메뉴 건너뛰기




Volumn , Issue , 2008, Pages 203-209

Tabu search applied to transmission expansion planning considering losses and interruption costs

Author keywords

Interruption costs; Metaheuristics; Reliability worth; Tabu search; Transmission planning

Indexed keywords

BASIC STRUCTURE; CPU TIME; DYNAMIC NATURE; FEASIBLE SOLUTION; HIGH-QUALITY SOLUTIONS; INTERRUPTION COSTS; LARGE-SCALE PROBLEM; LEAST-COST SOLUTIONS; LOCAL MINIMUMS; METAHEURISTICS; OPTIMIZATION PROCESS; PROBLEM-BASED; RELIABILITY WORTH; TEST SYSTEMS; TRANSMISSION EXPANSION PLANNING; TRANSMISSION LOSS; TRANSMISSION NETWORKS; TRANSMISSION PLANNING;

EID: 70349121790     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (22)

References (20)
  • 1
    • 0014848305 scopus 로고
    • Transmission network estimation using linear programming
    • Sept
    • L.L. Garver, "Transmission network estimation using linear programming," IEEE Trans. on PAS, vol.89, no.7, Sept. 1970.
    • (1970) IEEE Trans. on PAS , vol.89 , Issue.7
    • L.L. Garver1
  • 2
    • 0037843031 scopus 로고    scopus 로고
    • Classification of publications and models on transmission expansion planning
    • May
    • G. Latorre, R.D. Cruz, J.M. Areiza, A. Villegas, "Classification of publications and models on transmission expansion planning," IEEE Trans. on Power Systems, vol.18, no.2, pp. 938-946, May 2003.
    • (2003) IEEE Trans. on Power Systems , vol.18 , Issue.2 , pp. 938-946
    • G. Latorre1    R.D. Cruz2    J.M. Areiza3    A. Villegas4
  • 3
    • 4544334763 scopus 로고    scopus 로고
    • Value-based system facility planning
    • Sept./Oct
    • A.A. Chowdhury, and D.O. Koval, "Value-based system facility planning," IEEE Power & Energy Magazine, vol.2, no.5, pp. 58-67, Sept./Oct. 2004.
    • (2004) IEEE Power & Energy Magazine , vol.2 , Issue.5 , pp. 58-67
    • A.A. Chowdhury1    D.O. Koval2
  • 4
    • 33646584196 scopus 로고    scopus 로고
    • Transmission planning in a deregulated environment
    • May
    • Z. Xu, Z.Y. Dong, and K.P. Wong, "Transmission planning in a deregulated environment," IEE Proc.-Gener. Transm. Distr., vol.153, no.3, pp. 326-334, May 2006.
    • (2006) IEE Proc.-Gener. Transm. Distr. , vol.153 , Issue.3 , pp. 326-334
    • Z. Xu1    Z.Y. Dong2    K.P. Wong3
  • 5
    • 34548344017 scopus 로고    scopus 로고
    • Global broadcast-transmission planning in restructured systems-special issue on trans. planning
    • Sept/Oct, Guest Editorial
    • M. Shahidehpour (Guest Editorial), "Global Broadcast-Transmission Planning in Restructured Systems-Special Issue on Trans. Planning," IEEE Power and Energy Magazine, vol.5, no.5, Sept/Oct. 2007.
    • (2007) IEEE Power and Energy Magazine , vol.5 , Issue.5
    • M. Shahidehpour1
  • 6
    • 0031212221 scopus 로고    scopus 로고
    • Transmission network optimal planning using the tabu search method
    • Aug
    • W. Fushuan, C.S. Chang, "Transmission network optimal planning using the tabu search method," Electric Power Systems Research, vol.42, no.2, pp. 153-163, Aug. 1997.
    • (1997) Electric Power Systems Research , vol.42 , Issue.2 , pp. 153-163
    • W. Fushuan1    C.S. Chang2
  • 7
    • 0034186747 scopus 로고    scopus 로고
    • Tabu search algorithm for network synthesis
    • May
    • R.A. Gallego, R. Romero, A. Monticelli, "Tabu search algorithm for network synthesis," IEEE Trans. on Power Systems, vol.15, no.2, pp. 490-495, May 2000.
    • (2000) IEEE Trans. on Power Systems , vol.15 , Issue.2 , pp. 490-495
    • R.A. Gallego1    R. Romero2    A. Monticelli3
  • 9
    • 84861358651 scopus 로고    scopus 로고
    • A parallel tabu search based approach to transmission network expansion planning
    • paper 316, Portugal, Sept
    • H. Mori, Y. Sone, "A parallel tabu search based approach to transmission network expansion planning," IEEE Porto Power Tech, paper 316, Portugal, Sept. 2001.
