-
3
-
-
70349517860
-
Use of maintenance performance indicators: A case study at Banverket
-
Åhrén, T. and Kumar, U. (2004), Use of maintenance performance indicators: a case study at Banverket, Conference Proceedings of the 5th Asia-Pacific Industrial Engineering and Management Systems Conference (APIEMS2004), Gold Coast, Australia.
-
(2004)
Conference Proceedings of the 5th Asia-Pacific Industrial Engineering and Management Systems Conference (APIEMS2004), Gold Coast, Australia
-
-
Åhrén, T.1
Kumar, U.2
-
4
-
-
70349530646
-
Benchmarking of maintenance process: Two case studies from Banverket, Sweden
-
(accessed 29-30 June)
-
Åhrén, T., Espling, U. and Kumar, U. (2005), Benchmarking of maintenance process: two case studies from Banverket, Sweden, (accessed 29-30 June), Conference Proceedings of the 8th Railway Engineering Conference, London.
-
(2005)
Conference Proceedings of the 8th Railway Engineering Conference, London
-
-
Åhrén, T.1
Espling, U.2
Kumar, U.3
-
5
-
-
70349550742
-
Continuous improvement with the use of benchmarking
-
Almdal, W. (1994), Continuous improvement with the use of benchmarking, CIM Bulletin, Vol. 81, No.983, pp. 21-6.
-
(1994)
CIM Bulletin
, vol.81
, Issue.983
, pp. 21-6
-
-
Almdal, W.1
-
6
-
-
23744462648
-
A critique of benchmarking and performance measurement lead or lag
-
Anderson, K. and McAdam, R. (2004), A critique of benchmarking and performance measurement lead or lag, Benchmarking: An International Journal, Vol. 11, No.5, pp. 465-83.
-
(2004)
Benchmarking: An International Journal
, vol.11
, Issue.5
, pp. 465-83
-
-
Anderson, K.1
McAdam, R.2
-
9
-
-
34249683616
-
Benchmarking in rapid time
-
Bogan, C. and Callahan, D. (2001), Benchmarking in rapid time, Industrial Management, Vol. 78, No.6, pp. 169-76.
-
(2001)
Industrial Management
, vol.78
, Issue.6
, pp. 169-76
-
-
Bogan, C.1
Callahan, D.2
-
10
-
-
35148898833
-
Collaborative benchmarking, transparency and performance evidence from the Netherlands water supply industry
-
Braadbaart, O. (2007), Collaborative benchmarking, transparency and performance evidence from the Netherlands water supply industry, Benchmarking: An International Journal, Vol. 12, No.6, pp. 677-92.
-
(2007)
Benchmarking: An International Journal
, vol.12
, Issue.6
, pp. 677-92
-
-
Braadbaart, O.1
-
11
-
-
34249733045
-
Development of performance measurement system in managing supplier relationship for maintenance logistics providers
-
Choy, K.L., Chow, H.K.H., Lee, W.B. and Chan, F.T.S. (2007), Development of performance measurement system in managing supplier relationship for maintenance logistics providers, Benchmarking: An International Journal, Vol. 14, No.3, pp. 352-68.
-
(2007)
Benchmarking: An International Journal
, vol.14
, Issue.3
, pp. 352-68
-
-
Choy, K.L.1
Chow, H.K.H.2
Lee, W.B.3
Chan, F.T.S.4
-
12
-
-
20444457564
-
Benchmarking in the non-profit sector in Australia
-
Conley Tyler, M. (2005), Benchmarking in the non-profit sector in Australia, Benchmarking: An International Journal, Vol. 12, No.3, pp. 219-35.
-
(2005)
Benchmarking: An International Journal
, vol.12
, Issue.3
, pp. 219-35
-
-
Conley Tyler, M.1
-
13
-
-
0141964834
-
Maintenance performance analysis: A practical approach
-
De Groote, P. (1995), Maintenance performance analysis: a practical approach, Journal of Quality in Maintenance Engineering, Vol. 1, No.2, pp. 4-24.
-
(1995)
Journal of Quality in Maintenance Engineering
, vol.1
, Issue.2
, pp. 4-24
-
-
de Groote, P.1
-
15
-
-
70349550741
-
-
EFNMS, available at:, European Federation of National Maintenance Societies
-
EFNMS (2002), available at: www.efnms.org/publications/13defined101.doc, Benchmarking - Definitions and Indicators, European Federation of National Maintenance Societies.
-
(2002)
Benchmarking - Definitions and Indicators
-
-
-
16
-
-
70349550693
-
-
(in Swedish), Järnvägstekniskt Centrum, Luleå tekniska universitet
-
Espling, U. (2004), (in Swedish), Benchmarking av Basentreprenad år 2002 för Drift och Underhåll av Järnväg (Benchmarking of Basic Organizations for Railway Operation and Maintenance), Luleå Research Report 2004:16, Järnvägstekniskt Centrum, Luleå tekniska universitet.
