1
-
-
0036605160
-
Geostatistical simulations for risk assessment and decision making: The mining industry perspective
-
J.-M. Rendu, "Geostatistical simulations for risk assessment and decision making: the mining industry perspective", Int. J. Surface Mining, Reclamation and Environment, 16 (2002).
-
(2002)
Int. J. Surface Mining, Reclamation and Environment
, vol.16
-
-
Rendu, J.-M.1
-
2
-
-
1842764835
-
Resource/reserve inventories: What are the objectives?
-
M. Vallee, "Resource/reserve inventories: What are the objectives?" CIM Bulletin, 92 (1999).
-
(1999)
CIM Bulletin
, vol.92
-
-
Vallee, M.1
-
4
-
-
0000009392
-
Risk analysis for mine scheduling by conditional simulation
-
Section A: Mining Technology
-
P. J. Ravenscroft, "Risk analysis for mine scheduling by conditional simulation," Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 101 (1992).
-
(1992)
Transactions of the Institution of Mining and Metallurgy
, vol.101
-
-
Ravenscroft, P.J.1
-
5
-
-
0002931897
-
Risk in minerals projects: Analysis, perception and management
-
Section A: Mining Technology
-
P. A. Dowd, "Risk in minerals projects: analysis, perception and management," Transactions of the Institution of Mining and Metallurgy, Section A: Mining Technology, 106 (1997).
-
(1997)
Transactions of the Institution of Mining and Metallurgy
, vol.106
-
-
Dowd, P.A.1
-
6
-
-
0036064712
-
Moving forward from traditional optimization: Grade uncertainty and risk effects in open-pit design
-
Section A: Mining Technology
-
R. Dimitrakopoulos, C. T. Farrelly, and M. Godoy, "Moving forward from traditional optimization: Grade uncertainty and risk effects in open-pit design," Transactions of the Institution of Mining and Metallurgy Section A: Mining Technology, 111 (2002).
-
(2002)
Transactions of the Institution of Mining and Metallurgy
, vol.111
-
-
Dimitrakopoulos, R.1
Farrelly., C.T.2
Godoy, M.3
-
7
-
-
34250173438
-
A maximum upside / minimum downside approach to the traditional optimization of open pit design
-
R. Dimitrakopoulos, L. Martinez, and S. Ramazan, "A maximum upside / minimum downside approach to the traditional optimization of open pit design," Journal of Mining Science, 43 (2007).
-
(2007)
Journal of Mining Science
, vol.43
-
-
Dimitrakopoulos, R.1
Martinez., L.2
Ramazan, S.3
-
8
-
-
35548992349
-
Uncertainty based production scheduling in open pit mining
-
R. Dimitrakopoulos and S. Ramazan, "Uncertainty based production scheduling in open pit mining," SME Transactions, 316 (2004).
-
(2004)
SME Transactions
, vol.316
-
-
Dimitrakopoulos, R.1
Ramazan, S.2
-
10
-
-
33750463822
-
Managing risk and waste mining in long-term production scheduling
-
M. C. Godoy and R. Dimitrakopoulos, "Managing risk and waste mining in long-term production scheduling," SME Transactions, 316 (2004).
-
(2004)
SME Transactions
, vol.316
-
-
Godoy, M.C.1
Dimitrakopoulos, R.2
-
13
-
-
84866864956
-
The application of second-generation stope optimization tools in underground cutoff grade analysis
-
Whittle Programming Pty Ltd. Perth
-
G. Thomas and A. Earl, "The application of second-generation stope optimization tools in underground cutoff grade analysis," in: Strategic Mine Planning, Whittle Programming Pty Ltd., Perth (1999).
-
(1999)
Strategic Mine Planning
-
-
Thomas, G.1
Earl, A.2
-
14
-
-
68049145268
-
Orebody modeling and strategic mine planning uncertainty and risk management
-
The Australasian Institute of Mining and Metallurgy Melbourne
-
C. Standing, P. Myers, P. Collier, and M. Noppe, "Orebody modeling and strategic mine planning uncertainty and risk management," in: Proceedings of Orebody Modeling and Strategic Mine Planning Symposium, The Australasian Institute of Mining and Metallurgy, Melbourne (2004).
-
(2004)
Proceedings of Orebody Modeling and Strategic Mine Planning Symposium
-
-
Standing, C.1
Myers, P.2
Collier, P.3
Noppe, M.4
-
16
-
-
35548958284
-
Managing grade risk in stope design optimisation: Probabilistic mathematical programming model and application in sublevel stoping
-
N. J. Grieco, "Managing grade risk in stope design optimisation: probabilistic mathematical programming model and application in sublevel stoping," IMM Transactions, 116 (2007).
-
(2007)
IMM Transactions
, vol.116
-
-
Grieco, N.J.1
-
17
-
-
68049119141
-
Risk assessment in strategic and tactical geomechanical underground mine design
-
The Australasian Institute of Mining and Metallurgy Melbourne
-
W. F. Bawden, "Risk assessment in strategic and tactical geomechanical underground mine design," in: Proceedings of Orebody Modeling and Strategic Mine Planning Symposium, The Australasian Institute of Mining and Metallurgy, Melbourne (2004).
-
(2004)
Proceedings of Orebody Modeling and Strategic Mine Planning Symposium
-
-
Bawden, W.F.1
-
19
-
-
5144235519
-
Generalized sequential Gaussian simulation on group size v and screen-effect approximations for large field simulations
-
R. Dimitrakopoulos and X. Luo, "Generalized sequential Gaussian simulation on group size v and screen-effect approximations for large field simulations," Mathematical Geology, 36 (2004).
-
(2004)
Mathematical Geology
, vol.36
-
-
Dimitrakopoulos, R.1
Luo, X.2
-
20
-
-
0346524901
-
Direct sequential simulation and co-simulation
-
A. Soares, "Direct sequential simulation and co-simulation," Mathematical Geology, 33 (2001).
-
(2001)
Mathematical Geology
, vol.33
-
-
Soares, A.1
-
24
-
-
68049131800
-
Applied risk assessment in orebody modeling and mine planning: Decision-making with uncertainty
-
Australasian Institute of Mining and Metallurgy Melbourne
-
R. Dimitrakopoulos, "Applied risk assessment in orebody modeling and mine planning: decision-making with uncertainty," in: Professional Development Short Course Notes, Australasian Institute of Mining and Metallurgy, Melbourne (2007).
-
(2007)
Professional Development Short Course Notes
-
-
Dimitrakopoulos, R.1
|