메뉴 건너뛰기




Volumn 5, Issue 5, 2009, Pages 407-417

Twim: A MATLAB toolbox for real-time evaluation and monitoring of traffic loads on railway bridges

Author keywords

Acceleration; B WIM; Bridges; Dynamics; Monitoring; Railways; Traffic loads; Weigh in motion

Indexed keywords

AUTO CALIBRATION; AUTOMATIC IDENTIFICATION; B-WIM; BRIDGE-TYPE; COMPUTER LANGUAGE; MATLAB TOOLBOXES; OFFLINE; RAILWAY BRIDGES; RAILWAY TRAFFIC; RAILWAYS; TRAFFIC LOADS; TRAIN PASSAGES; VISUALIZATION FUNCTIONS; WEIGH IN MOTION;

EID: 70449674541     PISSN: 15732479     EISSN: 17448980     Source Type: Journal    
DOI: 10.1080/15732470701478370     Document Type: Article
Times cited : (10)

References (7)
  • 2
    • 23844511791 scopus 로고    scopus 로고
    • Monitoring traffic loads and dynamic effects using an instrumented railway bridge
    • Karoumi, R., Wiberg, J. and Liljencrantz, A., 2005. Monitoring traffic loads and dynamic effects using an instrumented railway bridge. Engineering Structures, 27, 1813-1819.
    • (2005) Engineering Structures , vol.27 , pp. 1813-1819
    • Karoumi, R.1    Wiberg, J.2    Liljencrantz, A.3
  • 4
    • 0018467733 scopus 로고
    • Weigh-in-motion system using instrumented bridges
    • Moses, F., 1979. Weigh-in-motion system using instrumented bridges. ASCE Transportation Engineering Journal, 105, 233-249.
    • (1979) ASCE Transportation Engineering Journal , vol.105 , pp. 233-249
    • Moses, F.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.