An optimization model for stochastic project networks with cash flows
-
Benati S. An optimization model for stochastic project networks with cash flows. Computational Management Science 3 4 (2006) 271-284
-
(2006)
Computational Management Science
, vol.3
, Issue.4
, pp. 271-284
-
-
Benati, S.1
-
2
-
-
0032736579
-
Resource-constrained project scheduling: Notation classification models and methods
-
Brucker P., Drexl A., Möhring R., Neumann K., and Pesch E. Resource-constrained project scheduling: Notation classification models and methods. European Journal of Operational Research 112 1 (1999) 3-41
-
(1999)
European Journal of Operational Research
, vol.112
, Issue.1
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
3
-
-
0029532028
-
Sequential experimentation for estimating the optimal delay of activities in PERT networks
-
C. Alexopoulos, K. Kang, W.R. Lilegdon, D. Goldsman Eds
-
A.H. Buss, Sequential experimentation for estimating the optimal delay of activities in PERT networks, in: C. Alexopoulos, K. Kang, W.R. Lilegdon, D. Goldsman (Eds.), Proceedings of the 1995 Winter Simulation Conference, 1995, pp. 336-340.
-
(1995)
Proceedings of the 1995 Winter Simulation Conference
, pp. 336-340
-
-
Buss, A.H.1
-
4
-
-
0030683050
-
Activity delay in stochastic project networks
-
Buss A.H., and Rosenblatt M.J. Activity delay in stochastic project networks. Operations Research 45 1 (1997) 126-139
-
(1997)
Operations Research
, vol.45
, Issue.1
, pp. 126-139
-
-
Buss, A.H.1
Rosenblatt, M.J.2
-
5
-
-
38549139665
-
A robust optimization perspective on stochastic programming
-
Chen X., Sim M., and Sun P. A robust optimization perspective on stochastic programming. Operations Research 55 6 (2007) 1058-1071
-
(2007)
Operations Research
, vol.55
, Issue.6
, pp. 1058-1071
-
-
Chen, X.1
Sim, M.2
Sun, P.3
-
6
-
-
34250637152
-
The stochastic time-cost tradeoff problem: A robust optimization approach
-
Cohen I., Golany B., and Shtub A. The stochastic time-cost tradeoff problem: A robust optimization approach. Networks 49 2 (2007) 175-188
-
(2007)
Networks
, vol.49
, Issue.2
, pp. 175-188
-
-
Cohen, I.1
Golany, B.2
Shtub, A.3
-
8
-
-
13444274538
-
On the fallacy of averages in project risk management
-
Elmaghraby S.E. On the fallacy of averages in project risk management. European Journal of Operational Research 165 2 (2005) 307-313
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 307-313
-
-
Elmaghraby, S.E.1
-
9
-
-
0025701916
-
The scheduling of activities to maximize the net present value of projects
-
Elmaghraby S.E., and Herroelen W.S. The scheduling of activities to maximize the net present value of projects. European Journal of Operational Research 49 1 (1990) 35-49
-
(1990)
European Journal of Operational Research
, vol.49
, Issue.1
, pp. 35-49
-
-
Elmaghraby, S.E.1
Herroelen, W.S.2
-
11
-
-
0001215033
-
The analysis of activity networks under generalized precedence relations (GPRs)
-
Elmaghraby S.E., and Kamburowski J. The analysis of activity networks under generalized precedence relations (GPRs). Management Science 38 9 (1992) 1245-1263
-
(1992)
Management Science
, vol.38
, Issue.9
, pp. 1245-1263
-
-
Elmaghraby, S.E.1
Kamburowski, J.2
-
13
-
-
33745684030
-
A class of stochastic programs with decision dependent uncertainty
-
Goel V., and Grossmann I.E. A class of stochastic programs with decision dependent uncertainty. Mathematical Programming 108 2-3 (2006) 355-394
-
(2006)
Mathematical Programming
, vol.108
, Issue.2-3
, pp. 355-394
-
-
Goel, V.1
Grossmann, I.E.2
-
14
-
-
0001898118
-
Initial experiments with the cross-impact matrix method of forecasting
-
Gordon T.J., and Hayward H. Initial experiments with the cross-impact matrix method of forecasting. Futures 1 2 (1968) 100-116
-
(1968)
Futures
, vol.1
, Issue.2
, pp. 100-116
-
-
Gordon, T.J.1
Hayward, H.2
-
16
-
-
84987049329
-
Computational complexity of PERT problems
-
Hagstrom J.N. Computational complexity of PERT problems. Networks 18 2 (1988) 139-147
-
(1988)
Networks
, vol.18
, Issue.2
, pp. 139-147
-
-
Hagstrom, J.N.1
-
20
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
Herroelen W.S., and Leus R. Project scheduling under uncertainty: Survey and research potentials. European Journal of Operational Research 165 2 (2005) 289-306
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.S.1
Leus, R.2
-
22
-
-
