메뉴 건너뛰기




Volumn 3, Issue 2-4, 2002, Pages 269-291

Risk management in build-operate-transfer projects

Author keywords

BOT projects; risk analysis tools and techniques; selection model

Indexed keywords


EID: 64549105329     PISSN: 14668297     EISSN: 17415241     Source Type: Journal    
DOI: 10.1504/ijram.2002.002558     Document Type: Article
Times cited : (4)

References (55)
  • 1
    • 2942516192 scopus 로고
    • Risk management – an approach for project managers
    • November
    • Perry, J.G. (1986) ‘Risk management – an approach for project managers’, International Journal of Project Management, November, Vol. 4, No. 4, pp.211–216.
    • (1986) International Journal of Project Management , vol.4 , Issue.4 , pp. 211-216
    • Perry, J.G.1
  • 2
    • 0002210527 scopus 로고
    • A risk engineering approach to project risk management
    • February
    • Chapman, C.B. (1990) ‘A risk engineering approach to project risk management’, International Journal of Project Management, February, Vol. 8, No. 1, pp.5–16.
    • (1990) International Journal of Project Management , vol.8 , Issue.1 , pp. 5-16
    • Chapman, C.B.1
  • 3
  • 4
    • 0025200162 scopus 로고
    • Comparative study of BOT projects
    • Tiong, R.L.K. (1990) ‘Comparative study of BOT projects’, Journal of Management in Engineering, Vol. 1, January, pp.107–122.
    • (1990) Journal of Management in Engineering , vol.1 , Issue.January , pp. 107-122
    • Tiong, R.L.K.1
  • 7
    • 0039207535 scopus 로고
    • Extending the use of risk analysis in project management
    • Ward, S.C. and Chapman, C.B. (1991) ‘Extending the use of risk analysis in project management’, International Journal of Project Management, Vol. 9, No. 2, pp.117–123.
    • (1991) International Journal of Project Management , vol.9 , Issue.2 , pp. 117-123
    • Ward, S.C.1    Chapman, C.B.2
  • 8
    • 0002945913 scopus 로고
    • Usage and benefits of project risk analysis and management
    • Simister, S.J. (1994) ‘Usage and benefits of project risk analysis and management’, International Journal of Project Management, Vol. 12, No. 1, pp.5–8.
    • (1994) International Journal of Project Management , vol.12 , Issue.1 , pp. 5-8
    • Simister, S.J.1
  • 15
    • 0002915490 scopus 로고
    • On allocating risk: the essences of project finance
    • Beidleman, C.R. et al. (1990) ‘On allocating risk: the essences of project finance’, Sloan Management Review, Spring, pp.47–55.
    • (1990) Sloan Management Review , vol.Spring , pp. 47-55
    • Beidleman, C.R.1
  • 16
    • 2942610691 scopus 로고
    • Risk management of BOOT projects
    • Woodward, D.G. et al. (1992) ‘Risk management of BOOT projects’, Project, March, pp.10–11.
    • (1992) Project , vol.March , pp. 10-11
    • Woodward, D.G.1
  • 20
    • 0006692137 scopus 로고    scopus 로고
    • Risk analysis for revenue dependent infrastructure project
    • Songer, A.D. et al. (1997) ‘Risk analysis for revenue dependent infrastructure project’, Construction Management and Economics, Vol. 31, pp.377–382.
    • (1997) Construction Management and Economics , vol.31 , pp. 377-382
    • Songer, A.D.1
  • 21
    • 0343000065 scopus 로고
    • The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong
    • Chau, K.W. (1995) The validity of the triangular distribution assumption in Monte Carlo simulation of construction costs: empirical evidence from Hong Kong’, Construction Management and Economics, Vol. 13, pp.15–21.
    • (1995) Construction Management and Economics , vol.13 , pp. 15-21
    • Chau, K.W.1
  • 22
    • 0006439585 scopus 로고    scopus 로고
    • Distributions and correlation in Monte Carlo simulation
