-
1
-
-
33846295388
-
United States and Canada
-
US-Canada Power System Outage Task Force, 14, 2003 the Blackout in the, Online, Available
-
US-Canada Power System Outage Task Force, Final Report on August 14, 2003 the Blackout in the United States and Canada, 2004. [Online]. Available: https://reports.energy.gov/BlackoutFinal-Web.pdf.
-
(2004)
Final Report on August
-
-
-
2
-
-
70350456976
-
-
Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators Within the Eastern and Western Interconnections, U.S. Department of Energy and Federal Energy Regulatory Commission, 2006
-
Steps to Establish a Real-Time Transmission Monitoring System for Transmission Owners and Operators Within the Eastern and Western Interconnections, U.S. Department of Energy and Federal Energy Regulatory Commission, 2006.
-
-
-
-
3
-
-
0027573826
-
Synchronized phasor measurements in power systems
-
Apr
-
A. G. Phadke, "Synchronized phasor measurements in power systems," IEEE Comput. Appl. Power, vol. 6, no. 2, pp. 10-15, Apr. 1993.
-
(1993)
IEEE Comput. Appl. Power
, vol.6
, Issue.2
, pp. 10-15
-
-
Phadke, A.G.1
-
4
-
-
33749599515
-
Eastern interconnection phasor project
-
Jan
-
M. Donnelly, M. Ingram, and J. R. Carroll, "Eastern interconnection phasor project," in Proc. 39th Hawaii Int. Conf. System Sciences, Jan. 2006, pp. 336-342.
-
(2006)
Proc. 39th Hawaii Int. Conf. System Sciences
, pp. 336-342
-
-
Donnelly, M.1
Ingram, M.2
Carroll, J.R.3
-
5
-
-
34248549055
-
A distributed state estimator utilizing synchronized phasor measurements
-
May
-
W. Jiang, V. Vittal, and G. T. Heydt, "A distributed state estimator utilizing synchronized phasor measurements," IEEE Trans. Power Syst. vol. 22, pt. 2, pp. 563-571, May 2007.
-
(2007)
IEEE Trans. Power Syst
, vol.22
, Issue.PART. 2
, pp. 563-571
-
-
Jiang, W.1
Vittal, V.2
Heydt, G.T.3
-
6
-
-
33847674499
-
An alternative for including phasor measurements in state estimators
-
Nov
-
M. Zhou, V. A. Centeno, J. S. Thorp, and A. G. Phadke, "An alternative for including phasor measurements in state estimators," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1930-1937, Nov. 2006.
-
(2006)
IEEE Trans. Power Syst
, vol.21
, Issue.4
, pp. 1930-1937
-
-
Zhou, M.1
Centeno, V.A.2
Thorp, J.S.3
Phadke, A.G.4
-
7
-
-
0022150236
-
Real time voltage-phasor measurements for static state estimation
-
Nov
-
J. S. Thorp, A. G. Phadke, and K. J. Karimi, "Real time voltage-phasor measurements for static state estimation," IEEE Trans. Power App. Syst., vol. PAS-104, pp. 3098-3106, Nov. 1985.
-
(1985)
IEEE Trans. Power App. Syst
, vol.PAS-104
, pp. 3098-3106
-
-
Thorp, J.S.1
Phadke, A.G.2
Karimi, K.J.3
-
8
-
-
70350471185
-
PMU data characterization and application to stability monitoring
-
Nov
-
A. P. S. Meliopoulos, G. J. Cokkinides, O. Wasynczuk, E. Coyle, C. Hoffmann, C. Nita-Rotaru, T. Downar, L. Tsoukalas, and R. Gao, "PMU data characterization and application to stability monitoring," in Proc. 2006 IEEE Power Eng. Soc. Power Systems Conf. Expo., Nov. 2006, pp. 151-158.
-
(2006)
Proc. 2006 IEEE Power Eng. Soc. Power Systems Conf. Expo
, pp. 151-158
-
-
Meliopoulos, A.P.S.1
Cokkinides, G.J.2
Wasynczuk, O.3
Coyle, E.4
Hoffmann, C.5
Nita-Rotaru, C.6
Downar, T.7
Tsoukalas, L.8
Gao, R.9
-
9
-
-
36348946449
-
An online dynamic security assessment scheme using phasor measurements and decision trees
-
Nov
-
K. Sun, S. Likhate, V. Vittal, V. S. Kolluri, and S. Mandal, "An online dynamic security assessment scheme using phasor measurements and decision trees," IEEE Trans. Power Syst., vol. 22, no. 4, pp. 1935-1943, Nov. 2007.
