|
Volumn 3, Issue , 2007, Pages 1852-1860
|
A model for short-term supply chain management of a LNG production system
a b b c a
b
Sarawak Shell Berhad
*
(Malaysia)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COMPLEX PRODUCTION;
CUSTOMER REQUIREMENTS;
EAST MALAYSIA;
GAS PRODUCTIONS;
GLOBAL OPTIMALITY;
MATHEMATICAL REPRESENTATIONS;
MIXED INTEGER NONLINEAR PROGRAM;
MULTI OBJECTIVE;
MULTICOMMODITY NETWORKS;
MULTIPLE QUALITY;
NATURAL-GAS PRODUCTION;
NONCONVEX;
NONLINEAR PRESSURE;
OPERATIONAL PLANNING;
OPERATIONAL POLICY;
PHYSICAL SYSTEMS;
PLANNING MODELS;
PRODUCTION LEVEL;
PRODUCTION SYSTEM;
SARAWAK;
TWO-COMPONENT;
GAS INDUSTRY;
GAS PIPELINES;
GAS PRODUCERS;
INTEGER PROGRAMMING;
MODELS;
NATURAL GAS;
NATURAL GAS WELL PRODUCTION;
PETROLEUM ENGINEERING;
PRODUCTION ENGINEERING;
SUPPLY CHAIN MANAGEMENT;
SUPPLY CHAINS;
NATURAL GAS WELLS;
|
EID: 70449679071
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: None Document Type: Conference Paper |
Times cited : (8)
|
References (11)
|