Stope design and geological uncertainty: Quantification of risk in conventional designs and a probabilistic alternative

Author keywords

Economic evaluation; Optimization; Risk analysis; Stochastic simulation; Stope design

Indexed keywords

CONVENTIONAL DESIGN; ECONOMIC EVALUATION; ECONOMIC POTENTIALS; GEOLOGICAL UNCERTAINTY; MATHEMATICAL FORMULATION; ONTARIO , CANADA; RISK-BASED; STOCHASTIC SIMULATION; STOPE DESIGN;

EID: 68049137575     PISSN: 10627391     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10913-009-0020-y     Document Type: Article
Times cited : (30)

References (24)
  • 1
    • 0036605160 scopus 로고    scopus 로고
    • Geostatistical simulations for risk assessment and decision making: The mining industry perspective
    • J.-M. Rendu, "Geostatistical simulations for risk assessment and decision making: the mining industry perspective", Int. J. Surface Mining, Reclamation and Environment, 16 (2002).
    • (2002) Int. J. Surface Mining, Reclamation and Environment , vol.16
    • Rendu, J.-M.1
  • 2
    • 1842764835 scopus 로고    scopus 로고
    • Resource/reserve inventories: What are the objectives?
    • M. Vallee, "Resource/reserve inventories: What are the objectives?" CIM Bulletin, 92 (1999).
    • (1999) CIM Bulletin , vol.92
    • Vallee, M.1
  • 4
    • 0000009392 scopus 로고
    • Risk analysis for mine scheduling by conditional simulation
    • Section A: Mining Technology
    • P. J. Ravenscroft, "Risk analysis for mine scheduling by conditional simulation," Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 101 (1992).
    • (1992) Transactions of the Institution of Mining and Metallurgy , vol.101
    • Ravenscroft, P.J.1
  • 5
    • 0002931897 scopus 로고    scopus 로고
    • Risk in minerals projects: Analysis, perception and management
    • Section A: Mining Technology
    • P. A. Dowd, "Risk in minerals projects: analysis, perception and management," Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 106 (1997).
    • (1997) Transactions of the Institution of Mining and Metallurgy , vol.106
    • Dowd, P.A.1
  • 6
    • 0036064712 scopus 로고    scopus 로고
    • Moving forward from traditional optimization: Grade uncertainty and risk effects in open-pit design
    • Section A: Mining Technology
    • R. Dimitrakopoulos, C. T. Farrelly, and M. Godoy, "Moving forward from traditional optimization: Grade uncertainty and risk effects in open-pit design," Transactions of the Institution of Mining and Metallurgy Section A: Mining Technology, 111 (2002).
    • (2002) Transactions of the Institution of Mining and Metallurgy , vol.111
    • Dimitrakopoulos, R.1    Farrelly., C.T.2    Godoy, M.3
  • 7
    • 34250173438 scopus 로고    scopus 로고
    • A maximum upside / minimum downside approach to the traditional optimization of open pit design
    • R. Dimitrakopoulos, L. Martinez, and S. Ramazan, "A maximum upside / minimum downside approach to the traditional optimization of open pit design," Journal of Mining Science, 43 (2007).
    • (2007) Journal of Mining Science , vol.43
    • Dimitrakopoulos, R.1    Martinez., L.2    Ramazan, S.3
  • 8
    • 35548992349 scopus 로고    scopus 로고
    • Uncertainty based production scheduling in open pit mining
    • R. Dimitrakopoulos and S. Ramazan, "Uncertainty based production scheduling in open pit mining," SME Transactions, 316 (2004).
    • (2004) SME Transactions , vol.316
    • Dimitrakopoulos, R.1    Ramazan, S.2
  • 10
    • 33750463822 scopus 로고    scopus 로고
    • Managing risk and waste mining in long-term production scheduling
    • M. C. Godoy and R. Dimitrakopoulos, "Managing risk and waste mining in long-term production scheduling," SME Transactions, 316 (2004).
    • (2004) SME Transactions , vol.316
    • Godoy, M.C.1    Dimitrakopoulos, R.2
  • 13
    • 84866864956 scopus 로고    scopus 로고
    • The application of second-generation stope optimization tools in underground cutoff grade analysis
    • Whittle Programming Pty Ltd. Perth
    • G. Thomas and A. Earl, "The application of second-generation stope optimization tools in underground cutoff grade analysis," in: Strategic Mine Planning, Whittle Programming Pty Ltd., Perth (1999).
    • (1999) Strategic Mine Planning
    • Thomas, G.1    Earl, A.2
  • 16
    • 35548958284 scopus 로고    scopus 로고
    • Managing grade risk in stope design optimisation: Probabilistic mathematical programming model and application in sublevel stoping
    • N. J. Grieco, "Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping," IMM Transactions, 116 (2007).
    • (2007) IMM Transactions , vol.116
    • Grieco, N.J.1
  • 17
    • 68049119141 scopus 로고    scopus 로고
    • Risk assessment in strategic and tactical geomechanical underground mine design
    • The Australasian Institute of Mining and Metallurgy Melbourne
    • W. F. Bawden, "Risk assessment in strategic and tactical geomechanical underground mine design," in: Proceedings of Orebody Modeling and Strategic Mine Planning Symposium, The Australasian Institute of Mining and Metallurgy, Melbourne (2004).
    • (2004) Proceedings of Orebody Modeling and Strategic Mine Planning Symposium
    • Bawden, W.F.1
  • 19
    • 5144235519 scopus 로고    scopus 로고
    • Generalized sequential Gaussian simulation on group size v and screen-effect approximations for large field simulations
    • R. Dimitrakopoulos and X. Luo, "Generalized sequential Gaussian simulation on group size v and screen-effect approximations for large field simulations," Mathematical Geology, 36 (2004).
    • (2004) Mathematical Geology , vol.36
    • Dimitrakopoulos, R.1    Luo, X.2
  • 20
    • 0346524901 scopus 로고    scopus 로고
    • Direct sequential simulation and co-simulation
    • A. Soares, "Direct sequential simulation and co-simulation," Mathematical Geology, 33 (2001).
    • (2001) Mathematical Geology , vol.33
    • Soares, A.1
  • 24
    • 68049131800 scopus 로고    scopus 로고
    • Applied risk assessment in orebody modeling and mine planning: Decision-making with uncertainty
    • Australasian Institute of Mining and Metallurgy Melbourne
    • R. Dimitrakopoulos, "Applied risk assessment in orebody modeling and mine planning: decision-making with uncertainty," in: Professional Development Short Course Notes, Australasian Institute of Mining and Metallurgy, Melbourne (2007).
    • (2007) Professional Development Short Course Notes
    • Dimitrakopoulos, R.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.