|
Volumn 323, Issue , 2008, Pages
|
Lunar architecture team - Phase 2 habitat volume estimation: "Caution when using analogs"
|
Author keywords
[No Author keywords available]
|
Indexed keywords
EARTH (PLANET);
ECOSYSTEMS;
LUNAR MISSIONS;
LUNAR SURFACE ANALYSIS;
MANNED SPACE FLIGHT;
DESIGN GUIDANCE;
DETAILED DESIGN;
LUNAR SURFACE;
METHODICAL APPROACH;
POINT DESIGN;
TIME CONSTRAINTS;
VOLUME ESTIMATES;
VOLUME ESTIMATIONS;
HEURISTIC METHODS;
|
EID: 70349387019
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1061/40988(323)101 Document Type: Conference Paper |
Times cited : (15)
|
References (9)
|