-
1
-
-
0023977010
-
The shifting bottleneck procedure for job shop scheduling
-
Adams J., Balas E., and Zawack D. The shifting bottleneck procedure for job shop scheduling. Management Science 34 3 (1988) 391-401
-
(1988)
Management Science
, vol.34
, Issue.3
, pp. 391-401
-
-
Adams, J.1
Balas, E.2
Zawack, D.3
-
2
-
-
0026126118
-
A computational study of the job shop scheduling problem
-
Applegate D., and Cook W. A computational study of the job shop scheduling problem. ORSA Journal on Computing 3 2 (1991) 149-156
-
(1991)
ORSA Journal on Computing
, vol.3
, Issue.2
, pp. 149-156
-
-
Applegate, D.1
Cook, W.2
-
3
-
-
0035721450
-
No-wait and blocking job-shops: Challenging problems for GA's
-
Brizuela C.A., Zhao Y., and Sannomiya N. No-wait and blocking job-shops: Challenging problems for GA's. IEEE 0-7803-77-2/ 01 (2001) 2349-2354
-
(2001)
IEEE 0-7803-77-2/
, vol.1
, pp. 2349-2354
-
-
Brizuela, C.A.1
Zhao, Y.2
Sannomiya, N.3
-
4
-
-
38749095474
-
Cyclic job shop scheduling problems with blocking
-
Brucker P., and Kampmeyer T. Cyclic job shop scheduling problems with blocking. Annals of Operations Research 159 (2008) 161-181
-
(2008)
Annals of Operations Research
, vol.159
, pp. 161-181
-
-
Brucker, P.1
Kampmeyer, T.2
-
5
-
-
67349150214
-
-
Working Paper [April-99, Department of Industrial Engineering, Bilkent University, Ankara, Turkey
-
O. Candar, Machine scheduling problems with blocking and no-wait in process, Working Paper [April-99], Department of Industrial Engineering, Bilkent University, Ankara, Turkey, 1999
-
(1999)
Machine scheduling problems with blocking and no-wait in process
-
-
Candar, O.1
-
6
-
-
33847301458
-
A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
-
Chen L., Bostel N., Dejax P., Cai J., and Xi L. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal. European Journal of Operational Research 181 (2007) 40-58
-
(2007)
European Journal of Operational Research
, vol.181
, pp. 40-58
-
-
Chen, L.1
Bostel, N.2
Dejax, P.3
Cai, J.4
Xi, L.5
-
10
-
-
70350085526
-
-
Internal working paper [04-06, Department of Informatics, University of Fribourg, Switzerland
-
H. Gröflin, A. Klinkert, Local search in job shop scheduling with synchronization and blocking constraints, Internal working paper [04-06], Department of Informatics, University of Fribourg, Switzerland, 2004
-
(2004)
Local search in job shop scheduling with synchronization and blocking constraints
-
-
Gröflin, H.1
Klinkert, A.2
-
11
-
-
33750453739
-
Feasible insertions in job shop scheduling short cycles and stable sets
-
Gröflin H., and Klinkert A. Feasible insertions in job shop scheduling short cycles and stable sets. European Journal of Operational Research 177 (2007) 763-785
-
(2007)
European Journal of Operational Research
, vol.177
, pp. 763-785
-
-
Gröflin, H.1
Klinkert, A.2
-
12
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall N.G., and Sriskandarajah C. A survey of machine scheduling problems with blocking and no-wait in process. Operations Research 44 3 (1996) 510-525
-
(1996)
Operations Research
, vol.44
, Issue.3
, pp. 510-525
-
-
Hall, N.G.1
Sriskandarajah, C.2
-
14
-
-
0033102020
-
Deterministic job-shop scheduling: Past present and future
-
Jain A.S., and Meeran S. Deterministic job-shop scheduling: Past present and future. European Journal of Operational Research 113 (1999) 390-434
-
(1999)
European Journal of Operational Research
, vol.113
, pp. 390-434
-
-
Jain, A.S.1
Meeran, S.2
-
16
-
-
0003994089
-
-
Supplement to Resource Constrained Project Scheduling:, Carnegie Mellon University, Pittsburgh, PA
-
S. Lawrence, Supplement to Resource Constrained Project Scheduling: An Experimental Investigation of Heuristic Scheduling Techniques, GSIA, Carnegie Mellon University, Pittsburgh, PA, 1984
-
(1984)
