메뉴 건너뛰기




Volumn 47, Issue 11, 2009, Pages 3063-3078

A hierarchical system for effective coordination of available-to-promise logic mechanisms

Author keywords

Aggregate planning; Available to promise; Customer order decoupling point; ERP; Optimisation; Production planning

Indexed keywords

AGGREGATE PLANNING; AVAILABLE-TO-PROMISE; CUSTOMER ORDER DECOUPLING POINT; OPTIMISATIONS; PRODUCTION PLANNING;

EID: 70449646479     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540701810786     Document Type: Article
Times cited : (18)

References (21)
  • 6
    • 0035730939 scopus 로고    scopus 로고
    • Quantity and due-date quoting available to promise
    • Chen, C.-Y., Zhao, Z.-Y. and Ball, M.O., 2001. Quantity and due-date quoting available to promise. Information Systems Frontiers, 3 (4), 477-488.
    • (2001) Information Systems Frontiers , vol.3 , Issue.4 , pp. 477-488
    • Chen, C.-Y.1    Zhao, Z.-Y.2    Ball, M.O.3
  • 9
    • 34547373834 scopus 로고    scopus 로고
    • Hierarchical production planning for multi-product lines in the beverage industry
    • Christou, I.T., Lagodimos, A.G. and Lycopoulou, D., 2007. Hierarchical production planning for multi-product lines in the beverage industry. Journal of Production Planning & Control, 18 (5), 367-376.
    • (2007) Journal of Production Planning & Control , vol.18 , Issue.5 , pp. 367-376
    • Christou, I.T.1    Lagodimos, A.G.2    Lycopoulou, D.3
  • 10
    • 46149124741 scopus 로고    scopus 로고
    • Moving toward dynamic available to promise
    • P.I. Gass and A.T. Jones, eds. College Park, MD: R.H. School of Business, University of Maryland, Manufacturing Engineering Laboratory
    • Ervolina, T. and Dietrich, B., 2001. Moving toward dynamic available to promise, In: P.I. Gass and A.T. Jones, eds. Supply chain management practice & research: status and future directions. College Park, MD: R.H. School of Business, University of Maryland, Manufacturing Engineering Laboratory.
    • (2001) Supply Chain Management Practice & Research: Status and Future Directions
    • Ervolina, T.1    Dietrich, B.2
  • 16
    • 33646923794 scopus 로고    scopus 로고
    • Improved heuristic for manpower shift planning with modified shift priorities
    • Lagodimos, A.G. and Paravantis, J., 2006. Improved heuristic for manpower shift planning with modified shift priorities. Journal of Production Planning & Control, 17 (3), 301-310.
    • (2006) Journal of Production Planning & Control , vol.17 , Issue.3 , pp. 301-310
    • Lagodimos, A.G.1    Paravantis, J.2
  • 18
    • 9544231676 scopus 로고    scopus 로고
    • Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management
    • Pibernik, R., 2005. Advanced available-to-promise: classification, selected methods and requirements for operations and inventory management. International Journal of Production Economics, 93-94 (1), 239-252.
    • (2005) International Journal of Production Economics , vol.93-94 , Issue.1 , pp. 239-252
    • Pibernik, R.1
  • 19
  • 21
    • 24144445337 scopus 로고    scopus 로고
    • Optimization-based available-to-promise with multi-stage resource availability
    • Zhao, Z., Ball, M.O. and Kotake, M., 2005. Optimization-based available-to-promise with multi-stage resource availability. Annals of Operations Research, 135 (1), 65-85.
    • (2005) Annals of Operations Research , vol.135 , Issue.1 , pp. 65-85
    • Zhao, Z.1    Ball, M.O.2    Kotake, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.