-
(2007)
IEEE Trans. Power Syst
, vol.22
, Issue.4
, pp. 1935-1943
-
-
Sun, K.1
Likhate, S.2
Vittal, V.3
Kolluri, V.S.4
Mandal, S.5
-
10
-
-
13244255636
-
Real-time estimation of security from voltage collapse using synchronized phasor measurements
-
Jun
-
A. R. Khatib, R. F. Nuqui, M. R. Ingram, and A. G. Phadke, "Real-time estimation of security from voltage collapse using synchronized phasor measurements," in Proc. IEEE Power Eng. Soc. General Meeting, Jun. 2004, vol. 1, pp. 582-588.
-
(2004)
Proc. IEEE Power Eng. Soc. General Meeting
, vol.1
, pp. 582-588
-
-
Khatib, A.R.1
Nuqui, R.F.2
Ingram, M.R.3
Phadke, A.G.4
-
11
-
-
42549114687
-
Wide area frequency visualization using smart client technology
-
Jun
-
G. Zhang, P. Hirsch, and S. Lee, "Wide area frequency visualization using smart client technology," in Proc. IEEE Power Eng. Soc. General Meeting, Jun. 2007, pp. 1-8.
-
(2007)
Proc. IEEE Power Eng. Soc. General Meeting
, pp. 1-8
-
-
Zhang, G.1
Hirsch, P.2
Lee, S.3
-
13
-
-
85016819574
-
Visualization of large-scale power system operations using phasor measurements
-
Oct
-
S. Chun-Lien and J. Bo-Yuan, "Visualization of large-scale power system operations using phasor measurements," in Proc. Int. Conf. Power Systems Technology, Oct. 2006.
-
(2006)
Proc. Int. Conf. Power Systems Technology
-
-
Chun-Lien, S.1
Bo-Yuan, J.2
-
14
-
-
0027643798
-
Modeling circuit breakers in weighted least squares state estimation
-
Aug
-
A. Monticelli, "Modeling circuit breakers in weighted least squares state estimation," IEEE Trans. Power Syst., vol. 8, no. 3, pp. 1143-1149, Aug. 1993.
-
(1993)
IEEE Trans. Power Syst
, vol.8
, Issue.3
, pp. 1143-1149
-
-
Monticelli, A.1
-
15
-
-
0033881588
-
Electric power system state estimation
-
Feb
-
A. Monticelli, "Electric power system state estimation," Proc. IEEE vol. 88, no. 2, pp. 262-282, Feb. 2000.
-
(2000)
Proc. IEEE
, vol.88
, Issue.2
, pp. 262-282
-
-
Monticelli, A.1
-
17
-
-
0029404584
-
Identifying the unknown circuit breaker statuses in power networks
-
Nov
-
A. Abur, H. Kim, and M. Çelik, "Identifying the unknown circuit breaker statuses in power networks," IEEE Trans. Power Syst., vol. 10, no. 4, pp. 2029-2037, Nov. 1995.
-
(1995)
IEEE Trans. Power Syst
, vol.10
, Issue.4
, pp. 2029-2037
-
-
Abur, A.1
Kim, H.2
Çelik, M.3
-
18
-
-
33847612033
-
A topology error identification method directly based on collinearity tests
-
Nov
-
E. Lourenço, A. Costa, K. Clements, and R. Cernev, "A topology error identification method directly based on collinearity tests," IEEE Trans. Power Syst., vol. 21, no. 4, pp. 1920-1929, Nov. 2006.
-
(2006)
IEEE Trans. Power Syst
, vol.21
, Issue.4
, pp. 1920-1929
-
-
Lourenço, E.1
Costa, A.2
Clements, K.3
Cernev, R.4
-
19
-
-
33846295388
-
United States and Canada
-
US-Canada Power System Outage Task Force, 14, 2003 the Blackout in the, Online, Available
-
US-Canada Power System Outage Task Force, Final Report on August 14, 2003 the Blackout in the United States and Canada, 2004. [Online]. Available: https://reports.energy.gov/BlackoutFinal-Web.pdf.
