메뉴 건너뛰기




Volumn 60, Issue 4, 2009, Pages 237-247

Lean Production and information technology: Connection or contradiction?

Author keywords

Information technology; Kanban; Lean Production; Maintenance; Production control

Indexed keywords

APPLICATIONS; COMPETITION; HYBRID SYSTEMS; MAINTENANCE; PROCESS CONTROL; PRODUCTION CONTROL; PRODUCTION ENGINEERING;

EID: 63049122384     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.compind.2009.01.004     Document Type: Article
Times cited : (120)

References (108)
  • 1
    • 0017557653 scopus 로고
    • Toyota production system and Kanban system: materialisation of just-in-time and respect-for-human system
    • Sugimori Y., Kusunoki K., Cho F., and Uchikawa S. Toyota production system and Kanban system: materialisation of just-in-time and respect-for-human system. International Journal of Production Research 15 6 (1977) 553-564
    • (1977) International Journal of Production Research , vol.15 , Issue.6 , pp. 553-564
    • Sugimori, Y.1    Kusunoki, K.2    Cho, F.3    Uchikawa, S.4
  • 2
    • 34547321220 scopus 로고    scopus 로고
    • Celebrating the enigma: the continuing puzzle of the Toyota Production System
    • New S.J. Celebrating the enigma: the continuing puzzle of the Toyota Production System. International Journal of Production Research 45 16 (2007) 3545-3554
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3545-3554
    • New, S.J.1
  • 4
    • 33847417402 scopus 로고    scopus 로고
    • The genelogy of Lean Production
    • Holweg M. The genelogy of Lean Production. Journal of Operations Management 25 2 (2007) 420-437
    • (2007) Journal of Operations Management , vol.25 , Issue.2 , pp. 420-437
    • Holweg, M.1
  • 9
    • 33747370919 scopus 로고    scopus 로고
    • A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies
    • Herron C., and Braiden P.M. A methodology for developing sustainable quantifiable productivity improvement in manufacturing companies. International Journal of Production Economics 104 1 (2006) 143-153
    • (2006) International Journal of Production Economics , vol.104 , Issue.1 , pp. 143-153
    • Herron, C.1    Braiden, P.M.2
  • 10
    • 33847343756 scopus 로고    scopus 로고
    • The early road to material requirements planning
    • Mabert V.A. The early road to material requirements planning. Journal of Operations Management 25 2 (2007) 346-356
    • (2007) Journal of Operations Management , vol.25 , Issue.2 , pp. 346-356
    • Mabert, V.A.1
  • 12
    • 0038754455 scopus 로고
    • Ford Whitman Harris and the economic order quantity model
    • Erlenkotter D. Ford Whitman Harris and the economic order quantity model. Operations Research 10 2 (1990) 937-946
    • (1990) Operations Research , vol.10 , Issue.2 , pp. 937-946
    • Erlenkotter, D.1
  • 14
    • 0031257551 scopus 로고    scopus 로고
    • FORRIDGE-principles of good practice in material flow
    • Towill D.R. FORRIDGE-principles of good practice in material flow. Production Planning and Control 8 7 (1997) 622-632
    • (1997) Production Planning and Control , vol.8 , Issue.7 , pp. 622-632
    • Towill, D.R.1
  • 16
    • 0036758689 scopus 로고    scopus 로고
    • Period batch control: classic, not outdated
    • Benders J., and Riezebos J. Period batch control: classic, not outdated. Production Planning and Control 13 6 (2002) 497-506
    • (2002) Production Planning and Control , vol.13 , Issue.6 , pp. 497-506
    • Benders, J.1    Riezebos, J.2
  • 24
    • 0028408211 scopus 로고
    • An approach to production planning and scheduling in cyclically scheduled manufacturing systems
    • Loersh A.G., and Muckstadt J.A. An approach to production planning and scheduling in cyclically scheduled manufacturing systems. International Journal of Production Research 32 4 (1994) 851-871
    • (1994) International Journal of Production Research , vol.32 , Issue.4 , pp. 851-871
    • Loersh, A.G.1    Muckstadt, J.A.2
  • 25
    • 0032050798 scopus 로고    scopus 로고
    • Seqeuncing, lot-sizing and scheduling of several products in job shops: the common cycle approach
