메뉴 건너뛰기




Volumn 4, Issue 3, 2009, Pages 281-305

Analysis of automotive body assembly system configurations for quality and productivity

Author keywords

Assembly error; Assembly systems; Configuration; Performance; Productivity; Quality; Variation

Indexed keywords

ASSEMBLY; ECONOMIC AND SOCIAL EFFECTS; IMAGE QUALITY; PRODUCTIVITY; RIVETING;

EID: 67649607521     PISSN: 17500591     EISSN: 17500605     Source Type: Journal    
DOI: 10.1504/IJMR.2009.026575     Document Type: Article
Times cited : (15)

References (52)
  • 2
    • 36248974607 scopus 로고    scopus 로고
    • Reconfigurable manufacturing systems: The state of the art
    • February, pp
    • Bi, Z.M., Lang, S.Y.T., Shen, W. and Wang, L. (2008) 'Reconfigurable manufacturing systems: The state of the art', International Journal of Production Research, Vol. 46, No. 4, February, pp.967-992.
    • (2008) International Journal of Production Research , vol.46 , Issue.4 , pp. 967-992
    • Bi, Z.M.1    Lang, S.Y.T.2    Shen, W.3    Wang, L.4
  • 3
    • 0342971700 scopus 로고
    • Performance comparison of assembly systems with fixed and flexible cycle times
    • June, pp
    • Blumenfeld, D.E. (1989) 'Performance comparison of assembly systems with fixed and flexible cycle times', International Journal of Flexible Manufacturing Systems, Vol. 1, No. 3, June, pp.207-222.
    • (1989) International Journal of Flexible Manufacturing Systems , vol.1 , Issue.3 , pp. 207-222
    • Blumenfeld, D.E.1
  • 4
    • 0025429668 scopus 로고
    • Abandoning the moving assembly line: Models of human operators and job sequencing
    • Buzacott, J.A. (1990) 'Abandoning the moving assembly line: Models of human operators and job sequencing', International Journal of Production Research, Vol. 28, No. 5, pp.821-839.
    • (1990) International Journal of Production Research , vol.28 , Issue.5 , pp. 821-839
    • Buzacott, J.A.1
  • 5
    • 0030216880 scopus 로고    scopus 로고
    • Deformable sheet metal fixturing: Principles, algorithms and simulations
    • August, pp
    • Cai, W.J., Hu, S.J. and Yuan, J. (1996) 'Deformable sheet metal fixturing: Principles, algorithms and simulations', ASME Journal of Engineering for Industry, Vol. 118, August, pp.318-324.
    • (1996) ASME Journal of Engineering for Industry , vol.118 , pp. 318-324
    • Cai, W.J.1    Hu, S.J.2    Yuan, J.3
  • 6
    • 1042281179 scopus 로고    scopus 로고
    • Modeling variation propagation in multi-station assembly systems with compliant parts
    • December, pp
    • Camelio, J., Hu, S.J. and Ceglarek, D. (2003) 'Modeling variation propagation in multi-station assembly systems with compliant parts', ASME Journal of Mechanical Design, Vol. 125, No. 4, December, pp.673-681.
    • (2003) ASME Journal of Mechanical Design , vol.125 , Issue.4 , pp. 673-681
    • Camelio, J.1    Hu, S.J.2    Ceglarek, D.3
  • 7
    • 0023980826 scopus 로고
    • Design issues in mechanical tolerance analysis
    • Chase, K.W. and Greenwood, W.H. (1987) 'Design issues in mechanical tolerance analysis', ASME Manufacturing Review, Vol. 1, No. 1, pp.50-59.
    • (1987) ASME Manufacturing Review , vol.1 , Issue.1 , pp. 50-59
    • Chase, K.W.1    Greenwood, W.H.2
  • 8
    • 34249923684 scopus 로고
    • A survey of research in the application of tolerance analysis to the design of mechanical assemblies
    • Chase, K.W. and Parkinson, A.R. (1991) 'A survey of research in the application of tolerance analysis to the design of mechanical assemblies', Research in Engineering Design, Vol. 3, pp.23-37.
