|
Volumn 34, Issue 11, 2009, Pages 2501-2509
|
Analysis of the cost for the refurbishment of small hydropower plants
|
Author keywords
Cost; Refurbishment; Small hydropower
|
Indexed keywords
ECONOMIC OPTIMIZATION;
ENERGY DEMANDS;
HYDROPOWER PLANTS;
REFURBISHMENT;
SMALL HYDRO-POWER PLANTS;
SMALL HYDROPOWER;
COST BENEFIT ANALYSIS;
COSTS;
ECONOMIC ANALYSIS;
ENERGY MANAGEMENT;
FOSSIL FUELS;
HYDROELECTRIC POWER PLANTS;
COST-BENEFIT ANALYSIS;
DEMAND ANALYSIS;
ENERGY MARKET;
ENERGY USE;
FOSSIL FUEL;
HYDROELECTRIC POWER PLANT;
OPTIMIZATION;
PRICE DYNAMICS;
REFURBISHMENT;
EURASIA;
EUROPE;
SOUTHERN EUROPE;
SPAIN;
|
EID: 67149141836
PISSN: 09601481
EISSN: None
Source Type: Journal
DOI: 10.1016/j.renene.2009.03.027 Document Type: Article |
Times cited : (36)
|
References (16)
|