    • Ouenniche J., and Bocter F. Seqeuncing, lot-sizing and scheduling of several products in job shops: the common cycle approach. International Journal of Production Research 36 4 (1998) 1125-1140
    • (1998) International Journal of Production Research , vol.36 , Issue.4 , pp. 1125-1140
    • Ouenniche, J.1    Bocter, F.2
  • 30
    • 0033417975 scopus 로고    scopus 로고
    • Lean Production and the Toyota Production System-or, the case of the forgotten production concepts
    • Hampson I. Lean Production and the Toyota Production System-or, the case of the forgotten production concepts. Economic and Industrial Democracy 20 3 (1999) 369-391
    • (1999) Economic and Industrial Democracy , vol.20 , Issue.3 , pp. 369-391
    • Hampson, I.1
  • 31
    • 0036820339 scopus 로고    scopus 로고
    • Workload control in job shops: an introduction to the special issue
    • Gaalman G., and Perona M. Workload control in job shops: an introduction to the special issue. Production Planning and Control 13 7 (2002) 565-567
    • (2002) Production Planning and Control , vol.13 , Issue.7 , pp. 565-567
    • Gaalman, G.1    Perona, M.2
  • 33
    • 0028406510 scopus 로고
    • Coping with the loss of pooling synergy in cellular manufacturing systems
    • Suresh N.C., and Meredith J.R. Coping with the loss of pooling synergy in cellular manufacturing systems. Management Science 40 4 (1994) 466-483
    • (1994) Management Science , vol.40 , Issue.4 , pp. 466-483
    • Suresh, N.C.1    Meredith, J.R.2
  • 36
    • 0024714613 scopus 로고
    • Synchromized manufacturing at final assembly and feeder shops
    • Luss H. Synchromized manufacturing at final assembly and feeder shops. International Journal of Production Research 27 8 (1989) 1413-1426
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1413-1426
    • Luss, H.1
  • 37
  • 38
    • 0027576601 scopus 로고
    • Development of production cycles for Group Technology environment with the Wagner-Whitin algorithm
    • Jamshidi H., and Browne J. Development of production cycles for Group Technology environment with the Wagner-Whitin algorithm. Computer Industrial Engineering 24 2 (1993) 199-207
    • (1993) Computer Industrial Engineering , vol.24 , Issue.2 , pp. 199-207
    • Jamshidi, H.1    Browne, J.2
  • 39
    • 0030733745 scopus 로고    scopus 로고
    • Period batch control for group technology-an improved procedure
    • Rachamadugu R., and Tu Q. Period batch control for group technology-an improved procedure. Computer Industrial Engineering 32 1 (1997) 1-7
    • (1997) Computer Industrial Engineering , vol.32 , Issue.1 , pp. 1-7
    • Rachamadugu, R.1    Tu, Q.2
  • 41
    • 0020766055 scopus 로고
    • Selecting the right inventory management system: Western and Japanese approaches
    • Schonberger R.J. Selecting the right inventory management system: Western and Japanese approaches. Production and Inventory Management 24 2 (1983) 33-44
    • (1983) Production and Inventory Management , vol.24 , Issue.2 , pp. 33-44
    • Schonberger, R.J.1
  • 43
    • 0024715082 scopus 로고
    • A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operaiton
    • Rees L.P., Huang P.Y., and Taylor B.W. A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operaiton. International Journal of Production Research 27 8 (1989) 1427-1443
    • (1989) International Journal of Production Research , vol.27 , Issue.8 , pp. 1427-1443
    • Rees, L.P.1    Huang, P.Y.2    Taylor, B.W.3
  • 44
    • 0026883891 scopus 로고
    • Comparison of make-to-order job shops with different machine layouts and production control systems
    • Yang K.K., and Jacobs F.R. Comparison of make-to-order job shops with different machine layouts and production control systems. International Journal of Production Research 30 6 (1992) 1269-1283
    • (1992) International Journal of Production Research , vol.30 , Issue.6 , pp. 1269-1283
    • Yang, K.K.1    Jacobs, F.R.2
  • 46
    • 84990601666 scopus 로고
    • Planning and control in multi-cell manufacturing
    • Steele D.C., Berry W.L., and Chapman S.N. Planning and control in multi-cell manufacturing. Decision Sciences 26 1 (1995) 1-34