    • (1991) Research in Engineering Design , vol.3 , pp. 23-37
    • Chase, K.W.1    Parkinson, A.R.2
  • 9
    • 3943060902 scopus 로고    scopus 로고
    • Integration of dimensional quality and locator reliability and evaluation of multi-station body-in-white assembly processes
    • Chen, Y., Jin, J. and Shi, J. (2004) 'Integration of dimensional quality and locator reliability and evaluation of multi-station body-in-white assembly processes', IIE Transactions, Vol. 36, No. 9, pp.827-839.
    • (2004) IIE Transactions , vol.36 , Issue.9 , pp. 827-839
    • Chen, Y.1    Jin, J.2    Shi, J.3
  • 11
    • 0025457839 scopus 로고
    • On the optimal allocation of servers and workloads in closed queueing networks
    • July-August, pp
    • Dallery, Y. and Stecke, K.E. (1990) 'On the optimal allocation of servers and workloads in closed queueing networks', Operations Research, Vol. 38, No. 4, July-August, pp.694-703.
    • (1990) Operations Research , vol.38 , Issue.4 , pp. 694-703
    • Dallery, Y.1    Stecke, K.E.2
  • 12
    • 0041881582 scopus 로고    scopus 로고
    • Optimal sensor distribution for variation diagnosis for multi-station assembly processes
    • Ding, Y., Kim, P., Ceglarek, D. and Jin, J. (2003) 'Optimal sensor distribution for variation diagnosis for multi-station assembly processes', IEEE Transactions on Robotics and Automation, Vol. 19, No. 4, pp.543-556.
    • (2003) IEEE Transactions on Robotics and Automation , vol.19 , Issue.4 , pp. 543-556
    • Ding, Y.1    Kim, P.2    Ceglarek, D.3    Jin, J.4
  • 14
    • 19044395859 scopus 로고    scopus 로고
    • Process-oriented tolerancing for multi-station assembly systems
    • Ding, Y., Jin, J., Ceglarek, D. and Shi, J. (2005) 'Process-oriented tolerancing for multi-station assembly systems', IIE Transactions, Vol. 37, No. 6, pp.493-508.
    • (2005) IIE Transactions , vol.37 , Issue.6 , pp. 493-508
    • Ding, Y.1    Jin, J.2    Ceglarek, D.3    Shi, J.4
  • 15
    • 67649590087 scopus 로고    scopus 로고
    • Stream of variations based error compensation in multi-station manufacturing systems
    • Orlando, FL, Paper Number IMECE2005-81550, 6-11 November, pp
    • Djurdjanovic, D. and Zhu, J. (2005) 'Stream of variations based error compensation in multi-station manufacturing systems', ASME International Mechanical Engineering Congress and Exposition, Orlando, FL, Paper Number IMECE2005-81550, 6-11 November, pp.314-319.
    • (2005) ASME International Mechanical Engineering Congress and Exposition , pp. 314-319
    • Djurdjanovic, D.1    Zhu, J.2
  • 16
    • 12344306249 scopus 로고    scopus 로고
    • Productivity of paced parallel-serial manufacturing lines with and without crossover
    • May, pp
    • Freiheit, T., Shpitalni, M. and Hu, S.J. (2004) 'Productivity of paced parallel-serial manufacturing lines with and without crossover', ASME Journal of Manufacturing Science and Engineering, Vol. 126, No. 2, May, pp.361-367.
    • (2004) ASME Journal of Manufacturing Science and Engineering , vol.126 , Issue.2 , pp. 361-367
    • Freiheit, T.1    Shpitalni, M.2    Hu, S.J.3
  • 17
    • 0024641634 scopus 로고
    • A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems
    • Ghosh, S. and Gagnon, R.J. (1989) 'A comprehensive literature review and analysis of the design, balancing and scheduling of assembly systems', International Journal of Production Research, Vol. 27, No. 4, pp.637-670.
    • (1989) International Journal of Production Research , vol.27 , Issue.4 , pp. 637-670
    • Ghosh, S.1    Gagnon, R.J.2
  • 18
    • 0024765174 scopus 로고
    • Fast, effective algorithms for simple assembly line balancing problems
    • Hackman, S.T., Magazine, M. and Wee, T.S. (1989) 'Fast, effective algorithms for simple assembly line balancing problems', Operations Research, Vol. 37, No. 6, pp.916-924.
