • Requirements Engineering: Making the Connection Between the Software Developer and Customer
    • H. Saiedian, and R. Dale, "Requirements Engineering: Making the Connection Between the Software Developer and Customer", Information and Software Technology, 42(2000), pp. 419-428.
    • (2000) Information and Software Technology , vol.42 , pp. 419-428
    • Saiedian, H.1    Dale, R.2
  • 9
    • 71449101970 scopus 로고    scopus 로고
    • IEEE Std. 830-1998, IEEE Recommended Practice for Software Requirements Specifications, IEEE, 25 June 1998.
    • IEEE Std. 830-1998, IEEE Recommended Practice for Software Requirements Specifications, IEEE, 25 June 1998.
  • 11
    • 44149087879 scopus 로고    scopus 로고
    • Implementing Requirements Engineering Processes: Using Cooperative Self-Assessment and Improvement
    • J. Dörr, S. Adam, M. Eisenbarth, and M. Ehresman, "Implementing Requirements Engineering Processes: Using Cooperative Self-Assessment and Improvement", IEEE Software, Volume 25, Issue 3, 2008, pp. 71-77.
    • (2008) IEEE Software , vol.25 , Issue.3 , pp. 71-77
    • Dörr, J.1    Adam, S.2    Eisenbarth, M.3    Ehresman, M.4
  • 12
    • 0024900105 scopus 로고
    • Adaptations to the Systems Engineering Management Process for Projects with Incomplete Requirements
    • 24-26 Aug
    • J.K. Willoughby, "Adaptations to the Systems Engineering Management Process for Projects with Incomplete Requirements", Proceedings of IEEE International Conference on Systems Engineering, 24-26 Aug. 1989, pp.197-200.
    • (1989) Proceedings of IEEE International Conference on Systems Engineering , pp. 197-200
    • Willoughby, J.K.1
  • 13
    • 33947426830 scopus 로고    scopus 로고
    • Software Effort, Quality, and Cycle Time:A Study of CMM Level 5 Projects
    • March
    • M. Agrawal, and K. Chari, "Software Effort, Quality, and Cycle Time:A Study of CMM Level 5 Projects", IEEE Transactions on Software Engineering, Volume 33, Issue 3, March 2007, pp.145-156.
    • (2007) IEEE Transactions on Software Engineering , vol.33 , Issue.3 , pp. 145-156
    • Agrawal, M.1    Chari, K.2
  • 16
    • 1842530790 scopus 로고    scopus 로고
    • Never go to a client meeting without a prototype [software prototyping]
    • Mar-Apr
    • M. Schrage, "Never go to a client meeting without a prototype [software prototyping], IEEE Software, Volume 21, Issue 2, Mar-Apr 2004, pp.42-45.
    • (2004) IEEE Software , vol.21 , Issue.2 , pp. 42-45
    • Schrage, M.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.