메뉴 건너뛰기




Volumn 22, Issue 5, 2009, Pages 566-573

Process design optimization and risk analysis

Author keywords

Optimization; Process design; Risk analysis

Indexed keywords

A PLANTS; CURRENT SITUATION; DECISION VARIABLES; DESIGN OPTIMIZATION; DESIGN PROCESS; DETERMINISTIC APPROACH; FINANCIAL CONSTRAINTS; HAZARD IDENTIFICATION; IN-PROCESS; OBJECTIVE FUNCTIONS; OPTIMIZATION METHODOLOGY; OVERALL COSTS; THRESHOLD LEVELS; TOXIC RELEASE;

EID: 67650309061     PISSN: 09504230     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.jlp.2009.04.007     Document Type: Article
Times cited : (37)

References (13)
  • 5
    • 67650289494 scopus 로고    scopus 로고
    • Plant cost index
    • CEPCI
    • CEPCI. (2008). Plant cost index. Chemical Engineering, 115, 4.
    • (2008) Chemical Engineering , vol.115 , pp. 4
  • 7
    • 0345724979 scopus 로고    scopus 로고
    • Historical analysis of accidents in sea ports
    • Darbra R.M., and Casal J. Historical analysis of accidents in sea ports. Safety Science 42 (2004) 85-98
    • (2004) Safety Science , vol.42 , pp. 85-98
    • Darbra, R.M.1    Casal, J.2
  • 12
    • 33646167171 scopus 로고    scopus 로고
    • Consequences of mayor accidents: assessing the number of injured people
    • Ronza A., Muñoz M., Carol S., and Casal J. Consequences of mayor accidents: assessing the number of injured people. Journal of Hazardous Materials A133 (2006) 46-52
    • (2006) Journal of Hazardous Materials , vol.A133 , pp. 46-52
    • Ronza, A.1    Muñoz, M.2    Carol, S.3    Casal, J.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.