![]() |
Volumn 22, Issue 5-6, 2009, Pages 593-602
|
Time series modeling by a regression approach based on a latent process
|
Author keywords
Classification; EM algorithm; Hidden process; Maximum likelihood; Regression; Time series
|
Indexed keywords
ALTERNATIVE APPROACH;
BAUM-WELCH ALGORITHMS;
CLASSIFICATION;
EM ALGORITHM;
EM ALGORITHMS;
EXPECTATION-MAXIMIZATION ALGORITHMS;
EXPERIMENTAL STUDIES;
GLOBAL OPTIMIZATION ALGORITHM;
HIDDEN PROCESS;
ITERATIVE REWEIGHTED LEAST SQUARE;
LOGISTIC PROCESS;
MAXIMUM LIKELIHOOD METHODS;
MODEL PARAMETERS;
MODELING TECHNIQUE;
MULTI-CLASS;
NEW APPROACHES;
ON DYNAMICS;
PIECEWISE REGRESSION;
POLYNOMIAL REGRESSION MODELS;
PROCESS PARAMETERS;
RAILWAY INFRASTRUCTURE;
REAL WORLD DATA;
REGRESSION;
REGRESSION MODEL;
REMOTE MONITORING;
SIMULATED DATA;
SWITCH MECHANISM;
SWITCH OPERATION;
SYNTHETIC REPRESENTATIONS;
TIME SERIES MODELING;
ALGORITHMS;
BIOINFORMATICS;
GLOBAL OPTIMIZATION;
MAXIMUM LIKELIHOOD;
PARAMETER ESTIMATION;
RAILROAD TRANSPORTATION;
SYSTEMS ENGINEERING;
TIME SERIES;
REGRESSION ANALYSIS;
ALGORITHM;
ANALYTICAL PARAMETERS;
ARTICLE;
CLASSIFICATION;
DATA ANALYSIS;
EXPERIMENTAL STUDY;
HIDDEN MARKOV MODEL;
MAXIMUM LIKELIHOOD METHOD;
PRIORITY JOURNAL;
PROCESS OPTIMIZATION;
RAILWAY;
REGRESSION ANALYSIS;
STATISTICAL MODEL;
TIME SERIES ANALYSIS;
ALGORITHMS;
COMPUTER SIMULATION;
LIKELIHOOD FUNCTIONS;
LOGISTIC MODELS;
MARKOV CHAINS;
MODELS, THEORETICAL;
RAILROADS;
REGRESSION ANALYSIS;
TIME;
|
EID: 68149170833
PISSN: 08936080
EISSN: None
Source Type: Journal
DOI: 10.1016/j.neunet.2009.06.040 Document Type: Article |
Times cited : (54)
|
References (23)
|