메뉴 건너뛰기




Volumn , Issue , 2009, Pages 1125-1134

Risk assessment for water mains using fuzzy approach

Author keywords

[No Author keywords available]

Indexed keywords

FAILURE EVENTS; FAILURE FACTORS; FUZZY APPROACH; FUZZY EXPERT SYSTEMS; PIPE MATERIAL; PROBABILITY OF FAILURE; RISK OF FAILURE; WATER MAINS; WORKING CONDITIONS;

EID: 69949107981     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41020(339)114     Document Type: Conference Paper
Times cited : (21)

References (20)
  • 4
    • 33746340587 scopus 로고    scopus 로고
    • Development of rehabilitation plans for water mains replacement considering risk and cost-benefit assessment
    • Giustolisi, O., Laucelli, D., and Savic, D. (2006). "Development of rehabilitation plans for water mains replacement considering risk and cost-benefit assessment". Civil Engineering and Environmental Systems, 23: 175-190.
    • (2006) Civil Engineering and Environmental Systems , vol.23 , pp. 175-190
    • Giustolisi, O.1    Laucelli, D.2    Savic, D.3
  • 6
    • 69949104105 scopus 로고    scopus 로고
    • Jan. 23, 2008
    • Infrastructure Report, (2007). "The Water Main Break Clock", Canada Free Press, (Jan. 23, 2008).
    • (2007) The Water Main Break Clock
  • 8
    • 0342771593 scopus 로고    scopus 로고
    • Considering time-dependent factors in the statistical prediction of water main breaks
    • Baltimore, MD, USA
    • Kleiner, Y., and Rajani, B. (2000). "Considering Time-dependent Factors in the Statistical Prediction of Water Main Breaks". AWWA Infrastructure Conference, Baltimore, MD, USA. 1-12.
    • (2000) AWWA Infrastructure Conference , pp. 1-12
    • Kleiner, Y.1    Rajani, B.2
  • 9
    • 0036921341 scopus 로고    scopus 로고
    • Forecasting variations and trends in water-main breaks
    • Kleiner, Y., and Rajani, B. (2002). "Forecasting Variations and Trends in Water-Main Breaks". Journal of Infrastructure Systems, 8: 122-131.
    • (2002) Journal of Infrastructure Systems , vol.8 , pp. 122-131
    • Kleiner, Y.1    Rajani, B.2
  • 11
    • 33646246196 scopus 로고    scopus 로고
    • Failure risk management of buried infrastructure using fuzzy-based techniques
    • Aqua
    • Kleiner, Y., Rajani, B., and Sadiq, R. (2006). "Failure risk management of buried infrastructure using fuzzy-based techniques". Journal of Water Supply Research and Technology : Aqua, 55: 81-94.
    • (2006) Journal of Water Supply Research and Technology , vol.55 , pp. 81-94
    • Kleiner, Y.1    Rajani, B.2    Sadiq, R.3
  • 16
    • 33645233852 scopus 로고    scopus 로고
    • Translation of pipe inspection results into condition ratings using the fuzzy synthetic evaluation technique
    • Rajani, B., Kleiner, Y., and Sadiq, R. (2006). "Translation of pipe inspection results into condition ratings using the fuzzy synthetic evaluation technique". Journal of Water Supply Research and Technology: Aqua, 55: 11-24.
    • (2006) Journal of Water Supply Research and Technology: Aqua , vol.55 , pp. 11-24
    • Rajani, B.1    Kleiner, Y.2    Sadiq, R.3
  • 18
    • 2942610868 scopus 로고    scopus 로고
    • Probabilistic risk analysis of corrosion associated failures in cast iron water mains
    • Sadiq, R., Rajani, B., and Kleiner, Y. (2004). "Probabilistic risk analysis of corrosion associated failures in cast iron water mains". Reliability Engineering and System Safety, 86: 1-10.
    • (2004) Reliability Engineering and System Safety , vol.86 , pp. 1-10
    • Sadiq, R.1    Rajani, B.2    Kleiner, Y.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.