-
(2004)
Benchmarking Av Basentreprenad år 2002 för Drift Och Underhåll Av Järnväg (Benchmarking of Basic Organizations for Railway Operation and Maintenance), Luleå Research Report 2004:16
-
-
Espling, U.1
-
18
-
-
70349555006
-
Performance evaluation and benchmarking
-
John, L.K. and Eeckhout, L. (2006), Performance evaluation and benchmarking, Benchmarking: An International Journal, Vol. 13, No.5, pp. 629-31.
-
(2006)
Benchmarking: An International Journal
, vol.13
, Issue.5
, pp. 629-31
-
-
John, L.K.1
Eeckhout, L.2
-
19
-
-
33747090863
-
Understanding factors for benchmarking adoption: New evidence from Malaysia
-
Lee, Y.P., Zailani, S. and Soh, K.L. (2006), Understanding factors for benchmarking adoption: new evidence from Malaysia, Benchmarking: An International Journal, Vol. 13, No.5, pp. 548-65.
-
(2006)
Benchmarking: An International Journal
, vol.13
, Issue.5
, pp. 548-65
-
-
Lee, Y.P.1
Zailani, S.2
Soh, K.L.3
-
20
-
-
70349555007
-
Process of maintenance performance management and its imperatives within the offshore petroleum industry (part III): Integration of maintenance performance to corporate value process
-
Liyanage, J.P. and Kumar, U. (2002), Process of maintenance performance management and its imperatives within the offshore petroleum industry (part III): integration of maintenance performance to corporate value process, SMRP Solutions, Vol. 2002, p. 3.
-
(2002)
SMRP Solutions
, vol.2002
, pp. 3
-
-
Liyanage, J.P.1
Kumar, U.2
-
21
-
-
0242551785
-
Towards a value-based view on operations and maintenance performance management
-
Liyanage, J.P. and Kumar, U. (2003), Towards a value-based view on operations and maintenance performance management, Journal of Quality in Maintenance Engineering, Vol. 9, pp. 333-50.
-
(2003)
Journal of Quality in Maintenance Engineering
, vol.9
, pp. 333-50
-
-
Liyanage, J.P.1
Kumar, U.2
-
23
-
-
3843144923
-
Performance measurement system design, A literature review and research agenda
-
Neely, A., Gregory, M. and Platts, K. (1995), Performance measurement system design, A literature review and research agenda, International Journal of Operations & Production Management, Vol. 15, No.4, pp. 80-116.
-
(1995)
International Journal of Operations & Production Management
, vol.15
, Issue.4
, pp. 80-116
-
-
Neely, A.1
Gregory, M.2
Platts, K.3
-
25
-
-
34848854692
-
Integrating maintenance performance with corporate balanced scorecard
-
27-29 August
-
Parida, A., Åhren, T. and Kumar, U. (2003), Integrating maintenance performance with corporate balanced scorecard, 27-29 August, COMADEM 2003, Proceedings of the 16th International Congress, Växjö, Sweden, pp. 53-9.
-
(2003)
COMADEM 2003, Proceedings of the 16th International Congress, Växjö, Sweden
, pp. 53-9
-
-
Parida, A.1
Åhren, T.2
Kumar, U.3
-
26
-
-
22144457202
-
Defining asset management
-
Peterson, S.B. (1999), Defining asset management, Maintenance Technology, Vol. 12, pp. 13-17.
-
(1999)
Maintenance Technology
, vol.12
, pp. 13-17
-
-
Peterson, S.B.1
-
27
-
-
0242360172
-
Benchmarking for agility
-
Sarkis, J. (2001), Benchmarking for agility, Benchmarking: An International Journal, Vol. 8, No.2, pp. 88-107.
-
(2001)
Benchmarking: An International Journal
, vol.8
, Issue.2
, pp. 88-107
-
-
Sarkis, J.1
-
28
-
-
70349549628
-
The cost of railway infrastructure
-
available at
-
Stalder, O., Bente, H. and Lüking, J. (2002), The cost of railway infrastructure, available at: http://promain.server.de, ProM@in - Progress in Maintenance and Management of Railway Infrastructure, pp. 32-7.
-
(2002)
ProM@in - Progress in Maintenance and Management of Railway Infrastructure
, pp. 32-7
-
-
Stalder, O.1
Bente, H.2
Lüking, J.3
-
32
-
-
0344959696
-
Safety performance measurement: Identifying prospective indicators with high validity
-
Stricoff, R. (2000), Safety performance measurement: identifying prospective indicators with high validity, Professional Safety, Vol. 45, pp. 36-9.
-
(2000)
Professional Safety
, vol.45
, pp. 36-9
-
-
Stricoff, R.1
|