    • (1989) Operations Research , vol.37 , Issue.6 , pp. 916-924
    • Hackman, S.T.1    Magazine, M.2    Wee, T.S.3
  • 20
    • 0030655546 scopus 로고    scopus 로고
    • Stream of variation theory for automotive body assembly
    • Hu, S.J. (1997) 'Stream of variation theory for automotive body assembly', Annals of the CIRP, Vol. 46, No. 1, pp.1-6.
    • (1997) Annals of the CIRP , vol.46 , Issue.1 , pp. 1-6
    • Hu, S.J.1
  • 21
    • 12344264871 scopus 로고    scopus 로고
    • Stream of variation modeling and analysis of serial-parallel multistage manufacturing systems
    • Huang, Q. and Shi, J. (2004) 'Stream of variation modeling and analysis of serial-parallel multistage manufacturing systems', ASME Transactions, Journal of Manufacturing Science and Engineering, Vol. 126, pp.611-618.
    • (2004) ASME Transactions, Journal of Manufacturing Science and Engineering , vol.126 , pp. 611-618
    • Huang, Q.1    Shi, J.2
  • 22
    • 0026173740 scopus 로고
    • Balancing assembly lines for teams and work groups
    • Johnson, R.V. (1991) 'Balancing assembly lines for teams and work groups', International Journal of Production Research, Vol. 29, No. 6, pp.1205-1214.
    • (1991) International Journal of Production Research , vol.29 , Issue.6 , pp. 1205-1214
    • Johnson, R.V.1
  • 23
    • 0026747418 scopus 로고
    • Modeling and representation of dimensions and tolerances: A survey
    • Juster, N.P. (1992) 'Modeling and representation of dimensions and tolerances: A survey', Computer Aided Design, Vol. 24, No. 1, pp.3-17.
    • (1992) Computer Aided Design , vol.24 , Issue.1 , pp. 3-17
    • Juster, N.P.1
  • 24
    • 0023568706 scopus 로고
    • Manufacturing configuration, capacity and mix decisions considering operational costs
    • Karmarkar, U. and Kekre, S. (1987) 'Manufacturing configuration, capacity and mix decisions considering operational costs', Journal of Manufacturing Systems, Vol. 6, No. 4, pp.315-324.
    • (1987) Journal of Manufacturing Systems , vol.6 , Issue.4 , pp. 315-324
    • Karmarkar, U.1    Kekre, S.2
  • 25
    • 0002965016 scopus 로고    scopus 로고
    • An integrated design support method for flexible assembly systems
    • January-February, pp
    • Lee, H.F. and Stecke, K.E. (1996) 'An integrated design support method for flexible assembly systems', Journal of Manufacturing Systems, Vol. 15, No. 1, January-February, pp.13-32.
    • (1996) Journal of Manufacturing Systems , vol.15 , Issue.1 , pp. 13-32
    • Lee, H.F.1    Stecke, K.E.2
  • 26
    • 0032116504 scopus 로고    scopus 로고
    • Production planning for flexible flow systems with limited machine flexibility
    • July, pp
    • Lee, H.F. and Stecke, K.E. (1998) 'Production planning for flexible flow systems with limited machine flexibility', IIE Transactions, Vol. 30, No. 7, July, pp.669-684.
    • (1998) IIE Transactions , vol.30 , Issue.7 , pp. 669-684
    • Lee, H.F.1    Stecke, K.E.2
  • 28
    • 33947670912 scopus 로고    scopus 로고
    • A framework for capacity planning and machine configuration in flexible assembly systems
    • December, pp
    • Lee, H.F., Srinivasan, M.M. and Yano, C.A. (2006) 'A framework for capacity planning and machine configuration in flexible assembly systems', International Journal of Flexible Manufacturing Systems, Vol. 18, No. 4, December, pp.239-268.
