메뉴 건너뛰기




Volumn 9, Issue 4, 2009, Pages 134-139

Highway transportation route decision-making of hazardous material in developed transportation network

Author keywords

Development label algorithm; Hazardous material; Multiple objective decision making; Transportation route

Indexed keywords


EID: 70249130112     PISSN: 10096744     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (10)
  • 1
    • 0242264258 scopus 로고
    • A model for the selection of shipping routes and storage location for a hazardous substance
    • Johns Hopkins University, Baltimore
    • Shorys D. A Model for the selection of shipping routes and storage location for a hazardous substance[D]. Johns Hopkins University, Baltimore, 1981.
    • (1981)
    • Shorys, D.1
  • 2
    • 84985755119 scopus 로고
    • The minimum-covering shortest-path problem
    • Current J R, et al. The minimum-covering shortest-path problem[J]. Decision Science, 1988, 19: 490-503.
    • (1988) Decision Science , vol.19 , pp. 490-503
    • Current, J.R.1
  • 3
    • 0023959920 scopus 로고
    • Developing a risk-cost frame work for routing truck movement of hazardous materials
    • Abkowtiz M and Cheng P. Developing a risk-cost frame work for routing truck movement of hazardous materials[J]. Accident Annual Prevent, 1988, 20: 39-51.
    • (1988) Accident Annual Prevent , vol.20 , pp. 39-51
    • Abkowtiz, M.1    Cheng, P.2
  • 4
    • 0024769569 scopus 로고
    • Multi-object programming approach for routing hazardous material
    • Zografos K G, Davis C F. Multi-object programming approach for routing hazardous material. Journal of Transportation Engineering, 1989, 115(6): 661-673.
    • (1989) Journal of Transportation Engineering , vol.115 , Issue.6 , pp. 661-673
    • Zografos, K.G.1    Davis, C.F.2
  • 5
  • 6
    • 33845361862 scopus 로고    scopus 로고
    • Route planning for hazardous materials transportation in time-varying network
    • WEI H, LI J, PU Y. Route planning for hazardous materials transportation in time-varying network[J]. System Engineering Theory and Practice, 2006, (10): 107-112.
    • (2006) System Engineering Theory and Practice , Issue.10 , pp. 107-112
    • Wei, H.1    Li, J.2    Pu, Y.3
  • 7
    • 59949101978 scopus 로고    scopus 로고
    • On route-choice analysis of hazardous materials transportation
    • REN C X, WU Z Z. On route-choice analysis of hazardous materials transportation[J]. Journal of Safety and Environment, 2006, 6(2): 84-88.
    • (2006) Journal of Safety and Environment , vol.6 , Issue.2 , pp. 84-88
    • Ren, C.X.1    Wu, Z.Z.2
  • 8
    • 70249087089 scopus 로고    scopus 로고
    • Study on the hazardous materials highway transportation route decision making strategy
    • Jilin: Jilin University
    • JIA H M. Study on the hazardous materials highway transportation route decision making strategy[D]. Jilin: Jilin University, 2006.
    • (2006)
    • Jia, H.M.1
  • 10
    • 70249134346 scopus 로고    scopus 로고
    • Decision-making method of hazardous material transportation route based on particle swarm optimization algorithm and neural network
    • MA C X, WU F, LU R. Decision-making method of hazardous material transportation route based on particle swarm optimization algorithm and neural network[J]. IEEE PACIIA, 2008, (12): 1023-1033.
    • (2008) IEEE PACIIA , Issue.12 , pp. 1023-1033
    • Ma, C.X.1    Wu, F.2    Lu, R.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.