Building a breakwater with prefabricated caissons on soft clay
a
|
Author keywords
Coastal engineering; Geotechnical engineering; Offshore engineering
|
Indexed keywords
CASE HISTORY;
CONCRETE CAISSONS;
GEOTEXTILE TUBES;
HEAVY STORMS;
NAVIGATION CHANNELS;
OFFSHORE BREAKWATERS;
OFFSHORE ENGINEERING;
PREFABRICATED VERTICAL DRAINS;
RETAINING STRUCTURES;
SOFT CLAYS;
SOFT SOILS;
SOIL IMPROVEMENTS;
SURCHARGE PRELOADING;
THICK LAYERS;
YANGTZE ESTUARIES;
BREAKWATERS;
CAISSONS;
CLAY MINERALS;
COASTAL ENGINEERING;
CONCRETE BLOCKS;
CONCRETES;
ENGINEERING;
FOUNDATIONS;
GEOTEXTILES;
PRESSURE VESSELS;
SOILS;
STORMS;
GEOTECHNICAL ENGINEERING;
BREAKWATER;
CAISSON;
CLAY;
COASTAL ENGINEERING;
CONCRETE STRUCTURE;
DRAIN;
FRICTION;
GEOTECHNICAL ENGINEERING;
GEOTEXTILE;
NAVIGATION CHANNEL;
OFFSHORE ENGINEERING;
SOIL IMPROVEMENT;
STORM;
ASIA;
CHINA;
EURASIA;
FAR EAST;
SHANGHAI;
YANGTZE ESTUARY;
|
EID: 64549142023
PISSN: 13532618
EISSN: None
Source Type: Journal
DOI: 10.1680/geng.2009.162.1.3 Document Type: Article |
Times cited : (17)
|
References (16)
|