메뉴 건너뛰기




Volumn 37, Issue 11, 2009, Pages 4549-4556

A regional energy paradox-the case of Central Norway

Author keywords

Investment incentives; Regulatory risk; Supply security

Indexed keywords

CAPACITY ADEQUACY; DEREGULATED ELECTRICITY MARKET; ENERGY INTENSIVE INDUSTRIES; ENERGY POTENTIAL; HYDROPOWER PLANTS; INVESTMENT INCENTIVES; LANDING SITE; REGULATORY RISKS; SUPPLY SECURITY; TRANSMISSION LINE;

EID: 70449426108     PISSN: 03014215     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enpol.2009.06.016     Document Type: Article
Times cited : (5)

References (34)
  • 1
    • 33746658157 scopus 로고    scopus 로고
    • Why has the Nordic electricity market worked so well?
    • Amundsen E.S., and Bergman L. Why has the Nordic electricity market worked so well?. Utilities Policy 14 (2006) 135-147
    • (2006) Utilities Policy , vol.14 , pp. 135-147
    • Amundsen, E.S.1    Bergman, L.2
  • 2
    • 33947719718 scopus 로고    scopus 로고
    • Integration of multiple national markets for electricity: the case of Norway and Sweden
    • Amundsen E.S., and Bergman L. Integration of multiple national markets for electricity: the case of Norway and Sweden. Energy Policy 35 (2007) 3383-3394
    • (2007) Energy Policy , vol.35 , pp. 3383-3394
    • Amundsen, E.S.1    Bergman, L.2
  • 3
    • 70449335974 scopus 로고    scopus 로고
    • The Norwegian Petroleum Directorate 02.05
    • Berge, G., 2007. Electrification of the shelf, The Norwegian Petroleum Directorate 02.05.2007, 〈http://www.npd.no/English/Emner/Ytre+miljo/Elektrifisering+av+sokkelen.htm〉.
    • (2007) Electrification of the shelf
    • Berge, G.1
  • 5
    • 72649103968 scopus 로고    scopus 로고
    • Removing policy based comparative advantage for energy intensive production
    • Discussion Paper no. 462, Research Department, Statistics Norway
    • Bye, T., Holmøy, E., Heide, K.M., 2006. Removing policy based comparative advantage for energy intensive production. Necessary adjustments of the real exchange rate and industry structure, Discussion Paper no. 462, Research Department, Statistics Norway.
    • (2006) Necessary adjustments of the real exchange rate and industry structure
    • Bye, T.1    Holmøy, E.2    Heide, K.M.3
  • 6
    • 43549122331 scopus 로고    scopus 로고
    • Inflow shortages in deregulated power markets-Reasons for concern?
    • Bye T., Bruvoll A.G., and Aune F.R. Inflow shortages in deregulated power markets-Reasons for concern?. Energy Economics 30 (2008) 1693-1711
    • (2008) Energy Economics , vol.30 , pp. 1693-1711
    • Bye, T.1    Bruvoll, A.G.2    Aune, F.R.3
  • 7
    • 33846679604 scopus 로고    scopus 로고
    • Generation adequacy: helping the market do its job
    • De Vries L.J. Generation adequacy: helping the market do its job. Utilities Policy 15 (2007) 20-35
    • (2007) Utilities Policy , vol.15 , pp. 20-35
    • De Vries, L.J.1
  • 8
    • 44649124291 scopus 로고    scopus 로고
    • The impact of electricity market design upon investment under uncertainty: the effectiveness of capacity mechanisms
    • De Vries L., and Heijnen P. The impact of electricity market design upon investment under uncertainty: the effectiveness of capacity mechanisms. Utilities Policy 16 3 (2008) 215-227
    • (2008) Utilities Policy , vol.16 , Issue.3 , pp. 215-227
    • De Vries, L.1    Heijnen, P.2
  • 9
    • 70449331177 scopus 로고    scopus 로고
    • Decision criteria for the use of SAKS-measures
    • ECON, Oslo
