-
1
-
-
0004749764
-
"Model for station rehabilitation and planning (MSRP)"
-
Ph.D. thesis, Polytechnic Univ., Construction Engineering and Mgmt Dept., Civil Engineering
-
Abu-Mallouh, M. (1999). "Model for station rehabilitation and planning (MSRP)." Ph.D. thesis, Polytechnic Univ., Construction Engineering and Mgmt Dept., Civil Engineering.
-
(1999)
-
-
Abu-Mallouh, M.1
-
2
-
-
0003682244
-
-
Kluwer, Norwell, Mass
-
Belton, V., and Stewart, T. (2002). Multiple criteria decision analysis, an integrated approach, Kluwer, Norwell, Mass.
-
(2002)
Multiple Criteria Decision Analysis, an Integrated Approach
-
-
Belton, V.1
Stewart, T.2
-
4
-
-
0020702683
-
"How to select and how to rank projects: The PROMETHEE method"
-
EJORDT0377-2217 10.1016/0377-2217(86)90044-5
-
Brans, J. P., Mareschal, B., and Vincke, P. (1986). "How to select and how to rank projects: The PROMETHEE method." Eur. J. Oper. Res. EJORDT0377-2217, 24, 228-238. 10.1016/0377-2217(86)90044-5
-
(1986)
Eur. J. Oper. Res.
, vol.24
, pp. 228-238
-
-
Brans, J.P.1
Mareschal, B.2
Vincke, P.3
-
5
-
-
2642560710
-
-
Kluwer, Norwell, Mass
-
Doumpos, M., and Zopounidis, C. (2002). Multi criteria decision aid classification methods, Kluwer, Norwell, Mass.
-
(2002)
Multi Criteria Decision Aid Classification Methods
-
-
Doumpos, M.1
Zopounidis, C.2
-
6
-
-
0034925811
-
"Outranking methods as tools in strategic natural resources planning"
-
Kangas, A., Kangas, J., and Pykalainen, J. (2001). "Outranking methods as tools in strategic natural resources planning." Silva Fennica Research Articles, 35, 215-227.
-
(2001)
Silva Fennica Research Articles
, vol.35
, pp. 215-227
-
-
Kangas, A.1
Kangas, J.2
Pykalainen, J.3
-
8
-
-
84898925080
-
"Measurement scales and scale independence in the analytical hierarchy process"
-
ZZZZZZ1057-9214 10.1002/1099-1360(200007)9:4<163::AID-MCDA274>3.0. CO;2-L
-
Leskinen, P. (2000). "Measurement scales and scale independence in the analytical hierarchy process." J. Multi-Criter. Decis. Anal. ZZZZZZ1057-9214, 9, 163-174. 10.1002/ 1099-1360(200007)9:4<163::AID-MCDA274>3.0.CO;2-L
-
(2000)
J. Multi-Criter. Decis. Anal.
, vol.9
, pp. 163-174
-
-
Leskinen, P.1
-
9
-
-
0242269345
-
"PROMETHEE and AHP: The design of operational synergies in multi criteria analysis. Strengthening PROMETHEE with ideas of AHP"
-
EJORDT0377-2217 10.1016/S0377-2217(03)00153-X
-
Macharis, C., Springael, J., De Brucker, K., and Verbeke, A. (2004). "PROMETHEE and AHP: The design of operational synergies in multi criteria analysis. Strengthening PROMETHEE with ideas of AHP." Eur. J. Oper. Res. EJORDT0377-2217, 153, 307-317. 10.1016/ S0377-2217(03)00153-X
-
(2004)
Eur. J. Oper. Res.
, vol.153
, pp. 307-317
-
-
Macharis, C.1
Springael, J.2
De Brucker, K.3
Verbeke, A.4
-
10
-
-
0020702682
-
"A programming method for determining which Paris Metro Stations should be renovated"
-
EJORDT0377-2217 10.1016/0377-2217(86)90054-8
-
Roy, B., Present, M., and Silhol, D. (1986). "A programming method for determining which Paris Metro Stations should be renovated." Eur. J. Oper. Res. EJORDT0377-2217, 24(2), 318-334. 10.1016/ 0377-2217(86)90054-8
-
(1986)
Eur. J. Oper. Res.
, vol.24
, Issue.2
, pp. 318-334
-
-
Roy, B.1
Present, M.2
Silhol, D.3
-
12
-
-
63049103557
-
"Subway Station Diagnosis Index (SSDI): A condition assessment model"
-
MS thesis, Concordia Univ., Canada
-
Semaan, N. (2006). "Subway Station Diagnosis Index (SSDI): A condition assessment model." MS thesis, Concordia Univ., Canada.
-
(2006)
-
-
Semaan, N.1
-
14
-
-
13944255098
-
"Quantitative assessment for piles productivity factors"
-
JCEMD40733-9364 10.1061/(ASCE)0733-9364(2004)130:3(405)
-
Zayed, T., and Halpin, D. (2004). "Quantitative assessment for piles productivity factors." J. Constr. Eng. Manage. JCEMD40733-9364, 130(3), 405-414. 10.1061/(ASCE)0733-9364(2004)130:3(405)
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.3
, pp. 405-414
-
-
Zayed, T.1
Halpin, D.2
|