    • (2006) International Journal of Flexible Manufacturing Systems , vol.18 , Issue.4 , pp. 239-268
    • Lee, H.F.1    Srinivasan, M.M.2    Yano, C.A.3
  • 29
    • 0023348983 scopus 로고
    • Finite element analysis of flexible fixturing systems
    • Lee, J.D. and Haynes, L.S. (1987) 'Finite element analysis of flexible fixturing systems', ASME Journal of Engineering for Industry, Vol. 109, pp.134-139.
    • (1987) ASME Journal of Engineering for Industry , vol.109 , pp. 134-139
    • Lee, J.D.1    Haynes, L.S.2
  • 31
    • 0031208633 scopus 로고    scopus 로고
    • Variation simulation for deformable sheet metal assemblies using finite elements methods
    • August, pp
    • Liu, S.C. and Hu, S.J. (1997) 'Variation simulation for deformable sheet metal assemblies using finite elements methods', ASME Journal of Manufacturing Science and Engineering, Vol. 119, August, pp.368-374.
    • (1997) ASME Journal of Manufacturing Science and Engineering , vol.119 , pp. 368-374
    • Liu, S.C.1    Hu, S.J.2
  • 32
    • 44649087259 scopus 로고    scopus 로고
    • Modeling customized product configuration in large assembly manufacturing with supply-chain considerations
    • December, pp
    • Lu, R.F., Petersen, T.D. and Storch, R.L. (2007) 'Modeling customized product configuration in large assembly manufacturing with supply-chain considerations', International Journal of Flexible Manufacturing Systems, Vol. 19, No. 4, December, pp.685-712.
    • (2007) International Journal of Flexible Manufacturing Systems , vol.19 , Issue.4 , pp. 685-712
    • Lu, R.F.1    Petersen, T.D.2    Storch, R.L.3
  • 33
    • 0030147766 scopus 로고    scopus 로고
    • Throughput for production lines with serial work stations and parallel service facilities
    • Magazine, M.J. and Stecke, K.E. (1996) 'Throughput for production lines with serial work stations and parallel service facilities', Performance Evaluation, Vol. 25, pp.211-232.
    • (1996) Performance Evaluation , vol.25 , pp. 211-232
    • Magazine, M.J.1    Stecke, K.E.2
  • 34
    • 0026238769 scopus 로고
    • A multiple criteria decision making approach for the assembly line balancing problem
    • Malakooti, B. (1991) 'A multiple criteria decision making approach for the assembly line balancing problem', International Journal of Production Research, Vol. 29, No. 10, pp.1979-2001.
    • (1991) International Journal of Production Research , vol.29 , Issue.10 , pp. 1979-2001
    • Malakooti, B.1
  • 35
    • 33644619196 scopus 로고    scopus 로고
    • A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes
    • Mandroli, S.S., Shrivastava, A.K. and Ding, Y. (2006) 'A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes', IIE Transactions, Vol. 38, No. 4, pp.309-328.
    • (2006) IIE Transactions , vol.38 , Issue.4 , pp. 309-328
    • Mandroli, S.S.1    Shrivastava, A.K.2    Ding, Y.3
  • 36
    • 0002575034 scopus 로고
    • Automated design of workholding fixtures using kinematic constraint synthesis
    • Mani, M. and Wilson, W.R.D. (1988) 'Automated design of workholding fixtures using kinematic constraint synthesis', SME Transactions of NAMRC XVI, pp.437-444.
    • (1988) SME Transactions of NAMRC XVI , pp. 437-444
    • Mani, M.1    Wilson, W.R.D.2
  • 42
    • 0030270156 scopus 로고    scopus 로고
    • On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems
    • October, pp
    • Smith, T.M. and Stecke, K.E. (1996) 'On the robustness of using balanced part mix ratios to determine cyclic part input sequences into flexible flow systems', International Journal of Production Research, Vol. 34, No. 10, October, pp.2925-2942.
    • (1996) International Journal of Production Research , vol.34 , Issue.10 , pp. 2925-2942
    • Smith, T.M.1    Stecke, K.E.2
  • 43
    • 38249043028 scopus 로고
    • Cell concepts for flexible automated manufacturing
    • Spur, G., Seliger, G. and Viehweger, B. (1986) 'Cell concepts for flexible automated manufacturing', Journal of Manufacturing Systems Vol. 5, No. 3, pp.171-179.