    • ECON, 2007. Decision criteria for the use of SAKS-measures, ECON-Report 2007, 113, Oslo.
    • (2007) ECON-Report 2007 , vol.113
  • 10
    • 72649100442 scopus 로고    scopus 로고
    • Is there a potential power crisis in Central Norway?
    • in Norwegian, /, Statistics Norway
    • Ericson, T., Halvorsen, B., 2007. Is there a potential power crisis in Central Norway? (in Norwegian), Økonomiske analyser 3/2007, Statistics Norway.
    • (2007) Økonomiske analyser , vol.3
    • Ericson, T.1    Halvorsen, B.2
  • 11
    • 72649084991 scopus 로고    scopus 로고
    • Ireland, Public Service Obligation in respect of new electricity generation capacity of security of supply
    • European Commission, 2003. State aid N 475/2003-Ireland, Public Service Obligation in respect of new electricity generation capacity of security of supply, 〈http://ec.europa.eu/community_law/state_aids/comp-2003/n475-03.pdf〉.
    • (2003) State aid , Issue.475
  • 12
    • 1842534961 scopus 로고    scopus 로고
    • Challenges when electricity markets face the investment phase
    • Finon D., Johnsen T.A., and Midttun A. Challenges when electricity markets face the investment phase. Energy Policy 32 (2004) 1355-1362
    • (2004) Energy Policy , vol.32 , pp. 1355-1362
    • Finon, D.1    Johnsen, T.A.2    Midttun, A.3
  • 13
    • 44649090090 scopus 로고    scopus 로고
    • Electricity and long-term capacity adequacy: the quest for regulatory mechanisms compatible with electricity market
    • Finon D., and Pignon V. Electricity and long-term capacity adequacy: the quest for regulatory mechanisms compatible with electricity market. Utilities Policy 16 3 (2008) 143-158
    • (2008) Utilities Policy , vol.16 , Issue.3 , pp. 143-158
    • Finon, D.1    Pignon, V.2
  • 14
    • 13244250872 scopus 로고    scopus 로고
    • Harvard University, Cambridge, Massachusetts (Working Paper, April 4)
    • Hogan W.W. Transmission Market Design (2003), Harvard University, Cambridge, Massachusetts (Working Paper, April 4)
    • (2003) Transmission Market Design
    • Hogan, W.W.1
  • 16
    • 55249092031 scopus 로고    scopus 로고
    • Security of supply and regulation of energy networks
    • Jamasb T., and Pollitt M. Security of supply and regulation of energy networks. Energy Policy 36 (2008) 4584-4589
    • (2008) Energy Policy , vol.36 , pp. 4584-4589
    • Jamasb, T.1    Pollitt, M.2
  • 17
    • 0037234542 scopus 로고    scopus 로고
    • Residential customers and competitive electricity markets: the case of Norway
    • Johnsen T.A. Residential customers and competitive electricity markets: the case of Norway. The Electricity Journal 16 1 (2003) 74-79
    • (2003) The Electricity Journal , vol.16 , Issue.1 , pp. 74-79
    • Johnsen, T.A.1
  • 18
    • 44649155457 scopus 로고    scopus 로고
    • Competitive electricity markets and investment in new generating capacity
    • Helm Dieter. (Ed), Oxford University Press, Oxford
    • Joskow P.L. Competitive electricity markets and investment in new generating capacity. In: Helm Dieter. (Ed). The New Energy Paradigm (2007), Oxford University Press, Oxford
    • (2007) The New Energy Paradigm
    • Joskow, P.L.1
  • 19
    • 44649102724 scopus 로고    scopus 로고
    • Capacity payments in imperfect electricity markets: need and design
    • Joskow P.L. Capacity payments in imperfect electricity markets: need and design. Utilities Policy 16 (2008) 159-170
    • (2008) Utilities Policy , vol.16 , pp. 159-170
    • Joskow, P.L.1
  • 22
    • 72649098419 scopus 로고    scopus 로고
