메뉴 건너뛰기




Volumn 27, Issue 4, 2009, Pages 365-377

Evaluating real options for mitigating technical risk in public sector R&D acquisitions

Author keywords

Dynamic programming; Management of science technology; Optimization; Project management; Public sector public acquisition; Real options

Indexed keywords

ANALYTICAL TOOLS; DECISION-MAKERS; MULTI STAGES; MULTIPLE VENDORS; NUMERICAL RESULTS; OPTIMAL DECISIONS; PUBLIC SECTOR PUBLIC ACQUISITION; REAL OPTIONS; REAL OPTIONS APPROACHES; STOCHASTIC DYNAMIC PROGRAMMING; TECHNICAL RISKS; TECHNOLOGY READINESS LEVELS; VENDOR SELECTIONS;

EID: 64049089874     PISSN: 02637863     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijproman.2008.05.015     Document Type: Article
Times cited : (28)

References (26)
  • 1
    • 17144364045 scopus 로고    scopus 로고
    • Using options to manage dynamic uncertainty in acquisition projects
    • Ceylan B., and Ford D. Using options to manage dynamic uncertainty in acquisition projects. Acquisit Rev Quart Fall (2002) 241-258
    • (2002) Acquisit Rev Quart , vol.Fall , pp. 241-258
    • Ceylan, B.1    Ford, D.2
  • 2
    • 64049115841 scopus 로고    scopus 로고
    • Department of Defense, Risk management guide for DoD acquisition. Fort Belvoir, VA: Defense Acquisition University; 1996.
    • Department of Defense, Risk management guide for DoD acquisition. Fort Belvoir, VA: Defense Acquisition University; 1996.
  • 3
    • 64049117935 scopus 로고    scopus 로고
    • Department of Defense, Mandatory procedures for major defense acquisition programs. Washington, DC: Department of Defense. Rep. Regulation 5000. 2-R, 2001.
    • Department of Defense, Mandatory procedures for major defense acquisition programs. Washington, DC: Department of Defense. Rep. Regulation 5000. 2-R, 2001.
  • 4
    • 64049101319 scopus 로고    scopus 로고
    • Department of the Navy. Top eleven ways to manage technical risk. Washington, DC: Office of the Assistant Secretary of the Navy (RD&A). Rep. NAVSO P-3686; 1998.
    • Department of the Navy. Top eleven ways to manage technical risk. Washington, DC: Office of the Assistant Secretary of the Navy (RD&A). Rep. NAVSO P-3686; 1998.
  • 5
    • 33845204605 scopus 로고    scopus 로고
    • Real options for defense
    • Glaros G. Real options for defense. Transform Trends 9 June (2003)
    • (2003) Transform Trends , vol.9 , Issue.June
    • Glaros, G.1
  • 6
    • 0037402113 scopus 로고    scopus 로고
    • The value of management flexibility - a real option approach to investment evaluation
    • Yeo K.T., and Qiu F. The value of management flexibility - a real option approach to investment evaluation. Int J Project Manage 21 4 (2003) 243-250
    • (2003) Int J Project Manage , vol.21 , Issue.4 , pp. 243-250
    • Yeo, K.T.1    Qiu, F.2
  • 7
    • 64049083484 scopus 로고    scopus 로고
    • A fuzzy set approach for R&D portfolio selection using a real options valuation model
    • Wang J., and Hwang W. A fuzzy set approach for R&D portfolio selection using a real options valuation model. Omega 36 (2008) 122-130
    • (2008) Omega , vol.36 , pp. 122-130
    • Wang, J.1    Hwang, W.2
  • 9
    • 0035239263 scopus 로고    scopus 로고
    • Project management under risk: using the real options approach to evaluate flexibility in R&D
    • Huckzermeier A., and Loch C.H. Project management under risk: using the real options approach to evaluate flexibility in R&D. Manage Sci 47 1 (2001) 85-101
    • (2001) Manage Sci , vol.47 , Issue.1 , pp. 85-101
    • Huckzermeier, A.1    Loch, C.H.2
  • 10
    • 0003258012 scopus 로고    scopus 로고
    • Valuation of R&D projects using options pricing and decision analysis models
    • Perdue R., McAllister W., King P., and Berkey B. Valuation of R&D projects using options pricing and decision analysis models. Interfaces 29 6 (1999) 57-74
    • (1999) Interfaces , vol.29 , Issue.6 , pp. 57-74
    • Perdue, R.1    McAllister, W.2    King, P.3    Berkey, B.4
  • 11
    • 18544365530 scopus 로고    scopus 로고