    • (1995) Decision Sciences , vol.26 , Issue.1 , pp. 1-34
    • Steele, D.C.1    Berry, W.L.2    Chapman, S.N.3
  • 47
    • 0025564738 scopus 로고
    • Analysis of a Kanban discipline for cell coordination in production lines 1
    • Mitra D., and Mitrani I. Analysis of a Kanban discipline for cell coordination in production lines 1. Management Science 36 12 (1990) 1548-1566
    • (1990) Management Science , vol.36 , Issue.12 , pp. 1548-1566
    • Mitra, D.1    Mitrani, I.2
  • 49
    • 0003449926 scopus 로고
    • Institute of Industrial Engineers, Atlanta
    • Monden Y. Toyota Production System (1983), Institute of Industrial Engineers, Atlanta
    • (1983) Toyota Production System
    • Monden, Y.1
  • 50
    • 0000861722 scopus 로고
    • A proof for the queing theory formula: L = λW
    • Little J.D.C. A proof for the queing theory formula: L = λW. Operations Research 9 3 (1961) 383-387
    • (1961) Operations Research , vol.9 , Issue.3 , pp. 383-387
    • Little, J.D.C.1
  • 57
    • 37149016036 scopus 로고    scopus 로고
    • Why do successful companies fail? A case study of the decline of Dunlop
    • McGovern T. Why do successful companies fail? A case study of the decline of Dunlop. Business History 49 6 (2007) 886-907
    • (2007) Business History , vol.49 , Issue.6 , pp. 886-907
    • McGovern, T.1
  • 58
    • 0037448859 scopus 로고    scopus 로고
    • Enterprise resource planning: implementation procedures and critical success factors
    • Umble E.J., Haft R.R., and Umble M.M. Enterprise resource planning: implementation procedures and critical success factors. European Journal of Operational Research 146 2 (2003) 241-257
    • (2003) European Journal of Operational Research , vol.146 , Issue.2 , pp. 241-257
    • Umble, E.J.1    Haft, R.R.2    Umble, M.M.3
  • 59
    • 33847393339 scopus 로고    scopus 로고
    • Enterprise resource planning (ERP)-a brief history
    • Jacobs F.R., and Weston F.C. Enterprise resource planning (ERP)-a brief history. Journal of Operations Management 27 2 (2007) 357-363
    • (2007) Journal of Operations Management , vol.27 , Issue.2 , pp. 357-363
    • Jacobs, F.R.1    Weston, F.C.2
  • 62
    • 27944434873 scopus 로고    scopus 로고
    • ERP research, development and implementation in China; and overview
    • Wang C., Xu L., Liu X., and Qin X. ERP research, development and implementation in China; and overview. International Journal of Production Research 43 18 (2005) 3915-3932
    • (2005) International Journal of Production Research , vol.43 , Issue.18 , pp. 3915-3932
    • Wang, C.1    Xu, L.2    Liu, X.3    Qin, X.4
  • 63
    • 0024048651 scopus 로고
    • Designing the closed loop elements of a material requirements planning system on a low volume, make-to-order company (with case study)
    • McAreavey D., Hoey J., and Leonard R. Designing the closed loop elements of a material requirements planning system on a low volume, make-to-order company (with case study). International Journal of Production Research 26 7 (1988) 1141-1159
    • (1988) International Journal of Production Research , vol.26 , Issue.7 , pp. 1141-1159
    • McAreavey, D.1    Hoey, J.2    Leonard, R.3
  • 64
    • 0003850738 scopus 로고
    • Oliver Wight Limited Publications Inc, Essex Junction, Vermont
    • Wight O. Manufacturing Resources Planning: MRPII (1984), Oliver Wight Limited Publications Inc, Essex Junction, Vermont
    • (1984) Manufacturing Resources Planning: MRPII
    • Wight, O.1
  • 66
    • 10244222723 scopus 로고    scopus 로고
    • A multi-level approach to measuring the benefits of an ERP system in manufacturing firms
    • Gefen D., and Ragowsky A. A multi-level approach to measuring the benefits of an ERP system in manufacturing firms. Information Systems Management 22 1 (2005) 18-25
    • (2005) Information Systems Management , vol.22 , Issue.1 , pp. 18-25
    • Gefen, D.1    Ragowsky, A.2
  • 67
    • 0036262707 scopus 로고    scopus 로고
    • Enterprise resource planning (ERP) systems: a research agenda
    • Al-Mashari M. Enterprise resource planning (ERP) systems: a research agenda. Industrial Management and Data Systems 102 3 (2002) 165-170
