Optimal interval for major maintenance actions in electricity distribution networks

Author keywords

Asset management; Electricity network; Major maintenance actions

Indexed keywords

BEFORE AND AFTER; ELECTRICITY DISTRIBUTION NETWORKS; ELECTRICITY NETWORK; ENERGY NETWORKS; FAILURE INTENSITY; FAILURE PROCESS; LONG TERM; MAINTENANCE ACTION; MAJOR MAINTENANCE ACTIONS; MECHANICAL EQUIPMENT; MODEL-BASED; MONOTONIC TREND; RELATIVE TIME; SEQUENTIAL EXECUTION; SIMPLE MODEL; TREE TRIMMINGS;

EID: 67650632800     PISSN: 01420615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijepes.2009.03.021     Document Type: Article
Times cited : (38)

References (17)
  • 1
    • 0002362385 scopus 로고
    • Optimum preventive maintenance policies
    • Barlow R.E., and Hunter L.C. Optimum preventive maintenance policies. Operat Res 8 (1960) 90-100
    • (1960) Operat Res , vol.8 , pp. 90-100
    • Barlow, R.E.1    Hunter, L.C.2
  • 2
    • 0034249519 scopus 로고    scopus 로고
    • Calculating the expected failure rate of complex equipment subject to hazardous repair
    • Baker R.D. Calculating the expected failure rate of complex equipment subject to hazardous repair. Int J Product Econ 67 (2000) 53-61
    • (2000) Int J Product Econ , vol.67 , pp. 53-61
    • Baker, R.D.1
  • 3
    • 0035254918 scopus 로고    scopus 로고
    • Cost related reliability evaluation of bulk power systems
    • Billinton R., and Zhang W. Cost related reliability evaluation of bulk power systems. Electr Power Energ Syst 23 (2001) 99-112
    • (2001) Electr Power Energ Syst , vol.23 , pp. 99-112
    • Billinton, R.1    Zhang, W.2
  • 4
    • 67650639868 scopus 로고    scopus 로고
    • Coetzee JL. Reliability degradation and the equipment replacement problem. ICOMS-96, paper 21; 1996.
    • Coetzee JL. Reliability degradation and the equipment replacement problem. ICOMS-96, paper 21; 1996.
  • 6
    • 59649119675 scopus 로고    scopus 로고
    • An accurate fault location algorithm for parallel transmission lines using one-terminal data
    • Guobing S., Jiale S., and Yaozhong G. An accurate fault location algorithm for parallel transmission lines using one-terminal data. Electr Power Energ Syst 31 (2009) 124-129
    • (2009) Electr Power Energ Syst , vol.31 , pp. 124-129
    • Guobing, S.1    Jiale, S.2    Yaozhong, G.3
  • 8
    • 39449094965 scopus 로고    scopus 로고
    • Bulk power risk analysis: Ranking infrastructure elements according to their risk significance
    • Koonce A.M., Apostolakis G.E., and Cook B.K. Bulk power risk analysis: Ranking infrastructure elements according to their risk significance. Electr Power Energ Syst 30 (2008) 169-183
    • (2008) Electr Power Energ Syst , vol.30 , pp. 169-183
    • Koonce, A.M.1    Apostolakis, G.E.2    Cook, B.K.3
  • 9
    • 0024879264 scopus 로고
    • Reliability investigation for a fleet of load haul dump machines in a Swedish mine
    • Kumar U., Klefsjö B., and Granholm S. Reliability investigation for a fleet of load haul dump machines in a Swedish mine. Reliab Eng Syst Safety 26 (1989) 341-361
    • (1989) Reliab Eng Syst Safety , vol.26 , pp. 341-361
    • Kumar, U.1    Klefsjö, B.2    Granholm, S.3
  • 11
    • 0035254439 scopus 로고    scopus 로고
    • Modeling the failure data of a repairable equipment with bathtub type failure intensity
    • Pulcini G. Modeling the failure data of a repairable equipment with bathtub type failure intensity. Reliab Eng Syst Safety 71 (2001) 209-218
    • (2001) Reliab Eng Syst Safety , vol.71 , pp. 209-218
    • Pulcini, G.1
  • 13
    • 14844352510 scopus 로고    scopus 로고
    • On reliability criteria and the implied cost of failure for a maintained component
    • Scarf P.A., Dwight R., and Al-Musrati A. On reliability criteria and the implied cost of failure for a maintained component. Reliab Eng Syst Safety 89 (2005) 199-207
    • (2005) Reliab Eng Syst Safety , vol.89 , pp. 199-207
    • Scarf, P.A.1    Dwight, R.2    Al-Musrati, A.3
  • 14
    • 0030108191 scopus 로고    scopus 로고
    • A simple general model for echelon overhaul and repair
    • Sherwin D.J. A simple general model for echelon overhaul and repair. Reliab Eng Syst Safety 51 (1996) 283-293
    • (1996) Reliab Eng Syst Safety , vol.51 , pp. 283-293
    • Sherwin, D.J.1
  • 15
    • 0344443239 scopus 로고    scopus 로고
    • Optimal allocation of distribution maintenance resources with limited information
    • Sittithumwat A., Soudi F., and Tomsovic A. Optimal allocation of distribution maintenance resources with limited information. Electr Power Syst Res 68 (2004) 208-220
    • (2004) Electr Power Syst Res , vol.68 , pp. 208-220
    • Sittithumwat, A.1    Soudi, F.2    Tomsovic, A.3
  • 16
    • 35748956449 scopus 로고    scopus 로고
    • Outage costs quantification for benefit-cost analysis of distribution automation systems
    • Su C.L., and Teng J.H. Outage costs quantification for benefit-cost analysis of distribution automation systems. Electr Power Energ Syst 29 (2007) 767-774
    • (2007) Electr Power Energ Syst , vol.29 , pp. 767-774
    • Su, C.L.1    Teng, J.H.2
  • 17
    • 67650618329 scopus 로고    scopus 로고
    • US-Canada. Final report on the August 14, 2003 Blackout in the United States and Canada: Causes and recommendations. US-Canada power system outage task force, Governments of the US and Canada; April 2004.
    • US-Canada. Final report on the August 14, 2003 Blackout in the United States and Canada: Causes and recommendations. US-Canada power system outage task force, Governments of the US and Canada; April 2004.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.