메뉴 건너뛰기




Volumn 2, Issue , 2008, Pages 715-725

An IOC's experience in implementing digital oilfield technologies

Author keywords

[No Author keywords available]

Indexed keywords

CRITICAL SUCCESS FACTOR; DIGITAL OILFIELD; DIGITAL TECHNOLOGIES; ENVIRONMENTAL PERFORMANCE; EXXON MOBIL; FUNCTIONAL ORGANIZATION; NEW SOLUTIONS; STANDARD ASSETS; WORK PROCESS;

EID: 70349760995     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (16)

References (9)
  • 3
    • 33750983929 scopus 로고    scopus 로고
    • Real-Time Reservoir Surveillance Utilizing Permanent Downhole Pressure - An Operator's Experience
    • SPE 103213, San Antonio, TX, USA, 24-27 September
    • D. M. Chorneyko, "Real-Time Reservoir Surveillance Utilizing Permanent Downhole Pressure - An Operator's Experience", SPE 103213, Presented at the SPE Annual Technical Conference and Exhibition, San Antonio, TX, USA, 24-27 September, 2006.
    • (2006) Presented at the SPE Annual Technical Conference and Exhibition
    • Chorneyko, D.M.1
  • 4
    • 22344439152 scopus 로고    scopus 로고
    • Maximizing Drill Rates with Real-Time Surveillance of Mechanical Specific Energy
    • SPE 92194, The Netherlands, 23-25 February
    • F. E. Dupriest, W. L. Koederitz, "Maximizing Drill Rates with Real-Time Surveillance of Mechanical Specific Energy", SPE 92194, Presented at the SPE/IADC Drilling Conference in Amsterdam, The Netherlands, 23-25 February, 2005.
    • (2005) Presented at the SPE/IADC Drilling Conference in Amsterdam
    • Dupriest, F.E.1    Koederitz, W.L.2
  • 6
    • 33751020263 scopus 로고    scopus 로고
    • Comprehensive Drill-Rate Management Process to Maximize Rate of Penetration
    • SPE 102210, San Antonio, Texas, USA, 24-27 September
    • F. E. Dupriest, "Comprehensive Drill-Rate Management Process to Maximize Rate of Penetration", SPE 102210, SPE Annual Technical Conference and Exhibition, San Antonio, Texas, USA, 24-27 September, 2006.
    • (2006) SPE Annual Technical Conference and Exhibition
    • Dupriest, F.E.1
  • 7
    • 34147097426 scopus 로고    scopus 로고
    • Implementation of ROP Management Process in Qatar North Field
    • SPE 105521, Amsterdam, The Netherlands, 20-22 February
    • M. Remmert, J. W. Witt, and F. E. Dupriest, "Implementation of ROP Management Process in Qatar North Field", SPE 105521, Presented at the SPE/IADC Drilling Conference, Amsterdam, The Netherlands, 20-22 February, 2007.
    • (2007) Presented at the SPE/IADC Drilling Conference
    • Remmert, M.1    Witt, J.W.2    Dupriest, F.E.3
  • 8
    • 33750991088 scopus 로고    scopus 로고
    • Application of Intelligent-Completion Technology in a Triple-Zone Gravel Packed Commingled Producer
    • SPE 101021, San Antonio, TX, USA, 24-27 September
    • W. R. Brock, E. O. Oleh, J. P. Linscott, and S. Agara, "Application of Intelligent-Completion Technology in a Triple-Zone Gravel Packed Commingled Producer", SPE 101021, Presented at the SPE Annual Technical Conference and Exhibition, San Antonio, TX, USA, 24-27 September, 2006.
    • (2006) Presented at the SPE Annual Technical Conference and Exhibition
    • Brock, W.R.1    Oleh, E.O.2    Linscott, J.P.3    Agara, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.