Volumn 33, Issue 20, 2009, Pages 67-72

Substation equipment condition monitoring system and IEC model coordination

Author keywords

Condition monitoring; IEC 61850; IEC 61970; Information integration; Information model; Substation

Indexed keywords

IEC 61850; IEC 61970; INFORMATION INTEGRATION; INFORMATION MODEL; INFORMATION MODELS;

EID: 70749092192     PISSN: 10001026     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (22)

References (16)
  • 1
    • 0242306057 scopus 로고    scopus 로고
    • Substation automation: IED integration and availability of information
    • Mcdonald J D. Substation automation: IED integration and availability of information. IEEE Power and Energy Magazine, 2003, 1(2): 22-31.
    • (2003) IEEE Power and Energy Magazine , vol.1 , Issue.2 , pp. 22-31
    • Mcdonald, J.D.1
  • 2
    • 45449088480 scopus 로고    scopus 로고
    • Present situation and development of condition on-line monitoring and diagnosis technology for power transmission and transformation equipment
    • Sun Caixin. Present situation and development of condition on-line monitoring and diagnosis technology for power transmission and transformation equipment. Electric Power, 2005, 38(2): 1-7.
    • (2005) Electric Power , vol.38 , Issue.2 , pp. 1-7
    • Sun, C.1
  • 3
    • 36248947975 scopus 로고    scopus 로고
    • Application of on-line monitoring technology on power grid
    • Zou Jianming. Application of on-line monitoring technology on power grid. High Voltage Engineering, 2007, 33(8): 203-206.
    • (2007) High Voltage Engineering , vol.33 , Issue.8 , pp. 203-206
    • Zou, J.1
  • 4
    • 70749098681 scopus 로고    scopus 로고
    • Chinese source
    • 2008:1-14.
    • (2008) , pp. 1-14
  • 6
    • 2542491170 scopus 로고    scopus 로고
    • Power system security and its prevention
    • Han Zhenxiang, Cao Yijia. Power system security and its prevention. Power System Technology, 2004, 28(9): 1-6.
    • (2004) Power System Technology , vol.28 , Issue.9 , pp. 1-6
    • Han, Z.1    Cao, Y.2
  • 7
    • 33845801010 scopus 로고    scopus 로고
    • Introduction of 2003 IEC TC 57 annual meeting
    • Tan Wenshu, Liu Guoding, Liu Peijuan, et al. Introduction of 2003 IEC TC 57 annual meeting. Automation of Electric Power Systems, 2004, 28(4): 1-3.
    • (2004) Automation of Electric Power Systems , vol.28 , Issue.4 , pp. 1-3
    • Tan, W.1    Liu, G.2    Liu, P.3
  • 8
    • 70749137933 scopus 로고    scopus 로고
    • 2005 IEC TC 57 annual meeting and recent work of SAC/TC 82
    • Liu Guoding, Wang Like. 2005 IEC TC 57 annual meeting and recent work of SAC/TC 82. Automation of Electric Power Systems, 2006, 30(5): 1-4.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.5 , pp. 1-4
    • Liu, G.1    Wang, L.2
  • 9
    • 63049127561 scopus 로고    scopus 로고
    • A method for electric power equipment remote control based on IEC 61850
    • Wang Dewen, Zhu Yongli, Di Jian, et al. A method for electric power equipment remote control based on IEC 61850. Automation of Electric Power Systems, 2009, 33(5): 50-54.
    • (2009) Automation of Electric Power Systems , vol.33 , Issue.5 , pp. 50-54
    • Wang, D.1    Zhu, Y.2    Di, J.3
  • 10
    • 0142230075 scopus 로고    scopus 로고
    • Key issues in the design of master station of relay protection and fault information system
    • Zhang Jianmin, Zhu Bingquan, Jiang Yueliang, et al. Key issues in the design of master station of relay protection and fault information system. Automation of Electric Power Systems, 2003, 27(14): 72-74.
    • (2003) Automation of Electric Power Systems , vol.27 , Issue.14 , pp. 72-74
    • Zhang, J.1    Zhu, B.2    Jiang, Y.3
  • 14
    • 33845765846 scopus 로고    scopus 로고
    • Coordination between IEC 61850 and IEC 61970 for the protection model
    • Liu Ming, He Guangyu. Coordination between IEC 61850 and IEC 61970 for the protection model. Automation of Electric Power Systems, 2006, 30(22): 7-11.
    • (2006) Automation of Electric Power Systems , vol.30 , Issue.22 , pp. 7-11
    • Liu, M.1    He, G.2
  • 15
    • 63049084301 scopus 로고    scopus 로고
    • Research on seamless communication system based on IEC 61850 and 61970
    • Hu Liang, Wang Qian. Research on seamless communication system based on IEC 61850 and 61970. Telecommunications for Electric Power System, 2007, 28(182): 15-20.
    • (2007) Telecommunications for Electric Power System , vol.28 , Issue.182 , pp. 15-20
    • Hu, L.1    Wang, Q.2
  • 16
    • 58249141394 scopus 로고    scopus 로고
    • Power transformer condition assessment based on improved evidential reasoning
    • Zhu Chengzhi, Guo Chuangxin, Sun Min, et al. Power transformer condition assessment based on improved evidential reasoning. High Voltage Engineering, 2008, 34(11): 2332-2337.
    • (2008) High Voltage Engineering , vol.34 , Issue.11 , pp. 2332-2337
    • Zhu, C.1    Guo, C.2    Sun, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.