메뉴 건너뛰기




Volumn 37, Issue 2, 2010, Pages 265-272

A new heuristic to solve the one-warehouse N-retailer problem

Author keywords

Integer ratio policies; Supply chain management; Two echelon inventory system

Indexed keywords

COMPUTATIONAL STUDIES; CONSTANT RATE; CUSTOMER DEMANDS; INTEGER-RATIO POLICIES; INVENTORY HOLDING; LEAD TIME; LOWER COST; MULTI-ECHELON INVENTORY; OVERALL COSTS; REPLENISHMENT POLICY; SPREADSHEET APPLICATIONS; TWO-ECHELON INVENTORY SYSTEM;

EID: 69549112879     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2009.04.012     Document Type: Article
Times cited : (31)

References (13)
  • 4
    • 0003953131 scopus 로고    scopus 로고
    • Kluwer Academic Publishers, Dordrecht
    • Axsater S. Inventory control (2000), Kluwer Academic Publishers, Dordrecht
    • (2000) Inventory control
    • Axsater, S.1
  • 6
    • 0000976702 scopus 로고
    • A simple continuous review deterministic one-warehouse N-retailer inventory problem
    • Schwarz L.B. A simple continuous review deterministic one-warehouse N-retailer inventory problem. Management Science 19 (1973) 555-566
    • (1973) Management Science , vol.19 , pp. 555-566
    • Schwarz, L.B.1
  • 7
    • 0022162807 scopus 로고
    • 98% Effective integer-ratio lot sizing for one-warehouse multi-retailer systems
    • Roundy R.O. 98% Effective integer-ratio lot sizing for one-warehouse multi-retailer systems. Management Science 31 11 (1985) 1416-1430
    • (1985) Management Science , vol.31 , Issue.11 , pp. 1416-1430
    • Roundy, R.O.1
  • 9
    • 0032689646 scopus 로고    scopus 로고
    • Lot sizes in a capacity constrained facility with available initial inventories
    • Segerstedt A. Lot sizes in a capacity constrained facility with available initial inventories. International Journal of Production Economics 59 1-3 (1999) 469-475
    • (1999) International Journal of Production Economics , vol.59 , Issue.1-3 , pp. 469-475
    • Segerstedt, A.1
  • 10
    • 36049023707 scopus 로고    scopus 로고
    • Corrections of costs to feasible solutions of economic lot scheduling problems
    • Nilsson K., and Segerstedt A. Corrections of costs to feasible solutions of economic lot scheduling problems. Computers and Industrial Engineering 54 1 (2008) 155-168
    • (2008) Computers and Industrial Engineering , vol.54 , Issue.1 , pp. 155-168
    • Nilsson, K.1    Segerstedt, A.2
  • 11
    • 34249948701 scopus 로고    scopus 로고
    • A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique
    • Nilsson A., Segerstedt A., and Van der Sluis E. A new iterative heuristic to solve the joint replenishment problem using a spreadsheet technique. International Journal of Productions Economics 108 1-2 (2007) 399-405
    • (2007) International Journal of Productions Economics , vol.108 , Issue.1-2 , pp. 399-405
    • Nilsson, A.1    Segerstedt, A.2    Van der Sluis, E.3
  • 12
    • 0023589051 scopus 로고
    • Multi-item, one-warehouse, multi-retailer distribution systems
    • Muckstadt J.A., and Roundy R.O. Multi-item, one-warehouse, multi-retailer distribution systems. Management Science 33 (1987) 1613-1621
    • (1987) Management Science , vol.33 , pp. 1613-1621
    • Muckstadt, J.A.1    Roundy, R.O.2
  • 13
    • 3142688494 scopus 로고    scopus 로고
    • Frequency approach for treating capacity-constrained multilevel production
    • Segerstedt A. Frequency approach for treating capacity-constrained multilevel production. International Journal of Production Research 42 16 (2004) 3119-3137
    • (2004) International Journal of Production Research , vol.42 , Issue.16 , pp. 3119-3137
    • Segerstedt, A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.