-
2
-
-
70449641890
-
-
Dept. of Industrial Eng. Georgia Institute of Technology, Tech. Report
-
Applegate, D., Cook, W., Dash, S. and Mevenkamp, M., 2003. QSOpt reference manual. Dept. of Industrial Eng. Georgia Institute of Technology, Tech. Report.
-
(2003)
QSOpt Reference Manual
-
-
Applegate, D.1
Cook, W.2
Dash, S.3
Mevenkamp, M.4
-
3
-
-
0025486185
-
The performance of push and pull systems: A corrected analysis
-
Baker, K.R., Powell, S.G. and Pyke, D.F., 1990. The performance of push and pull systems: A corrected analysis. International Journal of Production Research, 28 (9), 1731-1736.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.9
, pp. 1731-1736
-
-
Baker, K.R.1
Powell, S.G.2
Pyke, D.F.3
-
4
-
-
24144433223
-
Available to promise
-
D. Simchi-Levi, S.D. Wu and Z.M. Shen, eds. New York: Springer's Intl. Series
-
Ball, M.O., Chen, C.-Y. and Zhao, Z.-Y., 2004. Available to promise, In: D. Simchi-Levi, S.D. Wu and Z.M. Shen, eds. Handbook of quantitative supply chain analysis: modeling in the e-business era. New York: Springer's Intl. Series, 447-483.
-
(2004)
Handbook of Quantitative Supply Chain Analysis: Modeling in the E-business Era
, pp. 447-483
-
-
Ball, M.O.1
Chen, C.-Y.2
Zhao, Z.-Y.3
-
5
-
-
46149116982
-
-
Boston, MA: AMR Research Inc
-
Cecere, L., Hofman, D., Martin, R. and Preslan, L., 2005. The handbook for becoming demand driven. Boston, MA: AMR Research Inc.
-
(2005)
The Handbook for Becoming Demand Driven
-
-
Cecere, L.1
Hofman, D.2
Martin, R.3
Preslan, L.4
-
6
-
-
0035730939
-
Quantity and due-date quoting available to promise
-
Chen, C.-Y., Zhao, Z.-Y. and Ball, M.O., 2001. Quantity and due-date quoting available to promise. Information Systems Frontiers, 3 (4), 477-488.
-
(2001)
Information Systems Frontiers
, vol.3
, Issue.4
, pp. 477-488
-
-
Chen, C.-Y.1
Zhao, Z.-Y.2
Ball, M.O.3
-
7
-
-
5144232771
-
A model for batch advanced available to promise
-
Chen, C.-Y., Zhao, Z.-Y. and Ball, M.O., 2002. A model for batch advanced available to promise. Production and Operations Management, 11 (4), 424-440.
-
(2002)
Production and Operations Management
, vol.11
, Issue.4
, pp. 424-440
-
-
Chen, C.-Y.1
Zhao, Z.-Y.2
Ball, M.O.3
-
9
-
-
34547373834
-
Hierarchical production planning for multi-product lines in the beverage industry
-
Christou, I.T., Lagodimos, A.G. and Lycopoulou, D., 2007. Hierarchical production planning for multi-product lines in the beverage industry. Journal of Production Planning & Control, 18 (5), 367-376.
-
(2007)
Journal of Production Planning & Control
, vol.18
, Issue.5
, pp. 367-376
-
-
Christou, I.T.1
Lagodimos, A.G.2
Lycopoulou, D.3
-
10
-
-
46149124741
-
Moving toward dynamic available to promise
-
P.I. Gass and A.T. Jones, eds. College Park, MD: R.H. School of Business, University of Maryland, Manufacturing Engineering Laboratory
-
Ervolina, T. and Dietrich, B., 2001. Moving toward dynamic available to promise, In: P.I. Gass and A.T. Jones, eds. Supply chain management practice & research: status and future directions. College Park, MD: R.H. School of Business, University of Maryland, Manufacturing Engineering Laboratory.