0034563652
-
Improving project cost estimation by taking into account managerial flexibility
-
Jørgensen T., and Wallace S.W. Improving project cost estimation by taking into account managerial flexibility. European Journal of Operational Research 127 2 (2000) 239-251
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 239-251
-
-
Jørgensen, T.1
Wallace, S.W.2
-
25
-
-
0022785024
-
Markov and Markov-regenerative PERT networks
-
Kulkarni V.G., and Adlakha V.G. Markov and Markov-regenerative PERT networks. Operations Research 34 5 (1986) 769-781
-
(1986)
Operations Research
, vol.34
, Issue.5
, pp. 769-781
-
-
Kulkarni, V.G.1
Adlakha, V.G.2
-
26
-
-
0001501655
-
Application of a technique for research and development program evaluation
-
Malcolm D.G., Roseboom J.H., Clark C.E., and Fazar W. Application of a technique for research and development program evaluation. Operations Research 7 5 (1959) 646-669
-
(1959)
Operations Research
, vol.7
, Issue.5
, pp. 646-669
-
-
Malcolm, D.G.1
Roseboom, J.H.2
Clark, C.E.3
Fazar, W.4
-
27
-
-
18044403717
-
Linear preselective policies for stochastic project scheduling
-
Möhring R., and Stork F. Linear preselective policies for stochastic project scheduling. Mathematical Methods of Operations Research 52 3 (2000) 501-515
-
(2000)
Mathematical Methods of Operations Research
, vol.52
, Issue.3
, pp. 501-515
-
-
Möhring, R.1
Stork, F.2
-
30
-
-
0034559447
-
Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
-
Neumann K., and Zimmermann J. Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints. European Journal of Operational Research 127 2 (2000) 425-443
-
(2000)
European Journal of Operational Research
, vol.127
, Issue.2
, pp. 425-443
-
-
Neumann, K.1
Zimmermann, J.2
-
31
-
-
0032131846
-
On scheduling project activities with variable expenditure rates
-
Özdamar L. On scheduling project activities with variable expenditure rates. IIE Transactions 30 8 (1998) 695-704
-
(1998)
IIE Transactions
, vol.30
, Issue.8
, pp. 695-704
-
-
Özdamar, L.1
-
32
-
-
0031342989
-
A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows
-
Özdamar L., and Dündar H. A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows. Computers and Operations Research 24 12 (1997) 1187-1200
-
(1997)
Computers and Operations Research
, vol.24
, Issue.12
, pp. 1187-1200
-
-
Özdamar, L.1
Dündar, H.2
-
33
-
-
0002062038
-
Optimization of conditional value-at-risk
-
Rockafellar R.T., and Uryasev S. Optimization of conditional value-at-risk. Journal of Risk 2 3 (2000) 21-41
-
(2000)
Journal of Risk
, vol.2
, Issue.3
, pp. 21-41
-
-
Rockafellar, R.T.1
Uryasev, S.2
-
34
-
-
0000637036
-
Cash flows in networks
-
Russell A.H. Cash flows in networks. Management Science 16 5 (1970) 357-373
-
(1970)
Management Science
, vol.16
, Issue.5
, pp. 357-373
-
-
Russell, A.H.1
-
35
-
-
0002432533
-
Scenario planning: A tool for strategic thinking
-
Schoemaker P.J.H. Scenario planning: A tool for strategic thinking. Sloan Management Review 36 2 (1995) 25-40
-
(1995)
Sloan Management Review
, vol.36
, Issue.2
, pp. 25-40
-
-
Schoemaker, P.J.H.1
-
37
-
-
0034894460
-
A steepest ascent approach to maximizing the net present value of projects
-
Schwindt C., and Zimmermann J. A steepest ascent approach to maximizing the net present value of projects. Mathematical Methods of Operations Research 53 3 (2001) 435-450
-
(2001)
Mathematical Methods of Operations Research
, vol.53
, Issue.3
, pp. 435-450
-
-
Schwindt, C.1
Zimmermann, J.2
-
40
-
-
70349899784
-
-
Case Western Reserve University
-
V. Tilson, M.J. Sobel, J.G. Szmerekovsky, Scheduling projects with stochastic activity duration to maximize EPV, Technical Memorandum No. 812, Case Western Reserve University, 2006.
-
(2006)
Scheduling projects with stochastic activity duration to maximize EPV, Technical Memorandum
, Issue.812
-
-
Tilson, V.1
Sobel, M.J.2
Szmerekovsky, J.G.3
-
41
-
-
84944602812
-
Optimum activity delay in stochastic activity networks
-
W. Kubiak, C.-Y. Lee, J. Weglarz, R. Willis Eds
-
J. Wang, Z. Wu, Y. Sun, Optimum activity delay in stochastic activity networks, in: W. Kubiak, C.-Y. Lee, J. Weglarz, R. Willis (Eds.), Proceedings of the 7th International Workshop on Project Management and Scheduling, 2000.
-
(2000)
Proceedings of the 7th International Workshop on Project Management and Scheduling
-
-
Wang, J.1
Wu, Z.2
Sun, Y.3
|