메뉴 건너뛰기




Volumn 22, Issue 7, 2009, Pages 1068-1079

An iterative agent bidding mechanism for responsive manufacturing

Author keywords

Multi agent system; Planning and production control; Responsive manufacturing; Simulated annealing; System modelling and simulation

Indexed keywords

AGENT BASED; BIDDING MECHANISM; DEMAND PATTERN; DYNAMIC CHANGES; DYNAMIC VARIATIONS; GLOBAL COMPETITION; MACHINING PROCESS; MANUFACTURING BUSINESS; OPTIMISATIONS; PROCESS PLAN; PRODUCT MIX; PRODUCTION ENVIRONMENTS; PRODUCTION PLANNING AND CONTROL; PRODUCTION SCHEDULING; RESOURCE AGENTS; RESPONSIVE MANUFACTURING; SYSTEM MODELLING AND SIMULATION; TEST CASE; TOTAL PRODUCTION COST; VIRTUAL CURRENCY;

EID: 70149097567     PISSN: 09521976     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.engappai.2008.12.003     Document Type: Article
Times cited : (24)

References (24)
  • 3
    • 0034297657 scopus 로고    scopus 로고
    • Multi-agent systems in production planning and control: an application to the scheduling of mixed model assemble lines
    • Caridi M., and Sianesi A. Multi-agent systems in production planning and control: an application to the scheduling of mixed model assemble lines. International Journal of Production Economics 68 (2000) 29-42
    • (2000) International Journal of Production Economics , vol.68 , pp. 29-42
    • Caridi, M.1    Sianesi, A.2
  • 7
    • 0029480608 scopus 로고
    • Bidding-based autonomous process planning and scheduling
    • Gu P., Balasubramanian S., and Norrie D. Bidding-based autonomous process planning and scheduling. Proceedings of SPIE 2620 (1995) 184-193
    • (1995) Proceedings of SPIE , vol.2620 , pp. 184-193
    • Gu, P.1    Balasubramanian, S.2    Norrie, D.3
  • 8
    • 36249030961 scopus 로고    scopus 로고
    • Development of a hybrid negotiation scheme for multi-agent manufacturing systems
    • Kumar N., Tiwari M.K., and Chan F.T.S. Development of a hybrid negotiation scheme for multi-agent manufacturing systems. International Journal of Production Research 46 3 (2008) 539-569
    • (2008) International Journal of Production Research , vol.46 , Issue.3 , pp. 539-569
    • Kumar, N.1    Tiwari, M.K.2    Chan, F.T.S.3
  • 10
    • 84950937653 scopus 로고
    • Integrated shop floor control using autonomous agents
    • Lin G.Y.J., and Solberg J.J. Integrated shop floor control using autonomous agents. IIE Transaction 24 3 (1992) 57-71
    • (1992) IIE Transaction , vol.24 , Issue.3 , pp. 57-71
    • Lin, G.Y.J.1    Solberg, J.J.2
  • 11
    • 38349054283 scopus 로고    scopus 로고
    • Research on reconfiguration of manufacturing resource based on multi-agent
    • Liu Q., Lv L., and Feng T.T. Research on reconfiguration of manufacturing resource based on multi-agent. Journal of Wuhan University of Technology 29 12 (2007) 119-122
    • (2007) Journal of Wuhan University of Technology , vol.29 , Issue.12 , pp. 119-122
    • Liu, Q.1    Lv, L.2    Feng, T.T.3
  • 12
    • 0035837946 scopus 로고    scopus 로고
    • Evolutionary adaptation of dispatching agents in heterarchical manufacturing systems
    • Maione G., and Naso D. Evolutionary adaptation of dispatching agents in heterarchical manufacturing systems. International Journal of Production Research 39 7 (2001) 1481-1503
    • (2001) International Journal of Production Research , vol.39 , Issue.7 , pp. 1481-1503
    • Maione, G.1    Naso, D.2
  • 14
  • 15
    • 0032050336 scopus 로고    scopus 로고
    • CAMPS: a constraint-based architecture for multi-agent planning and scheduling
    • Miyashita K. CAMPS: a constraint-based architecture for multi-agent planning and scheduling. Journal of Intelligent Manufacturing 9 2 (1998) 147-154
    • (1998) Journal of Intelligent Manufacturing , vol.9 , Issue.2 , pp. 147-154
    • Miyashita, K.1
  • 16
    • 0034628954 scopus 로고    scopus 로고
    • An adaptive production control system utilising agent technology
    • Ottaway T.A., and Burns J.R. An adaptive production control system utilising agent technology. International Journal of Production Research 38 4 (2000) 721-737
    • (2000) International Journal of Production Research , vol.38 , Issue.4 , pp. 721-737
    • Ottaway, T.A.1    Burns, J.R.2
  • 17
    • 0032648655 scopus 로고    scopus 로고
    • Integrating flexible process plans with scheduling in flexible manufacturing systems
    • Saygin C., and Kilic S.E. Integrating flexible process plans with scheduling in flexible manufacturing systems. International Journal of Advanced Manufacturing Technology 15 4 (1999) 268-280
    • (1999) International Journal of Advanced Manufacturing Technology , vol.15 , Issue.4 , pp. 268-280
    • Saygin, C.1    Kilic, S.E.2
  • 18
    • 0036340742 scopus 로고    scopus 로고
    • Genetic algorithms in agent-based manufacturing scheduling systems
    • Shen W. Genetic algorithms in agent-based manufacturing scheduling systems. Integrated Computer-Aided Engineering 9 3 (2002) 207-217
    • (2002) Integrated Computer-Aided Engineering , vol.9 , Issue.3 , pp. 207-217
    • Shen, W.1
  • 19
  • 20
    • 70149122240 scopus 로고    scopus 로고
    • Valckenaers, P., Brussel, H.V., Peeters, P., Kollingbaum, 2000. MASCADA: multi-agent manufacturing control for flexible flow shops. In: Proceedings of Annual Conference of ICIMS-NOE, ASI 2000 & IIMB 2000, pp. 214-221.
    • Valckenaers, P., Brussel, H.V., Peeters, P., Kollingbaum, 2000. MASCADA: multi-agent manufacturing control for flexible flow shops. In: Proceedings of Annual Conference of ICIMS-NOE, ASI 2000 & IIMB 2000, pp. 214-221.
  • 22
    • 33744827670 scopus 로고    scopus 로고
    • Dynamic shop floor scheduling in multi-agent manufacturing systems
    • Wong T.N., Leung, et al. Dynamic shop floor scheduling in multi-agent manufacturing systems. Expert Systems with Applications 31 (2006) 486-494
    • (2006) Expert Systems with Applications , vol.31 , pp. 486-494
    • Wong, T.N.1    Leung2
  • 23
    • 2142732422 scopus 로고    scopus 로고
    • A conceptual framework for agent-based agile manufacturing
    • Yu J., and Krishnan K.K. A conceptual framework for agent-based agile manufacturing. Information Systems Journal 14 2 (2004) 93-109
    • (2004) Information Systems Journal , vol.14 , Issue.2 , pp. 93-109
    • Yu, J.1    Krishnan, K.K.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.