    • Wall, D.M. (1997) ‘Distributions and correlation in Monte Carlo simulation’, Construction Management and Economics, Vol. 15, pp.241–258.
    • (1997) Construction Management and Economics , vol.15 , pp. 241-258
    • Wall, D.M.1
  • 23
    • 2942550688 scopus 로고    scopus 로고
    • Project time risk analysis through simulation
    • July
    • Dey, P.K. and Ogunlana, S.O. (2001) ‘Project time risk analysis through simulation’, Cost Engineering, Vol. 43, No. 7, July, pp.24–32.
    • (2001) Cost Engineering , vol.43 , Issue.7 , pp. 24-32
    • Dey, P.K.1    Ogunlana, S.O.2
  • 24
    • 0000771440 scopus 로고    scopus 로고
    • Assessment and evaluation of contractor data against client goals using PERT approach
    • Hatush, Z. and Skitmore, M. (1997) ‘Assessment and evaluation of contractor data against client goals using PERT approach’, Construction Management and Economics, Vol. 15, pp.327–340.
    • (1997) Construction Management and Economics , vol.15 , pp. 327-340
    • Hatush, Z.1    Skitmore, M.2
  • 25
    • 0025503588 scopus 로고
    • Risks, classification of estimates and contingency
    • Yeo, K.T. (1990) ‘Risks, classification of estimates and contingency’, Journal of Management Engineering, Vol. 6, No. 4, pp.458–70.
    • (1990) Journal of Management Engineering , vol.6 , Issue.4 , pp. 458-470
    • Yeo, K.T.1
  • 26
    • 2942572914 scopus 로고
    • Project cost sensitivity and variability analysis
    • May
    • Yeo, A. (1991) ‘Project cost sensitivity and variability analysis’, International Journal of Project Management, May, Vol. 9, No. 2, pp.111—116.
    • (1991) International Journal of Project Management , vol.9 , Issue.2 , pp. 111-116
    • Yeo, A.1
  • 27
    • 0000383867 scopus 로고
    • Use of sensitivity analysis in build-operate-transfer project evaluation
    • Woodward, D.G. (1995) ‘Use of sensitivity analysis in build-operate-transfer project evaluation’, International Journal of Project Management, Vol. 13, No. 4, pp.239–246.
    • (1995) International Journal of Project Management , vol.13 , Issue.4 , pp. 239-246
    • Woodward, D.G.1
  • 30
    • 0001848701 scopus 로고
    • Planning for project control through risk analysis: a petroleum pipeline-laying project
    • Dey, P.P.K., Tabucanon, M. and Ogunlana, S. (1994) ‘Planning for project control through risk analysis: a petroleum pipeline-laying project’, International Journal of Project Management, Vol. 12, No. 1, pp.23–33.
    • (1994) International Journal of Project Management , vol.12 , Issue.1 , pp. 23-33
    • Dey, P.P.K.1    Tabucanon, M.2    Ogunlana, S.3
  • 31
    • 0026106979 scopus 로고
    • Project risk assessment using the analytic hierarchy process
    • February
    • Mustafa, M.A. and Al-Bahar, J.F. (1991) ‘Project risk assessment using the analytic hierarchy process’, IEEE Transactions on Engineering Management, February, Vol. 38, No. 1, pp.46–52.
    • (1991) IEEE Transactions on Engineering Management , vol.38 , Issue.1 , pp. 46-52
    • Mustafa, M.A.1    Al-Bahar, J.F.2
  • 32
    • 0011127465 scopus 로고
    • Risk management for overseas construction projects
    • Zhi, H. (1995) ‘Risk management for overseas construction projects’, International Journal of Project Management, Vol. 13, No. 4, pp.231–237.
    • (1995) International Journal of Project Management , vol.13 , Issue.4 , pp. 231-237
    • Zhi, H.1
  • 33
    • 34250807025 scopus 로고
    • Construction risk assessment by linguistics
    • May
    • Kangari, R. and Riggs, L.S. (1989) ‘Construction risk assessment by linguistics’, IEEE Transactions on Engineering Management, May, Vol. 36, No. 2, pp.126–131.