    • NVE, 2008. Decision concerning concession application for gas power plant in Elnesvågen Fræna, Letter to Industrikraft Møre AS, March 5, 2008, (in Norwegian) the Norwegian Water Resource and Energy Directorate, Oslo 〈http://www.nve.no/admin/FileArchive/381/Bakgrunn%20for%20vedtak-IKM-gasskraftverk.pdf〉.
    • NVE, 2008. Decision concerning concession application for gas power plant in Elnesvågen Fræna, Letter to Industrikraft Møre AS, March 5, 2008, (in Norwegian) the Norwegian Water Resource and Energy Directorate, Oslo 〈http://www.nve.no/admin/FileArchive/381/Bakgrunn%20for%20vedtak-IKM-gasskraftverk.pdf〉.
  • 23
    • 0036897653 scopus 로고    scopus 로고
    • Demand response: reality versus "resource"
    • Ruff L.E. Demand response: reality versus "resource". The Electricity Journal 15 (2002) 10-23
    • (2002) The Electricity Journal , vol.15 , pp. 10-23
    • Ruff, L.E.1
  • 24
    • 72649100576 scopus 로고    scopus 로고
    • Sandsmark, M., Hervik, A., 2006. Problems in the regional electricity market-power intensive industries against the current in Central Norway (in Norwegian) Report 0612, Molde University College/Molde Research Institute, Molde.
    • Sandsmark, M., Hervik, A., 2006. Problems in the regional electricity market-power intensive industries against the current in Central Norway (in Norwegian) Report 0612, Molde University College/Molde Research Institute, Molde.
  • 26
    • 72649087260 scopus 로고    scopus 로고
    • Synergies between natural gas and electricity in Central Norway (in Norwegian)
    • December, Oslo
    • Statnett, 2005. Synergies between natural gas and electricity in Central Norway (in Norwegian), Report Statnett SF December 2005, Oslo.
    • (2005) Report Statnett SF
    • Statnett1
  • 28
    • 72649107513 scopus 로고    scopus 로고
    • Tariff brochure, 2009
    • Statnett, 2009. Tariff brochure, 2009 The main grid tariff 〈http://www.statnett.no/Documents/The%20power%20system/Tariff2009eng_v1.0_C.pdf〉.
    • (2009) The main grid tariff
  • 29
    • 72649099166 scopus 로고    scopus 로고
    • St.meld. no. 18, 2003-2004. Concerning supply security of electricity (White Paper in Norwegian), The Ministry of Petroleum and Energy, Oslo.
    • St.meld. no. 18, 2003-2004. Concerning supply security of electricity (White Paper in Norwegian), The Ministry of Petroleum and Energy, Oslo.
  • 31
    • 0038630922 scopus 로고    scopus 로고
    • Contrib Title: Ensuring adequate generation capacity
    • Turvey R. Contrib Title: Ensuring adequate generation capacity. Utilities Policy 11 (2003) 95-102
    • (2003) Utilities Policy , vol.11 , pp. 95-102
    • Turvey, R.1
  • 32
    • 10244234140 scopus 로고    scopus 로고
    • Infrastructure regulation and investment for the long-term and introduction
    • von Hirschhausen C., Beckers T., and Brenck A. Infrastructure regulation and investment for the long-term and introduction. Utilities Policy 12 (2004) 203-210
    • (2004) Utilities Policy , vol.12 , pp. 203-210
    • von Hirschhausen, C.1    Beckers, T.2    Brenck, A.3
  • 34
    • 1042266147 scopus 로고    scopus 로고
    • Generation capacity adequacy in the competitive electricity market environment
    • Wen F.S., Wu F.F., and Ni Y.X. Generation capacity adequacy in the competitive electricity market environment. Electrical Power & Energy Systems 26 (2004) 365-372
    • (2004) Electrical Power & Energy Systems , vol.26 , pp. 365-372
    • Wen, F.S.1    Wu, F.F.2    Ni, Y.X.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.