메뉴 건너뛰기




Volumn 31, Issue 9, 2009, Pages 1183-1188

Computer-aided simulation of steelmaking-continuous casting production scheduling

Author keywords

Gantt chart; Production scheduling; Simulation; Taboo search

Indexed keywords

CAST PLAN; CHARGE PLAN; COMPUTER AIDED SIMULATIONS; DYNAMIC ADJUSTMENT; DYNAMIC SCHEDULING; GANTT CHART; PRODUCTION SCHEDULING; SIMULATION; SIMULATION PROCESS; SIMULATION RESULT; STATIC SCHEDULING; TABOO SEARCH; WAITING-TIME;

EID: 70350527136     PISSN: 1001053X     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (10)

References (9)
  • 1
    • 6344264700 scopus 로고    scopus 로고
    • CIMS architecture upon the flat management pattern in iron and steel enterprise
    • Li H Y, Chai T Y. CIMS architecture upon the flat management pattern in iron and steel enterprise. J Northeast Univ Nat Sci, 2002, 23(8): 746
    • (2002) J Northeast Univ Nat Sci , vol.23 , Issue.8 , pp. 746
    • Li, H.Y.1    Chai, T.Y.2
  • 2
    • 70350537307 scopus 로고    scopus 로고
    • Research on model and optimization of production planning and scheduling based on iron and steel process knowledge network system
    • Wuhan: Wuhan University of Science and Technology
    • Jiang G Z. Research on Model and Optimization of Production Planning and Scheduling Based on Iron and Steel Process Knowledge Network System[Dissertation]. Wuhan: Wuhan University of Science and Technology, 2006: 12
    • (2006) , pp. 12
    • Jiang, G.Z.1
  • 3
    • 0004885467 scopus 로고    scopus 로고
    • Model and algorithm of furnace charge plan for steelmaking-continuous casting production scheduling
    • Tang L X, Yang Z H, Wang M G. Model and Algorithm of Furnace Charge Plan for Steelmaking-Continuous Casting Production Scheduling. J Northeast Univ Nat Sci, 1996, 17(4): 440
    • (1996) J Northeast Univ Nat Sci , vol.17 , Issue.4 , pp. 440
    • Tang, L.X.1    Yang, Z.H.2    Wang, M.G.3
  • 4
    • 0004215426 scopus 로고    scopus 로고
    • Boston: Kluwer Academic Publishers
    • Glover F, Laguna M. Tabu Search. Boston: Kluwer Academic Publishers, 1997
    • (1997) Tabu Search
    • Glover, F.1    Laguna, M.2
  • 5
    • 33747038625 scopus 로고    scopus 로고
    • A multi-agent system for the integrated dynamic scheduling of steel production
    • Nottingham: University of Nottingham
    • Ouelhadj D. A Multi-agent System for the Integrated Dynamic Scheduling of Steel Production[Dissertation]. Nottingham: University of Nottingham, 2003
    • (2003)
    • Ouelhadj, D.1
  • 6
    • 1642270229 scopus 로고    scopus 로고
    • Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures
    • Mikkel T J. Improving robustness and flexibility of tardiness and total flow-time job shops using robustness measures. Appl Soft Comput, 2001, 1(1): 35
    • (2001) Appl Soft Comput , vol.1 , Issue.1 , pp. 35
    • Mikkel, T.J.1
  • 7
    • 0034326104 scopus 로고    scopus 로고
    • Analysis of reactive scheduling problems in a job shop environment
    • Sabuncuoglu I, Bayiz M. Analysis of reactive scheduling problems in a job shop environment. Eur J Oper Res, 2000, 126(3): 567
    • (2000) Eur J Oper Res , vol.126 , Issue.3 , pp. 567
    • Sabuncuoglu, I.1    Bayiz, M.2
  • 8
    • 0344320671 scopus 로고    scopus 로고
    • A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources
    • Sun J, Xue D. A dynamic reactive scheduling mechanism for responding to changes of production orders and manufacturing resources. Comput Ind, 2001, 46(2): 189
    • (2001) Comput Ind , vol.46 , Issue.2 , pp. 189
    • Sun, J.1    Xue, D.2
  • 9
    • 0030286036 scopus 로고    scopus 로고
    • Study on steelmaking and continuous casting production scheduling
    • Tang L X, Yang Z H, Wang M G. Study on steelmaking and continuous casting production scheduling. Iron Steel. 1996, 31(11): 27
    • (1996) Iron Steel , vol.31 , Issue.11 , pp. 27
    • Tang, L.X.1    Yang, Z.H.2    Wang, M.G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.