    • (2002) Industrial Management and Data Systems , vol.102 , Issue.3 , pp. 165-170
    • Al-Mashari, M.1
  • 71
    • 0037464630 scopus 로고    scopus 로고
    • An information processing model of maintenance management
    • Swanson L. An information processing model of maintenance management. International Journal of Production Economics 83 1 (2003) 45-64
    • (2003) International Journal of Production Economics , vol.83 , Issue.1 , pp. 45-64
    • Swanson, L.1
  • 73
    • 0032633664 scopus 로고    scopus 로고
    • Company-wide integration of strategic maintenance; an empirical analysis
    • Jonsson P. Company-wide integration of strategic maintenance; an empirical analysis. International Journal of Production Economics 60-61 1999 (1999) 155-164
    • (1999) International Journal of Production Economics , vol.60-61 , Issue.1999 , pp. 155-164
    • Jonsson, P.1
  • 74
    • 33750299162 scopus 로고    scopus 로고
    • The role of maintenance in improving companies' productivity and profitability
    • Alsyouf I. The role of maintenance in improving companies' productivity and profitability. International Journal of Production Economics 105 1 (2007) 70-78
    • (2007) International Journal of Production Economics , vol.105 , Issue.1 , pp. 70-78
    • Alsyouf, I.1
  • 75
    • 56549109617 scopus 로고    scopus 로고
    • Development in the application of ICT in condition monitoring and maintenance
    • Campos J. Development in the application of ICT in condition monitoring and maintenance. Computers in Industry 60 1 (2009) 1-20
    • (2009) Computers in Industry , vol.60 , Issue.1 , pp. 1-20
    • Campos, J.1
  • 76
    • 0242487685 scopus 로고    scopus 로고
    • Risk-based maintenance: a quantitative approach for maintenance/inspection scheduling and planning
    • Khan F.I., and Haddara M.M. Risk-based maintenance: a quantitative approach for maintenance/inspection scheduling and planning. Journal of Loss Prevention in the Process Industries 16 6 (2003) 563-573
    • (2003) Journal of Loss Prevention in the Process Industries , vol.16 , Issue.6 , pp. 563-573
    • Khan, F.I.1    Haddara, M.M.2
  • 80
    • 33746932223 scopus 로고    scopus 로고
    • Are you using all the features of your CMMS? Following this 7-step plan can help uncover new benefits
    • Singer T. Are you using all the features of your CMMS? Following this 7-step plan can help uncover new benefits. Plant Engineering 53 1 (1999) 32-34
    • (1999) Plant Engineering , vol.53 , Issue.1 , pp. 32-34
    • Singer, T.1
  • 83
    • 0035297024 scopus 로고    scopus 로고
    • Integration of maintenance in the enterprise: towards an enterprise modeling based framework compliant with proactive maintenance strategy
    • Leger J.B., and Movel G. Integration of maintenance in the enterprise: towards an enterprise modeling based framework compliant with proactive maintenance strategy. Production Planning and Control 12 2 (2001) 176-187
    • (2001) Production Planning and Control , vol.12 , Issue.2 , pp. 176-187
    • Leger, J.B.1    Movel, G.2
  • 86
    • 0035149296 scopus 로고    scopus 로고
    • The impact of total productive maintenance practices on manufacturing performance
    • McKone K.E., Schroeder R.G., and Cua K.O. The impact of total productive maintenance practices on manufacturing performance. Journal of Operations Management 19 1 (2001) 39-58
    • (2001) Journal of Operations Management , vol.19 , Issue.1 , pp. 39-58
    • McKone, K.E.1    Schroeder, R.G.2    Cua, K.O.3
  • 88
    • 0031164686 scopus 로고    scopus 로고
    • Computerized maintenance management systems: a study of system design and use
    • Swanson L. Computerized maintenance management systems: a study of system design and use. Production and Inventory Management 38 2 (1997) 11-15
    • (1997) Production and Inventory Management , vol.38 , Issue.2 , pp. 11-15
    • Swanson, L.1
  • 89
    • 20444503401 scopus 로고    scopus 로고
    • Assert life cycle management: towards improving physical asset performance in the process industry
    • Schuman C., and Brent A. Assert life cycle management: towards improving physical asset performance in the process industry. International Journal of Operations and Production Management 25 5-6 (2005) 566-579
