메뉴 건너뛰기




Volumn 64, Issue 11, 2009, Pages 2733-2748

An approximate mathematical framework for resource-constrained multistage batch scheduling

Author keywords

Bottleneck; Chemical processes; Mathematical modelling; Multistage batch plants; Optimization; Scheduling

Indexed keywords

BATCH-SCHEDULING; BOTTLENECK; CHEMICAL PROCESSES; CPU TIME; DUE DATES; FEASIBLE SCHEDULES; INDUSTRIAL FACILITIES; MANUFACTURING RESOURCES; MATHEMATICAL FRAMEWORKS; MATHEMATICAL MODELLING; MULTI-STAGE PROCESSING; MULTISTAGE BATCH PLANTS; NEAR-OPTIMAL SOLUTIONS; PLANT OUTPUTS; PROBLEM REPRESENTATIONS; PROCESSING STAGES; PRODUCTION SCHEDULES; REAL-WORLD; RESOURCE-CONSTRAINED; SEQUENCE DEPENDENTS; SEQUENCING VARIABLES;

EID: 67349118829     PISSN: 00092509     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ces.2009.03.002     Document Type: Article
Times cited : (19)

References (21)
  • 1
    • 0023977010 scopus 로고
    • The shifting bottleneck procedure for job shop scheduling
    • Adams J., Balas E., and Zawack D. The shifting bottleneck procedure for job shop scheduling. Management Science 34 3 (1988) 391-401
    • (1988) Management Science , vol.34 , Issue.3 , pp. 391-401
    • Adams, J.1    Balas, E.2    Zawack, D.3
  • 2
    • 0031997369 scopus 로고    scopus 로고
    • Guided local search with shifting bottleneck for job shop scheduling
    • Balas E., and Vazacopoulos A. Guided local search with shifting bottleneck for job shop scheduling. Management Science 44 2 (1998) 262-275
    • (1998) Management Science , vol.44 , Issue.2 , pp. 262-275
    • Balas, E.1    Vazacopoulos, A.2
  • 4
    • 29144514680 scopus 로고    scopus 로고
    • New continuous-time MILP model for the short-term scheduling of multistage batch plants
    • Castro P.M., and Grossmann I.E. New continuous-time MILP model for the short-term scheduling of multistage batch plants. Industrial & Engineering Chemistry Research 44 (2005) 9175-9190
    • (2005) Industrial & Engineering Chemistry Research , vol.44 , pp. 9175-9190
    • Castro, P.M.1    Grossmann, I.E.2
  • 7
    • 2442583184 scopus 로고    scopus 로고
    • Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review
    • Floudas C.A., and Lin X. Continuous-time versus discrete-time approaches for scheduling of chemical processes: a review. Computers and Chemical Engineering 28 (2004) 2109
    • (2004) Computers and Chemical Engineering , vol.28 , pp. 2109
    • Floudas, C.A.1    Lin, X.2
  • 9
    • 0037503184 scopus 로고    scopus 로고
    • An improved MILP formulation for scheduling multiproduct, multistage batch plants
    • Gupta S., and Karimi I.A. An improved MILP formulation for scheduling multiproduct, multistage batch plants. Industrial & Engineering Chemistry Research 42 (2003) 2365
    • (2003) Industrial & Engineering Chemistry Research , vol.42 , pp. 2365
    • Gupta, S.1    Karimi, I.A.2
  • 10
    • 0037111002 scopus 로고    scopus 로고
    • Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods
    • Harjunkoski I., and Grossmann I.E. Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methods. Computers and Chemical Engineering 26 (2002) 1533
    • (2002) Computers and Chemical Engineering , vol.26 , pp. 1533
    • Harjunkoski, I.1    Grossmann, I.E.2
  • 11
    • 0034661353 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multistage multi-product batch plants
    • Hui C.W., and Gupta A. A novel MILP formulation for short-term scheduling of multistage multi-product batch plants. Computers and Chemical Engineering 24 (2000) 1611-1617
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 1611-1617
    • Hui, C.W.1    Gupta, A.2
  • 12
    • 0034387803 scopus 로고    scopus 로고
    • A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints
    • Hui C.W., Gupta A., and Meulen H.A.J. A novel MILP formulation for short-term scheduling of multi-stage multi-product batch plants with sequence-dependent constraints. Computers and Chemical Engineering 24 (2000) 2705-2717
    • (2000) Computers and Chemical Engineering , vol.24 , pp. 2705-2717
    • Hui, C.W.1    Gupta, A.2    Meulen, H.A.J.3
  • 13
    • 0030121742 scopus 로고    scopus 로고
    • Extending the shifting bottleneck procedure to real-life applications
    • Ivens P., and Lambrecht M. Extending the shifting bottleneck procedure to real-life applications. European Journal of Operational Research 90 (1996) 252-268
    • (1996) European Journal of Operational Research , vol.90 , pp. 252-268
    • Ivens, P.1    Lambrecht, M.2
  • 14
    • 30344468781 scopus 로고    scopus 로고
    • A decomposition framework for the scheduling of single- and multi-stage processes
    • Maravelias C.T. A decomposition framework for the scheduling of single- and multi-stage processes. Computers and Chemical Engineering 30 (2006) 407-420
    • (2006) Computers and Chemical Engineering , vol.30 , pp. 407-420
    • Maravelias, C.T.1
  • 15
    • 0035339828 scopus 로고    scopus 로고
    • An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities
    • Méndez C.A., Henning G.P., and Cerdá J. An MILP continuous-time approach to short-term scheduling of resource-constrained multistage flowshop batch facilities. Computers and Chemical Engineering 25 (2001) 701-711
    • (2001) Computers and Chemical Engineering , vol.25 , pp. 701-711
    • Méndez, C.A.1    Henning, G.P.2    Cerdá, J.3
  • 16
    • 33748102518 scopus 로고    scopus 로고
    • An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources
    • Méndez C.A., and Cerdá J. An MILP framework for short-term scheduling of single-stage batch plants with limited discrete resources. Computer-Aided Chemical Engineering 10 (2002) 721-726
    • (2002) Computer-Aided Chemical Engineering , vol.10 , pp. 721-726
    • Méndez, C.A.1    Cerdá, J.2
  • 17
    • 33748120584 scopus 로고    scopus 로고
    • Short-term scheduling of multistage batch processes subject to limited finite resources
    • Méndez C.A., and Cerdá J. Short-term scheduling of multistage batch processes subject to limited finite resources. Computer-Aided Chemical Engineering 15 (2003) 984-989
    • (2003) Computer-Aided Chemical Engineering , vol.15 , pp. 984-989
    • Méndez, C.A.1    Cerdá, J.2
  • 20
    • 0001690679 scopus 로고
    • A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants
    • Pinto J.M., and Grossmann I.E. A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants. Industrial and Engineering Chemistry Research 34 (1995) 3037-3051
    • (1995) Industrial and Engineering Chemistry Research , vol.34 , pp. 3037-3051
    • Pinto, J.M.1    Grossmann, I.E.2
  • 21
    • 0002584921 scopus 로고    scopus 로고
    • An alternate MILP model for short-term scheduling of batch plants with preordering constraints
    • Pinto J.M., and Grossmann I.E. An alternate MILP model for short-term scheduling of batch plants with preordering constraints. Industrial & Engineering Chemistry Research 35 (1996) 338-342
    • (1996) Industrial & Engineering Chemistry Research , vol.35 , pp. 338-342
    • Pinto, J.M.1    Grossmann, I.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.