|
Volumn 49, Issue 4, 2009, Pages
|
Non-boronized compared with boronized operation of ASDEX pgrade with full-tungsten plasma ufacing components
|
Author keywords
[No Author keywords available]
|
Indexed keywords
ASDEX UPGRADE;
BORONIZATION;
CODEPOSITION;
CONTROL PARAMETERS;
CORE PLASMA;
DENSITY PEAKING;
DIVERTOR;
DIVERTOR TILES;
ENERGY CONFINEMENT;
EXPERIMENTAL CAMPAIGN;
FEEDBACK SYSTEMS;
FUEL RETENTION;
GAS PUFFING;
HEATING POWER;
HIGH-POWER;
IMPURITY LEVEL;
INTRINSIC RADIATION;
LOW-Z IMPURITIES;
OPERATIONAL SPACE;
PEDESTAL REGION;
PLASMA OPERATIONS;
PLASMA-FACING COMPONENTS;
POWER CONDITIONS;
POWER FLUX;
POWER LOAD;
POWER-HANDLING CAPABILITY;
RADIATIVE CHARACTERISTICS;
RADIATIVE COOLING;
RADIATIVE LOSS;
SEPARATRIX;
STABLE OPERATION;
TUNGSTEN COATING;
BUILDING MATERIALS;
CONTROL SYSTEM ANALYSIS;
CYCLOTRON RESONANCE;
ELECTRIC CURRENT MEASUREMENT;
ELECTRIC LOAD FORECASTING;
FUSION REACTOR DIVERTORS;
HEATING;
IMPURITIES;
NEON;
PLASMAS;
TUNGSTEN;
ELECTRIC DISCHARGES;
|
EID: 67649404721
PISSN: 00295515
EISSN: 17414326
Source Type: Journal
DOI: 10.1088/0029-5515/49/4/045007 Document Type: Article |
Times cited : (110)
|
References (31)
|