250MW IGCC demonstration start up- MHI gas clean-up system

Author keywords

Coal gasification; COS hydrolysis catalyst; Demonstration plant; Desulfurization; Gas clean up; IGCC

Indexed keywords

CLEAN COAL; COLD GAS; CONVENTIONAL SYSTEMS; COS HYDROLYSIS CATALYST; DEMONSTRATION PLANT; DEMONSTRATION PLANTS; DEMONSTRATION TESTS; GAS-CLEAN-UP SYSTEMS; GASIFIERS; IGCC; INTEGRATED COAL GASIFICATION COMBINED CYCLES; MAIN COMPONENT; MITSUBISHI HEAVY INDUSTRIES; PERFORMANCE TARGETS; PLANT EFFICIENCY; START-UPS;

EID: 70349607851     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (2)

References (7)
  • 1
    • 74549188745 scopus 로고    scopus 로고
    • Central Research Institute of Electric Power Industry, No.284030, See, accessed
    • Central Research Institute of Electric Power Industry, Research Report No.284030, See http ://criepi.denken.or.jp/index.html (accessed 2008)
    • (2008) Research Report
  • 2
    • 70349606860 scopus 로고    scopus 로고
    • Mitsubishi Heavy industries, Ltd., PRB Coal Gasification Test Results with Air Blown IGCC, presented at Gasification Technology Conference, Washington D.C. - October, 2006.
    • Mitsubishi Heavy industries, Ltd., PRB Coal Gasification Test Results with Air Blown IGCC, presented at Gasification Technology Conference, Washington D.C. - October, 2006.
  • 3
    • 70349601147 scopus 로고    scopus 로고
    • Mitsubishi Heavy industries, Ltd., Current Status on Development of Air Blown Two-Stage Entrained Flow Coal Gasifier, Technical Review 33, No.3 October, 1996.
    • Mitsubishi Heavy industries, Ltd., Current Status on Development of Air Blown Two-Stage Entrained Flow Coal Gasifier, Technical Review Vol.33, No.3 October, 1996.
  • 4
    • 9944253530 scopus 로고    scopus 로고
    • Project Status of 250MW Air-blown IGCC Demonstration Plant
    • San Francisco, October 7-10
    • Shozo Kaneko, et al., Project Status of 250MW Air-blown IGCC Demonstration Plant, presented at Gasification Technology Conference, San Francisco - October 7-10, 2001.
    • (2001) presented at Gasification Technology Conference
    • Kaneko, S.1
  • 5
    • 70349597598 scopus 로고    scopus 로고
    • Shozo Kaneko, Status of 250MW Air-blown IGCC, presented at Gasification Technology Conference, Washington D.C. - October 5, 2006.
    • Shozo Kaneko, Status of 250MW Air-blown IGCC, presented at Gasification Technology Conference, Washington D.C. - October 5, 2006.
  • 6
    • 50149105260 scopus 로고    scopus 로고
    • Tampa Electric Company, Tampa Electric Polk Power Station Integrated Gasification Combined Cycle Project, August
    • Tampa Electric Company, Tampa Electric Polk Power Station Integrated Gasification Combined Cycle Project - Final Technical Report, August, 2002.
    • (2002) Final Technical Report
  • 7
    • 0005914572 scopus 로고    scopus 로고
    • Wabash River Energy Ltd, The Wabash River Coal Gasification Repowering Project-Final, August
    • Wabash River Energy Ltd., The Wabash River Coal Gasification Repowering Project-Final Technical Report, August 2000.