-
(2001)
Supply Chain Management Practice & Research: Status and Future Directions
-
-
Ervolina, T.1
Dietrich, B.2
-
13
-
-
25144508112
-
To pull or not to pull: What is the question?
-
Hopp, W.J. and Spearman, M.L., 2004. To pull or not to pull: what is the question? Manufacturing & Service Operations Management, 6 (2), 133-148.
-
(2004)
Manufacturing & Service Operations Management
, vol.6
, Issue.2
, pp. 133-148
-
-
Hopp, W.J.1
Spearman, M.L.2
-
14
-
-
77951703636
-
Demand fulfillment and ATP
-
H. Stadtler and C. Kilger, eds. Berlin, Germany: Springer
-
Kilger, C. and Schneeweiss, L., 2005. Demand fulfillment and ATP, In: H. Stadtler and C. Kilger, eds. Supply chain management and advanced planning: concepts, models, software and case studies. Berlin, Germany: Springer.
-
(2005)
Supply Chain Management and Advanced Planning: Concepts, Models, Software and Case Studies
-
-
Kilger, C.1
Schneeweiss, L.2
-
15
-
-
0034297778
-
Greedy heuristic algorithms for manpower shift planning
-
Lagodimos, A.G. and Leopoulos, V., 2000. Greedy heuristic algorithms for manpower shift planning. International Journal of Production Economics, 68 (1), 95-106.
-
(2000)
International Journal of Production Economics
, vol.68
, Issue.1
, pp. 95-106
-
-
Lagodimos, A.G.1
Leopoulos, V.2
-
16
-
-
33646923794
-
Improved heuristic for manpower shift planning with modified shift priorities
-
Lagodimos, A.G. and Paravantis, J., 2006. Improved heuristic for manpower shift planning with modified shift priorities. Journal of Production Planning & Control, 17 (3), 301-310.
-
(2006)
Journal of Production Planning & Control
, vol.17
, Issue.3
, pp. 301-310
-
-
Lagodimos, A.G.1
Paravantis, J.2
-
17
-
-
0005139234
-
Engineering the leagile supply chain
-
Mason-Jones, R., Naylor, B. and Towill, D.R., 2000. Engineering the leagile supply chain. International Journal of Agile Management Systems, 2 (1), 54-61.
-
(2000)
International Journal of Agile Management Systems
, vol.2
, Issue.1
, pp. 54-61
-
-
Mason-Jones, R.1
Naylor, B.2
Towill, D.R.3
-
18
-
-
9544231676
-
Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management
-
Pibernik, R., 2005. Advanced available-to-promise: classification, selected methods and requirements for operations and inventory management. International Journal of Production Economics, 93-94 (1), 239-252.
-
(2005)
International Journal of Production Economics
, vol.93-94
, Issue.1
, pp. 239-252
-
-
Pibernik, R.1
-
19
-
-
0002290605
-
Yield management at American air-lines
-
Smith, B., Leimkuhler, J., Darrow, R. and Samuels, J., 1992. Yield management at American air-lines. Interfaces, 22 (1), 8-31.
-
(1992)
Interfaces
, vol.22
, Issue.1
, pp. 8-31
-
-
Smith, B.1
Leimkuhler, J.2
Darrow, R.3
Samuels, J.4
-
20
-
-
0006191822
-
Finite capacity promising
-
Taylor, S.G. and Plenert, G.J., 1999. Finite capacity promising. Production and Inventory Management Journal, 40 (3), 50-56.
-
(1999)
Production and Inventory Management Journal
, vol.40
, Issue.3
, pp. 50-56
-
-
Taylor, S.G.1
Plenert, G.J.2
-
21
-
-
24144445337
-
Optimization-based available-to-promise with multi-stage resource availability
-
Zhao, Z., Ball, M.O. and Kotake, M., 2005. Optimization-based available-to-promise with multi-stage resource availability. Annals of Operations Research, 135 (1), 65-85.
-
(2005)
Annals of Operations Research
, vol.135
, Issue.1
, pp. 65-85
-
-
Zhao, Z.1
Ball, M.O.2
Kotake, M.3
|