    • Adapting real options to new product development by modeling the second Toyota paradox
    • Ford D., and Sobek II D. Adapting real options to new product development by modeling the second Toyota paradox. IEEE Trans Eng Manage 52 2 (2005) 175-185
    • (2005) IEEE Trans Eng Manage , vol.52 , Issue.2 , pp. 175-185
    • Ford, D.1    Sobek II, D.2
  • 12
    • 18544366110 scopus 로고    scopus 로고
    • On the value of flexibility in R&D projects
    • Santiago L., and Vakili P. On the value of flexibility in R&D projects. Manage Sci 51 8 (2005) 1206-1218
    • (2005) Manage Sci , vol.51 , Issue.8 , pp. 1206-1218
    • Santiago, L.1    Vakili, P.2
  • 13
    • 18544388379 scopus 로고    scopus 로고
    • Management of R&D projects under uncertainty: A multidimensional approach to managerial flexibility
    • Santiago L.P., and Bifano T.G. Management of R&D projects under uncertainty: A multidimensional approach to managerial flexibility. IEEE Trans Eng Manage 52 2 (2005) 269-280
    • (2005) IEEE Trans Eng Manage , vol.52 , Issue.2 , pp. 269-280
    • Santiago, L.P.1    Bifano, T.G.2
  • 16
    • 0040679700 scopus 로고    scopus 로고
    • Research and development project selection in the public sector
    • Vonortas N., and Hertzfeld H. Research and development project selection in the public sector. J Policy Anal Manage 17 4 (1998) 639-657
    • (1998) J Policy Anal Manage , vol.17 , Issue.4 , pp. 639-657
    • Vonortas, N.1    Hertzfeld, H.2
  • 18
    • 0035269003 scopus 로고    scopus 로고
    • Capital budgeting under uncertainty - an integrated approach using contingent claims analysis and integer programming
    • Meier H., Christofides N., and Salkin G. Capital budgeting under uncertainty - an integrated approach using contingent claims analysis and integer programming. Operat Res 49 2 (2001) 196-206
    • (2001) Operat Res , vol.49 , Issue.2 , pp. 196-206
    • Meier, H.1    Christofides, N.2    Salkin, G.3
  • 19
    • 0032324684 scopus 로고    scopus 로고
    • Multi-stage real options: the cases of information technology infrastructure and international bank expansion
    • Panayi S., and Trigeorgis L. Multi-stage real options: the cases of information technology infrastructure and international bank expansion. The Quart Rev Econom Finance 38 (1998) 675-692
    • (1998) The Quart Rev Econom Finance , vol.38 , pp. 675-692
    • Panayi, S.1    Trigeorgis, L.2
  • 21
    • 64049107067 scopus 로고    scopus 로고
    • Deputy Under Secretary of Defense for Science and Technology. Technology readiness assessment (TRA) deskbook. Washington, DC: Department of Defense, 2005.
    • Deputy Under Secretary of Defense for Science and Technology. Technology readiness assessment (TRA) deskbook. Washington, DC: Department of Defense, 2005.
  • 22
    • 24744433915 scopus 로고    scopus 로고
    • Toward a systematic approach for selection of NASA technology portfolios
    • Weisbin C., Rodriguez G., Elfes A., and Smith J. Toward a systematic approach for selection of NASA technology portfolios. Syst Eng 7 4 (2004) 285-302
    • (2004) Syst Eng , vol.7 , Issue.4 , pp. 285-302
    • Weisbin, C.1    Rodriguez, G.2    Elfes, A.3    Smith, J.4
  • 23
    • 33751506502 scopus 로고    scopus 로고
    • Extending the START framework: computation of optimal capability development portfolios using a decision theory approach
    • Elfes A., Weisbin C., Manvi R., Adumitoaie V., Lincoln W., and Shelton K. Extending the START framework: computation of optimal capability development portfolios using a decision theory approach. Syst Eng 9 4 (2006) 331-357
    • (2006) Syst Eng , vol.9 , Issue.4 , pp. 331-357
    • Elfes, A.1    Weisbin, C.2    Manvi, R.3    Adumitoaie, V.4    Lincoln, W.5    Shelton, K.6
  • 25
    • 0003676431 scopus 로고
    • Linstone H.A., and Turoff M. (Eds), Addison-Wesley, Reading, MA
    • In: Linstone H.A., and Turoff M. (Eds). The delphi method: techniques and applications (1975), Addison-Wesley, Reading, MA
    • (1975) The delphi method: techniques and applications


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.