    • (2001) IEEE Porto Power Tech
    • H. Mori1    Y. Sone2
  • 10
    • 0031076597 scopus 로고    scopus 로고
    • Parallel simulated annealing applied to long term transmission network expansion planning
    • Feb
    • R.A. Gallego, A.B. Alves, A. Monticelli, R. Romero, "Parallel simulated annealing applied to long term transmission network expansion planning," IEEE Trans. on Power Systems, vol.12, no.1, pp. 181-187, Feb. 1997.
    • (1997) IEEE Trans. on Power Systems , vol.12 , Issue.1 , pp. 181-187
    • R.A. Gallego1    A.B. Alves2    A. Monticelli3    R. Romero4
  • 11
    • 2542533038 scopus 로고    scopus 로고
    • Multistage and coordinated planning of the expansion of transmission systems
    • May
    • A.H. Escobar, R.A. Gallego, R. Romero, "Multistage and coordinated planning of the expansion of transmission systems," IEEE Trans. on Power Systems, vol.19, no.2, pp. 735-774, May 2004.
    • (2004) IEEE Trans. on Power Systems , vol.19 , Issue.2 , pp. 735-774
    • A.H. Escobar1    R.A. Gallego2    R. Romero3
  • 12
    • 0035339706 scopus 로고    scopus 로고
    • A greedy randomized adaptive search procedure for transmission expansion planning
    • May
    • S. Binato, G.C. Oliveira, J.L. Araujo, "A greedy randomized adaptive search procedure for transmission expansion planning," IEEE Trans. on Power Systems, vol.16, no.2, pp. 247-253, May 2001.
    • (2001) IEEE Trans. on Power Systems , vol.16 , Issue.2 , pp. 247-253
    • S. Binato1    G.C. Oliveira2    J.L. Araujo3
  • 15
    • 0344081225 scopus 로고    scopus 로고
    • Probabilistic criteria for power system expansion planning
    • April
    • L.A.F. Manso, A.M. Leite da Silva, "Probabilistic criteria for power system expansion planning," Electric Power Systems Research, vol.69, no.1, pp. 51-58, April 2004.
    • (2004) Electric Power Systems Research , vol.69 , Issue.1 , pp. 51-58
    • L.A.F. Manso1    Da Silva, A.M.L.2
  • 16
    • 34547670497 scopus 로고    scopus 로고
    • An approach to the explicit consideration of unreliability costs in transmission expansion planning
    • Jul.-Aug
    • J.R.P. Barros, A.C.G. Melo, A.M. Leite da Silva, "An approach to the explicit consideration of unreliability costs in transmission expansion planning," European Transactions on Electric Power, vol.17, no.4, pp. 401-412, Jul.-Aug. 2007.
    • (2007) European Transactions on Electric Power , vol.17 , Issue.4 , pp. 401-412
    • J.R.P. Barros1    A.C.G. Melo2    Da Silva, A.M.L.3
  • 17
    • 70349154987 scopus 로고    scopus 로고
    • Tutorial on modern heuristic optimization techniques with applications to power systems
    • K.Y. Lee, M.A. El-Sharkawi (Editors), Jan
    • K.Y. Lee, M.A. El-Sharkawi (Editors), "Tutorial on modern heuristic optimization techniques with applications to power systems," IEEE PES, IEEE Pub. No. 02TP160, Jan. 2002.
    • (2002) IEEE PES, IEEE Pub. No. 02TP160
  • 18
    • 0034138495 scopus 로고    scopus 로고
    • Pseudo-chronological simulation for composite reliability analysis with time varying loads
    • Feb
    • A.M. Leite da Silva, L.A.F. Manso, J.C.O. Mello, R. Billinton, "Pseudo-chronological simulation for composite reliability analysis with time varying loads," IEEE Trans. on Power Systems, vol.15, no.1, pp. 73-80, Feb. 2000.
    • (2000) IEEE Trans. on Power Systems , vol.15 , Issue.1 , pp. 73-80
    • Da Silva, A.M.L.1    L.A.F. Manso2    J.C.O. Mello3    R. Billinton4
  • 20
    • 0018544097 scopus 로고
    • IEEE reliability test system
    • IEEE APM Subcommittee, Nov/Dec
    • IEEE APM Subcommittee, "IEEE reliability test system," IEEE Trans. on PAS, vol.PAS-99, no.6, pp. 2047-2054, Nov/Dec. 1979.
    • (1979) IEEE Trans. on PAS , vol.PAS-99 , Issue.6 , pp. 2047-2054


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.