An Experimental Investigation of Heuristic Scheduling Techniques, GSIA
-
-
Lawrence, S.1
-
17
-
-
0003531165
-
Machine scheduling via alternative graphs
-
RT-DIA-46-2000, Italy
-
A. Mascis, D. Pacciarelli, Machine scheduling via alternative graphs, Research Report, RT-DIA-46-2000, Italy, 2000
-
(2000)
Research Report
-
-
Mascis, A.1
Pacciarelli, D.2
-
19
-
-
0035705696
-
Geometric approach and taboo search for scheduling flexible manufacturing systems
-
Mati Y., Rezg N., and Xie X. Geometric approach and taboo search for scheduling flexible manufacturing systems. IEEE Transactions on Robotics and Automation 17 6 (2001) 805-818
-
(2001)
IEEE Transactions on Robotics and Automation
, vol.17
, Issue.6
, pp. 805-818
-
-
Mati, Y.1
Rezg, N.2
Xie, X.3
-
20
-
-
66349137409
-
Scheduling problem of job-shop with blocking: A taboo search approach, Extended Abstracts
-
Portugal
-
Y. Mati, N. Rezg, X. Xie, Scheduling problem of job-shop with blocking: A taboo search approach, Extended Abstracts, MIC 2001-4th Metaheuristics International Conference, Portugal, 2001, pp. 643-648
-
(2001)
MIC 2001-4th Metaheuristics International Conference
, pp. 643-648
-
-
Mati, Y.1
Rezg, N.2
Xie, X.3
-
22
-
-
0004168233
-
-
Muth J.F., and Thompson G.L. (Eds), Kluwer, Dordrecht
-
In: Muth J.F., and Thompson G.L. (Eds). Industrial Scheduling (1963), Kluwer, Dordrecht
-
(1963)
Industrial Scheduling
-
-
-
23
-
-
5244278595
-
A fast taboo search algorithm for the job shop problem
-
Nowicki E., and Smutnicki C. A fast taboo search algorithm for the job shop problem. Management Science 42 6 (1996) 797-812
-
(1996)
Management Science
, vol.42
, Issue.6
, pp. 797-812
-
-
Nowicki, E.1
Smutnicki, C.2
-
24
-
-
0037109620
-
Alternative graph formulation for solving complex factory-scheduling problems
-
Pacciarelli D. Alternative graph formulation for solving complex factory-scheduling problems. International Journal of Production Research 40 15 (2002) 3641-3653
-
(2002)
International Journal of Production Research
, vol.40
, Issue.15
, pp. 3641-3653
-
-
Pacciarelli, D.1
-
25
-
-
9644281095
-
Production scheduling in a steelmaking-continuous casting plant
-
Pacciarelli D., and Pranzo M. Production scheduling in a steelmaking-continuous casting plant. Computers and Chemical Engineering 28 (2004) 2823-2835
-
(2004)
Computers and Chemical Engineering
, vol.28
, pp. 2823-2835
-
-
Pacciarelli, D.1
Pranzo, M.2
-
27
-
-
1642291892
-
Scheduling intermediate storage multipurpose batch plants using the s-graph
-
Romero J., Puigjaner L., Holczinger T., and Friedler F. Scheduling intermediate storage multipurpose batch plants using the s-graph. AIChE Journal 50 (2004) 403-417
-
(2004)
AIChE Journal
, vol.50
, pp. 403-417
-
-
Romero, J.1
Puigjaner, L.2
Holczinger, T.3
Friedler, F.4
-
28
-
-
70350076678
-
-
B. Roy, B. Sussman, Les problèmes d'ordonnancement avec contraintes disjonctives, Note DS No. 9 bsi, SEMA, Paris, France, 1964
-
B. Roy, B. Sussman, Les problèmes d'ordonnancement avec contraintes disjonctives, Note DS No. 9 bsi, SEMA, Paris, France, 1964
-
-
-
-
29
-
-
0026930899
-
New search spaces for sequencing problems with application to job shop scheduling
-
Storer R.H., Wu S.D., and Vaccari R. New search spaces for sequencing problems with application to job shop scheduling. Management Science 38 10 (1992) 1495-1509
-
(1992)
Management Science
, vol.38
, Issue.10
, pp. 1495-1509
-
-
Storer, R.H.1
Wu, S.D.2
Vaccari, R.3
-
30
-
-
0000086539
-
A genetic algorithm applicable to large-scale job-shop problems
-
92
-
T. Yamada, R. Nakano, A genetic algorithm applicable to large-scale job-shop problems, in: Proceedings of the 2nd Parallel Problem Solving from Nature, PPSN '92, 1992, pp. 281-290
-
(1992)
Proceedings of the 2nd Parallel Problem Solving from Nature, PPSN
, pp. 281-290
-
-
Yamada, T.1
Nakano, R.2
|