|
Volumn 15, Issue 1, 2009, Pages 106-118
|
An integrated cost optimisation maintenance model for industrial equipment
|
Author keywords
Accuracy; Backlogs; Maintenance; Optimization techniques
|
Indexed keywords
ACCURACY;
BACKLOGS;
COST DISTRIBUTION;
COST OPTIMIZATION;
DESIGN/METHODOLOGY/APPROACH;
EQUIPMENT FAILURES;
FAILURE RATE;
FINANCIAL COSTS;
HISTORICAL TRENDS;
INDUSTRIAL EQUIPMENT;
INDUSTRIAL ORGANISATION;
LIFE SPAN;
MACHINE PARTS;
MACHINING CELLS;
MAINTENANCE ACTION;
MAINTENANCE MODELS;
MAINTENANCE PROBLEM;
MINIMUM COST;
ON-MACHINES;
OPTIMISATION;
OPTIMIZATION TECHNIQUES;
POTENTIAL IMPACTS;
PREVENTIVE AND CORRECTIVE MAINTENANCE;
PRODUCTION CONDITION;
PRODUCTION LINE;
SCRAP RATE;
SIGNIFICANT IMPACTS;
STOCHASTIC NATURE;
WORKFORCE PLANNING;
AVAILABILITY;
CELL MEMBRANES;
COSTS;
EQUIPMENT;
MACHINERY;
OPTIMIZATION;
PREVENTIVE MAINTENANCE;
STOCHASTIC MODELS;
MAINTAINABILITY;
|
EID: 67650701110
PISSN: 13552511
EISSN: None
Source Type: Journal
DOI: 10.1108/13552510910943912 Document Type: Article |
Times cited : (22)
|
References (9)
|