|
Volumn 321, Issue , 2008, Pages
|
Lessons learned from failure of a large diameter water pipeline
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ASSET MANAGEMENT;
FAILURE (MECHANICAL);
PIPELINES;
POLLUTION;
PROJECT MANAGEMENT;
SAFETY ENGINEERING;
CONSTRUCTION CONTRACT ADMINISTRATION;
CONSTRUCTION COSTS;
CONSTRUCTION PHASE;
EMBEDMENT MATERIALS;
HYDRO STATIC TESTING;
LARGE DIAMETER;
REMEDIATION DESIGN;
VERTICAL DEFLECTIONS;
FORENSIC ENGINEERING;
|
EID: 70349376383
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1061/40994(321)126 Document Type: Conference Paper |
Times cited : (2)
|
References (0)
|