    • (1986) Journal of Manufacturing Systems , vol.5 , Issue.3 , pp. 171-179
    • Spur, G.1    Seliger, G.2    Viehweger, B.3
  • 44
    • 0022097833 scopus 로고
    • The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues
    • July-August, pp
    • Stecke, K.E. and Solberg, J.J. (1985) 'The optimality of unbalancing both workloads and machine group sizes in closed queueing networks of multiserver queues', Operations Research, Vol. 33, No. 4, July-August, pp.882-910.
    • (1985) Operations Research , vol.33 , Issue.4 , pp. 882-910
    • Stecke, K.E.1    Solberg, J.J.2
  • 45
    • 0002150135 scopus 로고
    • An improved method for establishing the process wise quality standard
    • Union of Japanese Scientists and Engineers, 27, No. 3, pp
    • Takezawa, N. (1980) 'An improved method for establishing the process wise quality standard', Reports of Statistical Applied Research, Union of Japanese Scientists and Engineers, Vol. 27, No. 3, pp.63-76.
    • (1980) Reports of Statistical Applied Research , pp. 63-76
    • Takezawa, N.1
  • 46
    • 0024304458 scopus 로고
    • Impact of parallel processing on job sequences in flexible assembly systems
    • Udomkesmalee, N. and Daganzo, C.F. (1989) 'Impact of parallel processing on job sequences in flexible assembly systems', International Journal of Production Research, Vol. 27, No. 1, pp.73-89.
    • (1989) International Journal of Production Research , vol.27 , Issue.1 , pp. 73-89
    • Udomkesmalee, N.1    Daganzo, C.F.2
  • 47
    • 21944440984 scopus 로고    scopus 로고
    • Quality-driven sequence planning for compliant structure assemblies
    • Wang, H. and Ceglarek, D. (2005) 'Quality-driven sequence planning for compliant structure assemblies', Annals of CIRP, Vol. 54, No. 1, pp.31-35.
    • (2005) Annals of CIRP , vol.54 , Issue.1 , pp. 31-35
    • Wang, H.1    Ceglarek, D.2
  • 48
    • 34047205597 scopus 로고    scopus 로고
    • Error cancellation modeling and its application in machining process control
    • Wang, H. and Huang, Q. (2006) 'Error cancellation modeling and its application in machining process control', IIE Transactions on Quality and Reliability, Vol. 38, pp.379-388.
    • (2006) IIE Transactions on Quality and Reliability , vol.38 , pp. 379-388
    • Wang, H.1    Huang, Q.2
  • 49
    • 34547397531 scopus 로고    scopus 로고
    • Using error equivalence concept to automatically adjust discrete manufacturing processes for dimensional variation reduction
    • Wang, H. and Huang Q. (2007) 'Using error equivalence concept to automatically adjust discrete manufacturing processes for dimensional variation reduction', ASME Transactions, Journal of Manufacturing Science and Engineering, Vol. 129, pp.214-219.
    • (2007) ASME Transactions, Journal of Manufacturing Science and Engineering , vol.129 , pp. 214-219
    • Wang, H.1    Huang, Q.2
  • 50
    • 24644516973 scopus 로고    scopus 로고
    • Multi-operational machining processes modeling for sequential root cause identification and measurement reduction
    • Wang, H., Huang, Q. and Katz, R. (2005) 'Multi-operational machining processes modeling for sequential root cause identification and measurement reduction', ASME Transactions, Journal of Manufacturing Science and Engineering, Vol. 127, pp.512-521.
    • (2005) ASME Transactions, Journal of Manufacturing Science and Engineering , vol.127 , pp. 512-521
    • Wang, H.1    Huang, Q.2    Katz, R.3
  • 51
    • 0021488804 scopus 로고
    • The amount of overtaking in a network of queues
    • Whitt, W. (1984) 'The amount of overtaking in a network of queues', Networks, Vol. 14, pp.411-426.
    • (1984) Networks , vol.14 , pp. 411-426
    • Whitt, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.