메뉴 건너뛰기




Volumn 52, Issue 7, 2009, Pages 1966-1973

Evaluation model for service life of dam based on time-varying risk probability

Author keywords

Dam; Fuzzy probability theory; Information entropy theory; Service life evaluation; Time varying risk probability

Indexed keywords

CHARACTERISTIC VALUE; DAM STRUCTURE; DYNAMIC VARIABILITY; EVALUATION MODELS; FUZZY EVENTS; FUZZY PROBABILITY THEORY; FUZZY RISK; INFORMATION ENTROPY; INFORMATION ENTROPY THEORY; LIFE-TIME; MATHEMATICAL METHOD; ON TIME; PROBABILITY THEORY; RISK FACTORS; RISK PROBABILITIES; SERVICE LIFE EVALUATION; SLOPE INSTABILITY; TECHNOLOGY SUPPORT; THEORY AND METHODS; TIME VARYING; TIME-VARYING EFFECTS; TIME-VARYING RISK PROBABILITY; TREATMENT MEASURES;

EID: 67649834030     PISSN: 10069321     EISSN: 1862281X     Source Type: Journal    
DOI: 10.1007/s11431-009-0151-z     Document Type: Article
Times cited : (28)

References (16)
  • 1
    • 36049047385 scopus 로고    scopus 로고
    • Review on hidden trouble detection and health diagnosis of hydraulic concrete structures
    • DOI 10.1007/s11431-007-6003-9
    • Z. R. Wu J. Li C. S. Gu 2007 Review on hidden trouble detection and health diagnosis of hydraulic concrete structures Sci China Ser E-Tech Sci 50 SupplI 34 50 (Pubitemid 350100229)
    • (2007) Science in China, Series E: Technological Sciences , vol.50 , Issue.SUPPL. 1 , pp. 34-50
    • Wu, Z.1    Li, J.2    Gu, C.3    Su, H.4
  • 2
    • 67649852355 scopus 로고    scopus 로고
    • Discussion on design operation life of water resources and hydropower projects in China (in Chinese)
    • S. R. Zheng 2008 Discussion on design operation life of water resources and hydropower projects in China (in Chinese) Water Resour Power 2 4 1 6
    • (2008) Water Resour Power , vol.2 , Issue.4 , pp. 1-6
    • Zheng, S.R.1
  • 3
    • 0033099523 scopus 로고    scopus 로고
    • Lifetime of concrete dam models under constant loads
    • F. Barpi G. Ferrara L. Imperato 1999 Lifetime of concrete dam models under constant loads Mater Struct 32 1 103 111
    • (1999) Mater Struct , vol.32 , Issue.1 , pp. 103-111
    • Barpi, F.1    Ferrara, G.2    Imperato, L.3
  • 4
    • 36148954661 scopus 로고    scopus 로고
    • Impacts from decommissioning of hydroelectric dams: A life cycle perspective
    • P. Sergio 2007 Impacts from decommissioning of hydroelectric dams: a life cycle perspective Climatic Change 84 2 281 294
    • (2007) Climatic Change , vol.84 , Issue.2 , pp. 281-294
    • Sergio, P.1
  • 5
    • 36049019336 scopus 로고    scopus 로고
    • Assessment model of dam operation risk based on monitoring data
    • Z. R. Wu H. Z. Su H. Q. Guo 2007 Assessment model of dam operation risk based on monitoring data Sci China Ser E-Tech Sci 50 SupplI 144 152
    • (2007) Sci China ser E-Tech Sci , vol.50 , Issue.SUPPL I , pp. 144-152
    • Wu, Z.R.1    Su, H.Z.2    Guo, H.Q.3
  • 6
    • 33646246393 scopus 로고    scopus 로고
    • Improvement of overtopping risk evaluations using probabilistic concepts for existing dams
    • K. Hyun-Han M. Young-II 2006 Improvement of overtopping risk evaluations using probabilistic concepts for existing dams Stoch Environ Res Risk Assess 20 2 223 237
    • (2006) Stoch Environ Res Risk Assess , vol.20 , Issue.2 , pp. 223-237
    • Hyun-Han, K.1    Young-Ii, M.2
  • 7
    • 33847148961 scopus 로고    scopus 로고
    • Reliability in dams and the effects of spillway dimensions on risk levels
    • Y. Kasim E. Cevat 2007 Reliability in dams and the effects of spillway dimensions on risk levels Water Resour Manage 21 6 747 760
    • (2007) Water Resour Manage , vol.21 , Issue.6 , pp. 747-760
    • Kasim, Y.1    Cevat, E.2
  • 8
    • 49249103804 scopus 로고    scopus 로고
    • Risk assessment method of major unsafe hydroelectric project
    • Z. R. Wu H. Z. Su H. Q. Guo 2008 Risk assessment method of major unsafe hydroelectric project Sci China Ser E-Tech Sci 51 9 1345 1352
    • (2008) Sci China ser E-Tech Sci , vol.51 , Issue.9 , pp. 1345-1352
    • Wu, Z.R.1    Su, H.Z.2    Guo, H.Q.3
  • 12
    • 34249847486 scopus 로고    scopus 로고
    • Method for risk analysis of water quality based on fuzzy probabilistic theory (in Chinese)
    • L. W. Li Z. Shi 2007 Method for risk analysis of water quality based on fuzzy probabilistic theory (in Chinese) J Hydraul Eng 4 4 17 21
    • (2007) J Hydraul Eng , vol.4 , Issue.4 , pp. 17-21
    • Li, L.W.1    Shi, Z.2
  • 13
    • 33745312403 scopus 로고    scopus 로고
    • Variable fuzzy assessment method and its application in assessing water resources carrying capacity (in Chinese)
    • S. Y. Chen J. M. Hu 2006 Variable fuzzy assessment method and its application in assessing water resources carrying capacity (in Chinese) J Hydraul Eng 37 3 264 27
    • (2006) J Hydraul Eng , vol.37 , Issue.3 , pp. 264-27
    • Chen, S.Y.1    Hu, J.M.2
  • 14
    • 33750630377 scopus 로고    scopus 로고
    • A free analogue of Shannon's problem on monotonicity of entropy
    • DOI 10.1016/j.aim.2006.03.014, PII S0001870806001010
    • D. Shlyakhtenko 2007 A free analogue of Shannon's problem on monotonicity of entropy Adv Math 208 7 824 833 (Pubitemid 44688709)
    • (2007) Advances in Mathematics , vol.208 , Issue.2 , pp. 824-833
    • Shlyakhtenko, D.1
  • 15
    • 33644932768 scopus 로고    scopus 로고
    • Prediction of remaining service life of existing concrete structures based on reliability (in Chinese)
    • S. C. Zhao G. F. Zhao 2001 Prediction of remaining service life of existing concrete structures based on reliability (in Chinese) Build Sci 17 5 19 22
    • (2001) Build Sci , vol.17 , Issue.5 , pp. 19-22
    • Zhao, S.C.1    Zhao, G.F.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.