-
1
-
-
0037379102
-
Parallel GRASP with path-relinking for job shop scheduling
-
Aiex, R.M., Binato, S., and Resende, M.G.C., 2003. Parallel GRASP with path-relinking for job shop scheduling. Parallel Computing, 29, 393-430.
-
(2003)
Parallel Computing
, vol.29
, pp. 393-430
-
-
Aiex, R.M.1
Binato, S.2
Resende, M.G.C.3
-
3
-
-
15344338962
-
A robust design of simulated annealing approach for mixed model sequencing
-
Cho, H.S, Paik, C.H., Yoon, H.M., and Kim, H.G., 2005. A robust design of simulated annealing approach for mixed model sequencing. Computers & Industrial Engineering, 48, 753-764.
-
(2005)
Computers & Industrial Engineering
, vol.48
, pp. 753-764
-
-
Cho, H.S.1
Paik, C.H.2
Yoon, H.M.3
Kim, H.G.4
-
4
-
-
0000627315
-
Flight scheduling and maintenance base planning
-
Feo, T.A. and Bard, J., 1989. Flight scheduling and maintenance base planning. Management Science, 35 (12), 1415-1432.
-
(1989)
Management Science
, vol.35
, Issue.12
, pp. 1415-1432
-
-
Feo, T.A.1
Bard, J.2
-
5
-
-
33748423575
-
Algorithms for single machine total tardiness scheduling with sequence dependent setups
-
Gupta, S.R. and Smith, J., 2006. Algorithms for single machine total tardiness scheduling with sequence dependent setups. European Journal of Operational Research, 175, 722-739.
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 722-739
-
-
Gupta, S.R.1
Smith, J.2
-
6
-
-
13544275547
-
A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
-
Mansouri, S.A, 2005. A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines. European Journal of Operational Research, 167, 696-716.
-
(2005)
European Journal of Operational Research
, vol.167
, pp. 696-716
-
-
Mansouri, S.A.1
-
7
-
-
0032120278
-
JIT sequencing for mixed-model assembly lines with setups using tabu search
-
McMullen, P.R., 1998. JIT sequencing for mixed-model assembly lines with setups using tabu search. Production Planning and Controlling, 9 (5), 504-510.
-
(1998)
Production Planning and Controlling
, vol.9
, Issue.5
, pp. 504-510
-
-
McMullen, P.R.1
-
8
-
-
0001169951
-
A simulated annealing approach to mixed-model sequencing with multiple objectives on a JIT line
-
McMullen, P.R. and Frazier, G.V., 2000. A simulated annealing approach to mixed-model sequencing with multiple objectives on a JIT line. IIE Transactions, 32 (8), 679-686.
-
(2000)
IIE Transactions
, vol.32
, Issue.8
, pp. 679-686
-
-
McMullen, P.R.1
Frazier, G.V.2
-
9
-
-
0035545592
-
An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics
-
McMullen, P.R., 2001a. An efficient frontier approach to addressing JIT sequencing problems with setups via search heuristics. Computers & Industrial Engineering, 41, 335-353.
-
(2001)
Computers & Industrial Engineering
, vol.41
, pp. 335-353
-
-
McMullen, P.R.1
-
10
-
-
0035973393
-
A Kohonen self-organising map approach to addressing a multiple objective, mixed-model JIT sequencing problem
-
McMullen, P.R., 2001b. A Kohonen self-organising map approach to addressing a multiple objective, mixed-model JIT sequencing problem. International Journal of Production Economics, 72, 59-71.
-
(2001)
International Journal of Production Economics
, vol.72
, pp. 59-71
-
-
McMullen, P.R.1
-
11
-
-
0035385251
-
An ant colony optimisation approach to addressing a JIT sequencing problem with multiple objectives
-
McMullen, P.R., 2001c. An ant colony optimisation approach to addressing a JIT sequencing problem with multiple objectives. Artificial Intelligence in Engineering, 15, 309-317.
-
(2001)
Artificial Intelligence in Engineering
, vol.15
, pp. 309-317
-
-
McMullen, P.R.1
-
12
-
-
13444262276
-
A beam search heuristic method for mixed-model scheduling with setups
-
McMullen, P.R., 2005. A beam search heuristic method for mixed-model scheduling with setups. International Journal of Production Economics, 96, 273-283.
-
(2005)
International Journal of Production Economics
, vol.96
, pp. 273-283
-
-
McMullen, P.R.1
-
13
-
-
0001360372
-
Level schedules for mixed-model assembly lines in just-in-time production systems
-
Miltenburg, J., 1989. Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35 (2), 192-207.
-
(1989)
Management Science
, vol.35
, Issue.2
, pp. 192-207
-
-
Miltenburg, J.1
-
14
-
-
36248986205
-
Hybrid multi-objective particle swarm algorithm for a mixed-model assembly line sequencing problem
-
Rahimi-Vahed, A.R., Mirghorbani, S.M., and Rabbania, M., 2007. Hybrid multi-objective particle swarm algorithm for a mixed-model assembly line sequencing problem. Engineering Optimisation, 39 (8), 877-898.
-
(2007)
Engineering Optimisation
, vol.39
, Issue.8
, pp. 877-898
-
-
Rahimi-Vahed, A.R.1
Mirghorbani, S.M.2
Rabbania, M.3
-
15
-
-
0012587086
-
Chapter 8: Greedy randomised adaptive search procedures
-
F.W. Glower and G.A. Kochenberger, eds. Dordrecht: Kluwer Academic Publishers
-
Resende, M.G.C. and Riberio, C.C., 2002. Chapter 8: Greedy randomised adaptive search procedures, In: F.W. Glower and G.A. Kochenberger, eds. Handbook of Metaheuristics, International Series in Operations Research and Management Science, Volume 57. Dordrecht: Kluwer Academic Publishers, 219-249.
-
(2002)
Handbook of Metaheuristics, International Series in Operations Research and Management Science
, vol.57
, pp. 219-249
-
-
Resende, M.G.C.1
Riberio, C.C.2
-
16
-
-
35548975278
-
Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling
-
Sabuncuoglu,-I., Gocgun, Y., and Erel, E., 2008. Backtracking and exchange of information: methods to enhance a beam search algorithm for assembly line scheduling. European Journal of Operational Research, 186, 915-930.
-
(2008)
European Journal of Operational Research
, vol.186
, pp. 915-930
-
-
Sabuncuoglu, I.1
Gocgun, Y.2
Erel, E.3
-
17
-
-
33750480526
-
Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
-
Tavakkoli-Moghadam, R. and Rahimi-Vahed, A.R., 2006. Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system. Applied Mathematics and Computation, 181 (2), 1471-1481.
-
(2006)
Applied Mathematics and Computation
, vol.181
, Issue.2
, pp. 1471-1481
-
-
Tavakkoli-Moghadam, R.1
Rahimi-Vahed, A.R.2
|