    • (2005) International Journal of Operations and Production Management , vol.25 , Issue.5-6 , pp. 566-579
    • Schuman, C.1    Brent, A.2
  • 91
    • 58049169341 scopus 로고    scopus 로고
    • Neural architecture for a neural expert system for condition-based maintenance of blanking
    • De Boer T.W., and Klingenberg W. Neural architecture for a neural expert system for condition-based maintenance of blanking. International Journal of Materials and Product Technology 32 4 (2008) 447-460
    • (2008) International Journal of Materials and Product Technology , vol.32 , Issue.4 , pp. 447-460
    • De Boer, T.W.1    Klingenberg, W.2
  • 93
    • 27744578861 scopus 로고    scopus 로고
    • Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems
    • Koomsap P., Shaikh N., and Prabhu V. Integrated process control and condition-based maintenance scheduler for distributed manufacturing control systems. International Journal of Production Research 43 8 (2005) 1625-1641
    • (2005) International Journal of Production Research , vol.43 , Issue.8 , pp. 1625-1641
    • Koomsap, P.1    Shaikh, N.2    Prabhu, V.3
  • 95
    • 0346338151 scopus 로고    scopus 로고
    • The control of setting up of a predictive maintenance programme using a system of indicators
    • Carnero M.C. The control of setting up of a predictive maintenance programme using a system of indicators. Omega-International Journal of Management Science 32 1 (2004) 57-75
    • (2004) Omega-International Journal of Management Science , vol.32 , Issue.1 , pp. 57-75
    • Carnero, M.C.1
  • 97
    • 0037457294 scopus 로고    scopus 로고
    • Finite element simulation of the punching/blanking process using in-process characterisation of mild steel
    • Klingenberg W., and Singh U.P. Finite element simulation of the punching/blanking process using in-process characterisation of mild steel. Journal of Materials Processing Technology 134 3 (2003) 296-302
    • (2003) Journal of Materials Processing Technology , vol.134 , Issue.3 , pp. 296-302
    • Klingenberg, W.1    Singh, U.P.2
  • 98
    • 0033907762 scopus 로고    scopus 로고
    • Development of an analytical scheme to predict the need for tool regrinding in shearing processes
    • Ko D.C., and Kim B.M. Development of an analytical scheme to predict the need for tool regrinding in shearing processes. International Journal of Machine Tools and Manufacture 40 9 (2000) 1329-1349
    • (2000) International Journal of Machine Tools and Manufacture , vol.40 , Issue.9 , pp. 1329-1349
    • Ko, D.C.1    Kim, B.M.2
  • 99
  • 100
  • 103
    • 1642603342 scopus 로고    scopus 로고
    • Analysis of a production/inventory system with randomly failing production unit submitted to regular preventative maintenance
    • Chelbi A., and Ait-Kado D. Analysis of a production/inventory system with randomly failing production unit submitted to regular preventative maintenance. European Journal of Operational Research 156 3 (2004) 712-718
    • (2004) European Journal of Operational Research , vol.156 , Issue.3 , pp. 712-718
    • Chelbi, A.1    Ait-Kado, D.2
  • 104
  • 105
    • 0037432505 scopus 로고    scopus 로고
    • Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making
    • Al-Najjar B., and Ajsyouf I. Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making. International Journal of Production Economics 84 1 (2003) 85-100
    • (2003) International Journal of Production Economics , vol.84 , Issue.1 , pp. 85-100
    • Al-Najjar, B.1    Ajsyouf, I.2
  • 107
    • 0037246366 scopus 로고    scopus 로고
    • Predicting maintenance performance using object orientated design orientated metrics
    • Bandi R.K., Vaishnavi V.K., and Turk D.E. Predicting maintenance performance using object orientated design orientated metrics. IEEE Transactions on Software Engineering 29 1 (2003) 77-78
    • (2003) IEEE Transactions on Software Engineering , vol.29 , Issue.1 , pp. 77-78
    • Bandi, R.K.1    Vaishnavi, V.K.2    Turk, D.E.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.