-
(2004)
Final Report on August
-
-
-
20
-
-
70350476539
-
Online]. Available: http://www.oe.energy.gov/DocumentsandMedia/ Blackout-FinalImplementationReport(2).pdf
-
US-Canada Power System Outage Task Force, Recommendations, 2006
-
US-Canada Power System Outage Task Force, Final Report on the Implementation of the Task Force Recommendations, 2006. [Online]. Available: http://www.oe.energy.gov/DocumentsandMedia/ Blackout-FinalImplementationReport(2).pdf.
-
Final Report on the Implementation of the Task Force
-
-
-
21
-
-
33845335462
-
Post-contingency equilibrium analysis techniques for power systems
-
Oct
-
R. Yeu and P. Sauer, "Post-contingency equilibrium analysis techniques for power systems," in Proc. 37th North American Power Symp., Oct. 2005, pp. 429-433.
-
(2005)
Proc. 37th North American Power Symp
, pp. 429-433
-
-
Yeu, R.1
Sauer, P.2
-
22
-
-
13344259932
-
Performance of 'WAMS east' in providing dynamic information for the north east blackout of August 14, 2003
-
Jun
-
J. Hauer, N. Bhatt, K. Shah, and S. Kolluri, "Performance of 'WAMS east' in providing dynamic information for the north east blackout of August 14, 2003," in Proc. IEEE Power Eng. Soc. General Meeting, Jun. 2004, pp. 1685-1690.
-
(2004)
Proc. IEEE Power Eng. Soc. General Meeting
, pp. 1685-1690
-
-
Hauer, J.1
Bhatt, N.2
Shah, K.3
Kolluri, S.4
-
24
-
-
70350483730
-
-
IEEE Standard for Synchrophasors for Power Systems IEEE Standard, C37.118-2005, 2006.
-
IEEE Standard for Synchrophasors for Power Systems IEEE Standard, C37.118-2005, 2006.
-
-
-
-
26
-
-
2542549656
-
Role of distribution factors in congestion revenue rights applications
-
May
-
M. Liu and G. Gross, "Role of distribution factors in congestion revenue rights applications," IEEE Trans. Power Syst., vol. 19, no. 2, pp. 802-810, May 2004.
-
(2004)
IEEE Trans. Power Syst
, vol.19
, Issue.2
, pp. 802-810
-
-
Liu, M.1
Gross, G.2
-
29
-
-
0021464231
-
Analysis of linearized decoupled power flow approximations for steady-state security assessment
-
Jul
-
R. Kaye and F. Wu, "Analysis of linearized decoupled power flow approximations for steady-state security assessment," IEEE Trans. Circuits Syst., vol. 31, no. 7, pp. 623-636, Jul. 1984.
-
(1984)
IEEE Trans. Circuits Syst
, vol.31
, Issue.7
, pp. 623-636
-
-
Kaye, R.1
Wu, F.2
-
30
-
-
34248573848
-
Generalized line outage distribution factors
-
May
-
T. Guler, G. Gross, and M. Liu, "Generalized line outage distribution factors," IEEE Trans. Power Syst., vol. 22, no. 2, pp. 879-881, May 2007.
-
(2007)
IEEE Trans. Power Syst
, vol.22
, Issue.2
, pp. 879-881
-
-
Guler, T.1
Gross, G.2
Liu, M.3
-
31
-
-
28244454603
-
Power system frequency monitoring network (FNET) implementation
-
Nov
-
Z. Zhian, X. Chunchun, B. Billian, Z. Li, S. Tsai, R. Conners, V. Centeno, A. Phadke, and L. Yilu, "Power system frequency monitoring network (FNET) implementation," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 1914-1921, Nov. 2005.
-
(2005)
IEEE Trans. Power Syst
, vol.20
, Issue.4
, pp. 1914-1921
-
-
Zhian, Z.1
Chunchun, X.2
Billian, B.3
Li, Z.4
Tsai, S.5
Conners, R.6
Centeno, V.7
Phadke, A.8
Yilu, L.9
|