Volumn 42, Issue 2, 2008, Pages 19-27

Optimizing the layout of offshore wind energy systems

Author keywords

[No Author keywords available]

Indexed keywords

COMPLEX PROBLEMS; ELECTRICAL COSTS; ENERGY PRODUCTIONS; ENERGY SUPPLIES; INSTALLATION COSTS; LAYOUT OPTIMIZATION; MASSACHUSETTS; MICROSITING; OFF-SHORE WIND ENERGY; OFFSHORE WIND FARMS; OPERATIONS AND MAINTENANCE; OPTIMAL LAYOUT; OPTIMIZATION TOOLS; WIND FARM;

EID: 70349327969     PISSN: 00253324     EISSN: None     Source Type: Journal    
DOI: 10.4031/002533208786829188     Document Type: Article
Times cited : (25)

References (31)
  • 1
    • 70349365913 scopus 로고    scopus 로고
    • High-resolution geologic mapping of the inner continental shelf: Boston harbor and approaches
    • Reston, VA, Massachusetts, Available: pubs.usgs.gov/of/2006/1008/
    • Ackerman, S.D., Butman, B., Barnhardt, W.A., Danforth, W.W. and Crocker, J.M. 2006. High-Resolution Geologic Mapping of the Inner Continental Shelf: Boston Harbor and Approaches, Massachusetts. Open-File Report 2006-11008, U.S. Geological Survey, Reston, VA, 2006. Available: pubs.usgs.gov/of/2006/1008/.
    • (2006) Open-File Report 2006-11008, U.S. Geological Survey
    • Ackerman, S.D.1    Butman, B.2    Barnhardt, W.A.3    Danforth, W.W.4    Crocker, J.M.5
  • 3
    • 67649942202 scopus 로고    scopus 로고
    • AWS TrueWind, Accessed 2007
    • AWS Truewind. 2007. New England Wind Map", AWS TrueWind, Accessed 2007: http://truewind.teamcamelot.com/ne/.
    • (2007) New England Wind Map
  • 4
    • 0038143223 scopus 로고    scopus 로고
    • Loss determination for long three-phase high voltage submarine cables
    • Brakelmann, H. 2003. Loss Determination for Long Three-Phase High Voltage Submarine Cables. Eur T Electr Power. 13(3):193-197.
    • (2003) Eur T Electr Power. , vol.13 , Issue.3 , pp. 193-197
    • Brakelmann, H.1
  • 9
    • 70349601641 scopus 로고    scopus 로고
    • 40,000 MW by 2020: Building offshore wind in europe
    • January/February
    • deVries, E. 2008. 40,000 MW by 2020: Building Offshore Wind in Europe. Renewable Energy World, 11(1), January/February.
    • (2008) Renewable Energy World , Issue.11 , pp. 1
    • DeVries, E.1
  • 10
    • 84869612412 scopus 로고    scopus 로고
    • Accessed 2007
    • Dörner, H.H. 2007. Windenergy History. Accessed 2007, http://www.ifb.unistuttgart.de/~doerner/ewindenergie1.html.
    • (2007) Windenergy History
    • Dörner, H.H.1
  • 13
    • 4544297625 scopus 로고    scopus 로고
    • Placement of wind turbines using genetic algorithms
    • Grady, S.A., Hussaini, M.Y. and Abdullah, M.M. 2005. Placement of Wind Turbines Using Genetic Algorithms. Renew Energ, 30(2):259-270.
    • (2005) Renew Energ , vol.30 , Issue.2 , pp. 259-270
    • Grady, S.A.1    Hussaini, M.Y.2    Abdullah, M.M.3
  • 16
    • 77952975039 scopus 로고    scopus 로고
    • Wind turbines, part 3: Design requirements for offshore wind turbines
    • International Electrotechincal Commission (IEC), IEC
    • IEC. 2008. Wind Turbines, Part 3: Design Requirements for Offshore Wind Turbines. 61400-3, IEC TC88 WG3 Final Draft International Standard, International Electrotechincal Commission (IEC).
    • (2008) IEC TC88 WG3 Final Draft International Standard , pp. 61400-61403
  • 18
    • 34548348527 scopus 로고    scopus 로고
    • An analytical framework for offshore wind farm layout optimization
    • Lackner, M.A. and Elkinton, C.N. 2007. An Analytical Framework for Offshore Wind Farm Layout Optimization. Wind Engineering. 31(1):17-31.
    • (2007) Wind Engineering , vol.31 , Issue.1 , pp. 17-31
    • Lackner, M.A.1    Elkinton, C.N.2
  • 21
    • 33746542534 scopus 로고    scopus 로고
    • Review of design conditions applicable to offshore wind energy systems in the united states
    • Manwell, J.F., Elkinton, C.N., Rogers, A.L., and McGowan, J.G. 2007. Review of Design Conditions Applicable to Offshore Wind Energy Systems in the United States. Renew Sust Energ Rev. 11:210-234.
    • (2007) Renew Sust Energ Rev. , vol.11 , pp. 210-234
    • Manwell, J.F.1    Elkinton, C.N.2    Rogers, A.L.3    McGowan, J.G.4
  • 23
    • 34250743717 scopus 로고    scopus 로고
    • CREST, Loughborough University, Loughborough,UK
    • Moreno, S.V. 2001. Wind Farm Optimisation. CREST, Loughborough University, Loughborough,UK.
    • (2001) Wind Farm Optimisation
    • Moreno, S.V.1
  • 24
    • 0028174498 scopus 로고
    • Optimization of wind turbine positioning in large windfarms by means of a genetic algorithm
    • Mosetti, G., Poloni, C. and Diviacco, B. 1994. Optimization of Wind Turbine Positioning in Large Windfarms by Means of a Genetic Algorithm. J Wind Eng Ind Aerod. 51(1):105-116.
    • (1994) J Wind Eng Ind Aerod. , vol.51 , Issue.1 , pp. 105-116
    • Mosetti, G.1    Poloni, C.2    Diviacco, B.3
  • 25
    • 33646494896 scopus 로고    scopus 로고
    • Loss evaluation of HVAC and HVDC transmission solutions for large offshore wind farms
    • Negra, N.B., Todorovic, J. and Ackermann, T. 2006. Loss Evaluation of HVAC and HVDC Transmission Solutions for Large Offshore Wind Farms. Electr Pow Syst Res. 76:916-927.
    • (2006) Electr Pow Syst Res. , vol.76 , pp. 916-927
    • Negra, N.B.1    Todorovic, J.2    Ackermann, T.3
  • 26
    • 84869617741 scopus 로고    scopus 로고
    • OWE, Accessed March 2008
    • OWE. 2008. Offshore Wind Energy Europe Website, Accessed March 2008, http://www. offshorewindenergy.org.
    • (2008) Offshore Wind Energy Europe Website
  • 27
    • 1842832191 scopus 로고    scopus 로고
    • Heuristic methods for wind energy conversion system positioning
    • Ozturk, U.A. and Norman, B.A. 2004. Heuristic Methods for Wind Energy Conversion System Positioning. Electr Pow Syst Res. 70(3):179-185.
    • (2004) Electr Pow Syst Res. , vol.70 , Issue.3 , pp. 179-185
    • Ozturk, U.A.1    Norman, B.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.