메뉴 건너뛰기




Volumn 6, Issue 3, 2009, Pages 420-434

The M/M/1 queue with single working vacation and set-up times

Author keywords

Matrix geometric solution; QBD process; Set up times; Single working vacation; Stochastic decomposition

Indexed keywords


EID: 67650699224     PISSN: 17457645     EISSN: 17457653     Source Type: Journal    
DOI: 10.1504/IJOR.2009.026941     Document Type: Article
Times cited : (18)

References (16)
  • 1
    • 9644277116 scopus 로고    scopus 로고
    • Analysis of a GI/M/1 queue with multiple working vacations
    • Baba, Y. (2005) 'Analysis of a GI/M/1 queue with multiple working vacations', Operations Research Letters, Vol. 33, No. 2, pp.201-209.
    • (2005) Operations Research Letters , vol.33 , Issue.2 , pp. 201-209
    • Baba, Y.1
  • 2
    • 34047106692 scopus 로고    scopus 로고
    • On the GI/M/1/N queue with multiple working vacations-analytic analysis and computation
    • Banik, A., Gupta, U. and Pathak, S. (2007) 'On the GI/M/1/N queue with multiple working vacations-analytic analysis and computation', Applied Mathematical Modelling, Vol. 31, No. 9, pp.1701-1710.
    • (2007) Applied Mathematical Modelling , vol.31 , Issue.9 , pp. 1701-1710
    • Banik, A.1    Gupta, U.2    Pathak, S.3
  • 3
    • 34250125289 scopus 로고
    • Queueing systems with vacations-a survey
    • Doshi, B. (1986) 'Queueing systems with vacations-a survey', Queueing Systems, Vol. 1, No. 1, pp.29-66.
    • (1986) Queueing Systems , vol.1 , Issue.1 , pp. 29-66
    • Doshi, B.1
  • 6
    • 33846932272 scopus 로고    scopus 로고
    • The discrete time GI/Geom/1 queue with working vacation and service interruption
    • Li, J. and Tian, N. (2007) 'The discrete time GI/Geom/1 queue with working vacation and service interruption', Applied Mathematics and Computation, Vol. 185, No. 1, pp.1-10.
    • (2007) Applied Mathematics and Computation , vol.185 , Issue.1 , pp. 1-10
    • Li, J.1    Tian, N.2
  • 7
    • 34547586276 scopus 로고    scopus 로고
    • Some results on the M/M/1 queue with working vacations
    • Liu, W., Xu, X. and Tian, N. (2007) 'Some results on the M/M/1 queue with working vacations', Operations Research Letters, Vol. 35, No. 5, pp.595-600.
    • (2007) Operations Research Letters , vol.35 , Issue.5 , pp. 595-600
    • Liu, W.1    Xu, X.2    Tian, N.3
  • 9
    • 0036783843 scopus 로고    scopus 로고
    • M/M/1 queue with working vacations (M/M/1/ WV)
    • Servi, L. and Finn, S. (2002) 'M/M/1 queue with working vacations (M/M/1/ WV)', Performance Evaluation, Vol. 50, No. 1, pp.41-52.
    • (2002) Performance Evaluation , vol.50 , Issue.1 , pp. 41-52
    • Servi, L.1    Finn, S.2
  • 10
    • 0003703213 scopus 로고
    • Elsevier Science Publishers, Amsterdam
    • Takagi, H. (1991) Queueing Analysis, Vol. 1, Elsevier Science Publishers, Amsterdam.
    • (1991) Queueing Analysis , vol.1
    • Takagi, H.1
  • 11
    • 0022660231 scopus 로고
    • Control of the service process in a queueing system
    • Teghem, J. (1986) 'Control of the service process in a queueing system', Eupropean Journal of Operational Research, Vol. 23, No. 2, pp.141-168.
    • (1986) Eupropean Journal of Operational Research , vol.23 , Issue.2 , pp. 141-168
    • Teghem, J.1
  • 13
    • 16244365861 scopus 로고    scopus 로고
    • A two threshold vacation policy in multiserver queueing systems
    • Tian, N. and Zhang, G. (2006b) 'A two threshold vacation policy in multiserver queueing systems', Eupropean Journal of Operational Research, Vol. 168, No. 1, pp.153-163.
    • (2006) Eupropean Journal of Operational Research , vol.168 , Issue.1 , pp. 153-163
    • Tian, N.1    Zhang, G.2
  • 14
    • 33646125857 scopus 로고    scopus 로고
    • M/G/1 queue with multiple working vacations
    • Wu, D. and Takagi, H. (2006) 'M/G/1 queue with multiple working vacations', Performance Evaluation, Vol. 63, No. 7, pp.654-681.
    • (2006) Performance Evaluation , vol.63 , Issue.7 , pp. 654-681
    • Wu, D.1    Takagi, H.2
  • 15
    • 33744508222 scopus 로고    scopus 로고
    • Analysis of multi-server queue with a single vacation (e,d)-policy
    • Xu, X. and Zhang, G. (2006) 'Analysis of multi-server queue with a single vacation (e,d)-policy', Performance Evaluation, Vol. 63, No. 8, pp.625-638.
    • (2006) Performance Evaluation , vol.63 , Issue.8 , pp. 625-638
    • Xu, X.1    Zhang, G.2
  • 16
    • 67650697836 scopus 로고    scopus 로고
    • Adjusting the workload of an under utilized server by scheduling supplementary work
    • Zhang, G., Tian, N. and Love, E. (2006) 'Adjusting the workload of an under utilized server by scheduling supplementary work', International Journal of Operations Research, Vol. 3, No. 1, pp.47-55.
    • (2006) International Journal of Operations Research , vol.3 , Issue.1 , pp. 47-55
    • Zhang, G.1    Tian, N.2    Love, E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.