메뉴 건너뛰기




Volumn 119, Issue 2, 2009, Pages 367-379

Exact methods for single-item capacitated lot sizing problem with alternative machines and piece-wise linear production costs

Author keywords

Alternative machines; Dynamic programming; Mixed integer linear programming; Single item capacitated lot sizing problem; Step wise production costs

Indexed keywords

ALTERNATIVE MACHINES; CAPACITATED LOT SIZING PROBLEM; CAPACITATED VEHICLES; COMPUTATIONAL TIME; COST STRUCTURE; DISTRIBUTION CENTERS; DYNAMIC PROGRAMMING ALGORITHM; DYNAMIC PROGRAMS; EXACT METHODS; FINISHED GOODS; FINISHED PRODUCTS; LOWER AND UPPER BOUNDS; MILP FORMULATION; MIXED INTEGER LINEAR PROGRAMMING; NP-HARD; OPTIMAL PRODUCTION; PIECEWISE LINEAR; PRODUCTION COST; SINGLE-ITEM CAPACITATED LOT SIZING PROBLEM; STEP-WISE PRODUCTION COSTS; STORAGE SPACES; SUPPLY CHAIN STRUCTURES; VALID INEQUALITY;

EID: 67349282740     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2009.03.010     Document Type: Article
Times cited : (14)

References (18)
  • 1
    • 63349096024 scopus 로고    scopus 로고
    • Valid inequalities for the single-item capacitated lot sizing problem with step-wise costs
    • Akbalik, A., Pochet, Y., 2009. Valid inequalities for the single-item capacitated lot sizing problem with step-wise costs. European Journal of Operational Research 198, 412-434.
    • (2009) European Journal of Operational Research , vol.198 , pp. 412-434
    • Akbalik, A.1    Pochet, Y.2
  • 2
    • 0035410522 scopus 로고    scopus 로고
    • Modelling practical lot-sizing problems as mixed integer programs
    • Belvaux G., and Wolsey L. Modelling practical lot-sizing problems as mixed integer programs. Management Science 47 7 (2001) 993-1007
    • (2001) Management Science , vol.47 , Issue.7 , pp. 993-1007
    • Belvaux, G.1    Wolsey, L.2
  • 4
    • 0036877284 scopus 로고    scopus 로고
    • On the effectiveness of zero-inventory-ordering policies for the economic lot-sizing model with a class of piecewise linear cost structures
    • Chan L.M.A., Muriel A., Shen Z.-J., and Simchi-Levi D. On the effectiveness of zero-inventory-ordering policies for the economic lot-sizing model with a class of piecewise linear cost structures. Operations Research 50 6 (2002) 1058-1067
    • (2002) Operations Research , vol.50 , Issue.6 , pp. 1058-1067
    • Chan, L.M.A.1    Muriel, A.2    Shen, Z.-J.3    Simchi-Levi, D.4
  • 5
    • 0007077987 scopus 로고
    • Dynamic lot sizing for multi-echelon distribution systems with purchasing and transportation price discounts
    • Diaby M., and Martel A. Dynamic lot sizing for multi-echelon distribution systems with purchasing and transportation price discounts. Operations Research 41 1 (1993) 48-59
    • (1993) Operations Research , vol.41 , Issue.1 , pp. 48-59
    • Diaby, M.1    Martel, A.2
  • 7
    • 0019032810 scopus 로고
    • Deterministic production planning: Algorithms and complexity
    • Florian M., Lenstra J.K., and Rinnooy Kan A.H.G. Deterministic production planning: Algorithms and complexity. Management Science 26 7 (1980) 669-679
    • (1980) Management Science , vol.26 , Issue.7 , pp. 669-679
    • Florian, M.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3
  • 9
    • 2142728615 scopus 로고    scopus 로고
    • Network optimization in supply chain management and financial engineering: An annotated bibliography
    • Geunes J., and Pardalos P.M. Network optimization in supply chain management and financial engineering: An annotated bibliography. Networks 42 2 (2003) 66-84
    • (2003) Networks , vol.42 , Issue.2 , pp. 66-84
    • Geunes, J.1    Pardalos, P.M.2
  • 10
    • 67349196684 scopus 로고    scopus 로고
    • Jans, R., 2006. Solving lotsizing problems on parallel identical machines using symmetry breaking constraints. Technical Report #ERS-2006-051-LIS, Erasmus Research Institute of Management.
    • Jans, R., 2006. Solving lotsizing problems on parallel identical machines using symmetry breaking constraints. Technical Report #ERS-2006-051-LIS, Erasmus Research Institute of Management.
  • 12
    • 19444365210 scopus 로고    scopus 로고
    • Dynamic lot sizing with batch ordering and truckload discounts
    • Li C.-L., Hsu V.N., and Xiao W.-Q. Dynamic lot sizing with batch ordering and truckload discounts. Operations Research 52 4 (2004) 639-654
    • (2004) Operations Research , vol.52 , Issue.4 , pp. 639-654
    • Li, C.-L.1    Hsu, V.N.2    Xiao, W.-Q.3
  • 13
    • 0014564214 scopus 로고
    • Optimal inventory policy with multiple set-up costs
    • Lippman S.A. Optimal inventory policy with multiple set-up costs. Management Science 16 1 (1969) 118-138
    • (1969) Management Science , vol.16 , Issue.1 , pp. 118-138
    • Lippman, S.A.1
  • 15
    • 0001547772 scopus 로고
    • Lot-sizing with constant batches: Formulation and valid inequalities
    • Pochet Y., and Wolsey L.A. Lot-sizing with constant batches: Formulation and valid inequalities. Mathematics of Operations Research 18 4 (1993) 767-785
    • (1993) Mathematics of Operations Research , vol.18 , Issue.4 , pp. 767-785
    • Pochet, Y.1    Wolsey, L.A.2
  • 16
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production-distribution systems
    • Sarmiento A.M., and Nagi R. A review of integrated analysis of production-distribution systems. IIE Transactions 31 (1999) 1061-1074
    • (1999) IIE Transactions , vol.31 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 17
    • 0032094448 scopus 로고    scopus 로고
    • An algorithm for single-item capacitated economic lot sizing with piecewise linear production costs and general holding costs
    • Shaw D.X., and Wagelmans A.P.M. An algorithm for single-item capacitated economic lot sizing with piecewise linear production costs and general holding costs. Management Science 44 6 (1998) 831-838
    • (1998) Management Science , vol.44 , Issue.6 , pp. 831-838
    • Shaw, D.X.1    Wagelmans, A.P.M.2
  • 18
    • 0016509152 scopus 로고
    • A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs
    • Swoveland C. A deterministic multi-period production planning model with piecewise concave production and holding-backorder costs. Management Science 21 9 (1975) 1007-1013
    • (1975) Management Science , vol.21 , Issue.9 , pp. 1007-1013
    • Swoveland, C.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.