메뉴 건너뛰기




Volumn 79, Issue 10, 2009, Pages 1424-1430

Dynamic reliability assessment for bilateral contract electricity providers in restructured power systems

Author keywords

Bilateral contract; Dynamic; Multi state; Reliability assessment; Restructured

Indexed keywords

ALGEBRAIC OPERATIONS; BILATERAL CONTRACT; BILATERAL CONTRACTS; DYNAMIC RELIABILITY ASSESSMENT; DYNAMIC RELIABILITY INDEX; ENTIRE SYSTEM; GENERATING UNIT; GENERATION COMPANIES; MULTI-STATE; MULTI-STATE MODEL; RELIABILITY ASSESSMENT; RELIABILITY EVALUATION; RELIABILITY INDEX; RESTRUCTURED; RESTRUCTURED POWER SYSTEMS; STATE MODELS; STATE PROBABILITY; STOCHASTIC PROCESS; STOCHASTIC PROCESS MODEL; UNIVERSAL GENERATING FUNCTIONS;

EID: 67649846496     PISSN: 03787796     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.epsr.2009.04.014     Document Type: Article
Times cited : (15)

References (18)
  • 2
    • 0033079764 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation
    • Allan R.N., Billinton R., Breipohl A.M., and Grigg C.H. Bibliography on the application of probability methods in power system reliability evaluation. IEEE Trans. Power Syst. 14 1 (1999) 51-57
    • (1999) IEEE Trans. Power Syst. , vol.14 , Issue.1 , pp. 51-57
    • Allan, R.N.1    Billinton, R.2    Breipohl, A.M.3    Grigg, C.H.4
  • 3
    • 85008048742 scopus 로고    scopus 로고
    • Bibliography on the application of probability methods in power system reliability evaluation 1996-1999
    • Billinton R., Fotuhi-Firuzabad M., and Bertling L. Bibliography on the application of probability methods in power system reliability evaluation 1996-1999. IEEE Trans. Power Syst. 16 4 (2001) 595-602
    • (2001) IEEE Trans. Power Syst. , vol.16 , Issue.4 , pp. 595-602
    • Billinton, R.1    Fotuhi-Firuzabad, M.2    Bertling, L.3
  • 4
    • 13844266710 scopus 로고    scopus 로고
    • Reliability of a small power system using solar power and hydro
    • Jimmy Ehnberg S.G., and Bollen M.H.J. Reliability of a small power system using solar power and hydro. Electr. Power Syst. Res. 74 1 (2005) 119-127
    • (2005) Electr. Power Syst. Res. , vol.74 , Issue.1 , pp. 119-127
    • Jimmy Ehnberg, S.G.1    Bollen, M.H.J.2
  • 5
    • 0038347176 scopus 로고    scopus 로고
    • Power system reliability evaluation using learning vector quantization and Monte Carlo simulation
    • Luo X., Singh C., and Patton A.D. Power system reliability evaluation using learning vector quantization and Monte Carlo simulation. Electr. Power Syst. Res. 66 2 (2003) 163-169
    • (2003) Electr. Power Syst. Res. , vol.66 , Issue.2 , pp. 163-169
    • Luo, X.1    Singh, C.2    Patton, A.D.3
  • 6
    • 0142135089 scopus 로고    scopus 로고
    • Reliability assessment of a restructured power system using reliability network equivalent techniques
    • Wang P., and Billinton R. Reliability assessment of a restructured power system using reliability network equivalent techniques. IEE Proc. Gener. Transm. Distrib. 150 5 (2003) 555-560
    • (2003) IEE Proc. Gener. Transm. Distrib. , vol.150 , Issue.5 , pp. 555-560
    • Wang, P.1    Billinton, R.2
  • 7
    • 2542592402 scopus 로고    scopus 로고
    • Reliability assessment of a restructured power system considering reserve agreements
    • Wang P., and Billinton R. Reliability assessment of a restructured power system considering reserve agreements. IEEE Trans. Power Syst. 19 2 (May 2004) 972-978
    • (2004) IEEE Trans. Power Syst. , vol.19 , Issue.2 , pp. 972-978
    • Wang, P.1    Billinton, R.2
  • 8
    • 11244348902 scopus 로고    scopus 로고
    • Monte carlo simulation based reliability evaluation in a multi-bilateral contracts market
    • Goel L., Viswanath P.A., and Wang P. Monte carlo simulation based reliability evaluation in a multi-bilateral contracts market. IEE Proc. Gener. Transm. Distrib. 151 6 (2004) 728-734
    • (2004) IEE Proc. Gener. Transm. Distrib. , vol.151 , Issue.6 , pp. 728-734
    • Goel, L.1    Viswanath, P.A.2    Wang, P.3
  • 9
    • 34548304092 scopus 로고    scopus 로고
    • Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques
    • Ding Y., Wang P., Goel L., Billinton R., and Karki R. Reliability assessment of restructured power systems using reliability network equivalent and pseudo-sequential simulation techniques. Electr. Power Syst. Res. 77 12 (2007) 1665-1671
    • (2007) Electr. Power Syst. Res. , vol.77 , Issue.12 , pp. 1665-1671
    • Ding, Y.1    Wang, P.2    Goel, L.3    Billinton, R.4    Karki, R.5
  • 10
    • 67649857480 scopus 로고    scopus 로고
    • Report on equipment availability for the ten-year period, 1964-1973, A report of Equipment Availability Task Force of the Prime Movers Committee, Edison Electric Institute, New York, 1974.
    • Report on equipment availability for the ten-year period, 1964-1973, A report of Equipment Availability Task Force of the Prime Movers Committee, Edison Electric Institute, New York, 1974.
  • 11
    • 67649859990 scopus 로고    scopus 로고
    • Markov model for a typical 360 MW coal fired generation unit.
    • Goldner S. Markov model for a typical 360 MW coal fired generation unit. Commun. Dependability Qual. Manag. 9 1 (2006) 24-29
    • (2006) Commun. Dependability Qual. Manag. , vol.9 , Issue.1 , pp. 24-29
    • Goldner, S.1
  • 12
    • 0022786194 scopus 로고
    • Universal generating function
    • Ushakov I. Universal generating function. Soviet J. Computer Syst. Sci. 24 5 (1986) 118-129
    • (1986) Soviet J. Computer Syst. Sci. , vol.24 , Issue.5 , pp. 118-129
    • Ushakov, I.1
  • 14
    • 0033717952 scopus 로고    scopus 로고
    • The method of generalized generating sequences
    • Ushakov I. The method of generalized generating sequences. Eur. J. Operating Res. 125 2 (2000) 316-323
    • (2000) Eur. J. Operating Res. , vol.125 , Issue.2 , pp. 316-323
    • Ushakov, I.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.