    • (1989) IEEE Transactions on Engineering Management , vol.36 , Issue.2 , pp. 126-131
    • Kangari, R.1    Riggs, L.S.2
  • 34
    • 38249012721 scopus 로고
    • Risk analysis: lessons from artificial intelligence
    • May
    • Diekmann, J.E. (1992) ‘Risk analysis: lessons from artificial intelligence’, International Journal of Project Management, May, Vol. 10, No. 2, pp.75–80.
    • (1992) International Journal of Project Management , vol.10 , Issue.2 , pp. 75-80
    • Diekmann, J.E.1
  • 39
    • 0025274649 scopus 로고
    • Multi objective decision-tree analysis
    • Haimes, Y.Y., Li, D. and Tulsiani, V. (1990) ‘Multi objective decision-tree analysis’, Risk Analysis, Vol. 10, No. 1, pp.111–129.
    • (1990) Risk Analysis , vol.10 , Issue.1 , pp. 111-129
    • Haimes, Y.Y.1    Li, D.2    Tulsiani, V.3
  • 40
    • 0025607197 scopus 로고
    • Distribution analyser and risk evaluator (DARE) using fault trees
    • Tulsiani, V., Haimes, Y.Y. and Li, D. (1990) ‘Distribution analyser and risk evaluator (DARE) using fault trees’, Risk Analysis, Vol. 10, No. 4, pp.521–538.
    • (1990) Risk Analysis , vol.10 , Issue.4 , pp. 521-538
    • Tulsiani, V.1    Haimes, Y.Y.2    Li, D.3
  • 42
    • 0030167974 scopus 로고    scopus 로고
    • The two-dimensionality of project risk
    • Williams, T.M. (1996) ‘The two-dimensionality of project risk’, International Journal of Project Management, Vol. 14, No. 3, pp.185–186.
    • (1996) International Journal of Project Management , vol.14 , Issue.3 , pp. 185-186
    • Williams, T.M.1
  • 43
    • 0003411572 scopus 로고    scopus 로고
    • Symbiosis of organizational reengineering and risk management for effective implementation of projects
    • Calcutta, India
    • Dey, P.K. (1997) ‘Symbiosis of organizational reengineering and risk management for effective implementation of projects’, Doctoral Thesis, Jadavpur University, Calcutta, India.
    • (1997) Doctoral Thesis, Jadavpur University
    • Dey, P.K.1
  • 44
    • 84986166756 scopus 로고    scopus 로고
    • Decision support system for risk management: a case study
    • Dey, P.K. (2001) ‘Decision support system for risk management: a case study’, Management Decision, Vol. 39, No. 8, pp.634–648.
    • (2001) Management Decision , vol.39 , Issue.8 , pp. 634-648
    • Dey, P.K.1
  • 51
    • 0026652738 scopus 로고
    • A causal analysis of large vehicle accidents through fault tree analysis
    • Joshua, S.C. and Garber, N.J. (1992) ‘A causal analysis of large vehicle accidents through fault tree analysis’, Risk Analysis, Vol. 12, No. 2, pp.173–187.
    • (1992) Risk Analysis , vol.12 , Issue.2 , pp. 173-187
    • Joshua, S.C.1    Garber, N.J.2
  • 53
    • 44949274979 scopus 로고
    • Financial and contractual aspects of build-operate-transfer projects
    • McCarthy, S.C. and Tiong, R.L.K. (1991) ‘Financial and contractual aspects of build-operate-transfer projects’, International Journal of Project Management, Vol. 9, No. 4, pp.222–229.
    • (1991) International Journal of Project Management , vol.9 , Issue.4 , pp. 222-229
    • McCarthy, S.C.1    Tiong, R.L.K.2
  • 55
    • 2942542768 scopus 로고    scopus 로고
    • Build operate transfer procurement traps: examples from transportation projects in Thailand
    • Bangkok
    • Ogunlana, S.O. (1997) ‘Build operate transfer procurement traps: examples from transportation projects in Thailand’, Lecture Material at Asian Institute of Technology, Bangkok.
    • (1997) Lecture Material at Asian Institute of Technology
    • Ogunlana, S.O.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.