메뉴 건너뛰기




Volumn 135, Issue 8, 2009, Pages 710-717

Analysis of the design-build delivery method in air force construction projects

Author keywords

Air Force; Construction management; Delivery; Design build

Indexed keywords

AIR FORCE; CONSTRUCTION MANAGEMENT; CONSTRUCTION PROJECTS; DELIVERY; DELIVERY METHODS; DESIGN-BUILD DELIVERY METHOD; DESIGN/BUILD; EMPIRICAL EVIDENCE; EMPIRICAL STUDIES; FISCAL YEARS; MILITARY CONSTRUCTION; PUBLIC SECTOR; RESEARCH EFFORTS;

EID: 67651225434     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000029     Document Type: Article
Times cited : (51)

References (20)
  • 4
    • 84869565669 scopus 로고    scopus 로고
    • Department of the Air Force.. "." Re No. AFH32-1084, HQ USAF, Wash
    • Department of the Air Force. (1996). " Facility requirements.." Rep. No. AFH32-1084, HQ USAF, Wash.
    • (1996) Facility Requirements
  • 7
    • 67651220720 scopus 로고    scopus 로고
    • Transforming the CE career field
    • Eulberg, D. (2007). " Transforming the CE career field.." Air Force Civil Engineer, 15 (1), 4.
    • (2007) Air Force Civil Engineer , vol.15 , Issue.1 , pp. 4
    • Eulberg, D.1
  • 8
    • 84862868706 scopus 로고    scopus 로고
    • Federal Highway Administration. (November 16, 2008)
    • Federal Highway Administration. (2006). " Design-build effectiveness study.." 〈 http:fhwa.dot.gov/reports/designbuild/designbuild.htm 〉 (November 16, 2008).
    • (2006) Design-Build Effectiveness Study
  • 10
    • 34548689135 scopus 로고    scopus 로고
    • Estimating performance time for construction projects
    • 10.1061/(ASCE)0742-597X(2007)23:4(193)
    • Hoffman, G. J., Thal, A. E. Jr., Webb, T. S., and Weir, J. D. (2007). " Estimating performance time for construction projects.." J. Manage. Eng. 0742-597X, 23 (4), 193-199. 10.1061/(ASCE)0742-597X(2007)23:4(193)
    • (2007) J. Manage. Eng. , vol.23 , Issue.4 , pp. 193-199
    • Hoffman, G.J.1    Thal Jr., A.E.2    Webb, T.S.3    Weir, J.D.4
  • 12
    • 0032207592 scopus 로고    scopus 로고
    • Comparison of U.S. project delivery systems
    • 10.1061/(ASCE)0733-9364(1998)124:6(435)
    • Konchar, M., and Sanvido, V. (1998). " Comparison of U.S. project delivery systems.." J. Constr. Eng. Manage. 0733-9364, 124 (6), 435-444. 10.1061/(ASCE)0733-9364(1998)124:6(435)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 435-444
    • Konchar, M.1    Sanvido, V.2
  • 17
    • 67651216452 scopus 로고    scopus 로고
    • RSMeans. 28 Ed., Construction, Mass
    • RSMeans. (2006). Square foot costs, 28 Ed., Construction, Mass.
    • (2006) Square Foot Costs
  • 19
    • 84869592680 scopus 로고    scopus 로고
    • Unified Facilities Criteria (UFC).. "." Re No. UFC 3-701-07, Dept. of Defense, Wash
    • Unified Facilities Criteria (UFC). (2007). " DoD facilities pricing guide.." Rep. No. UFC 3-701-07, Dept. of Defense, Wash.
    • (2007) DoD Facilities Pricing Guide


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.