메뉴 건너뛰기




Volumn , Issue , 2008, Pages 389-394

Performance evaluation of workflow scheduling strategies considering transportation times and conveyor failures

Author keywords

Automated simulation; MAST; Scheduling strategies; Transportation failure handling

Indexed keywords

CONVEYORS; INDUSTRIAL ENGINEERING; INDUSTRIAL LABORATORIES; MANAGEMENT; SAFETY ENGINEERING; TRANSPORTATION;

EID: 62749184912     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/IEEM.2008.4737897     Document Type: Conference Paper
Times cited : (17)

References (20)
  • 1
    • 17944372642 scopus 로고    scopus 로고
    • Realtime holonic scheduling of material handling operations in a dynamic manufacturing environment
    • R. F. Babiceanu, F. F. Chen, and R. H. Sturges, "Realtime holonic scheduling of material handling operations in a dynamic manufacturing environment," Robotics and Computer-Integrated Manufacturing, vol. 21, pp. 328-337, 2005.
    • (2005) Robotics and Computer-Integrated Manufacturing , vol.21 , pp. 328-337
    • Babiceanu, R.F.1    Chen, F.F.2    Sturges, R.H.3
  • 4
    • 0031210787 scopus 로고    scopus 로고
    • Real-time operational control of an FMS with full routing flexibility
    • M. D. Byrne and P. Chutima, "Real-time operational control of an FMS with full routing flexibility," Int. J. of Production Economics, vol. 51, pp. 109-113, 1997.
    • (1997) Int. J. of Production Economics , vol.51 , pp. 109-113
    • Byrne, M.D.1    Chutima, P.2
  • 5
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Chung-Yee Lee, "Machine scheduling with transportation considerations," J. of Scheduling, vol. 4, pp. 3-24, 2001.
    • (2001) J. of Scheduling , vol.4 , pp. 3-24
    • Lee, C.-Y.1
  • 6
    • 0035885224 scopus 로고    scopus 로고
    • Makespan minimization for flow-shop problems with transportation times and a single robot
    • J. Hurink and S. Knust, "Makespan minimization for flow-shop problems with transportation times and a single robot," Discrete Applied Mathematics, vol. 112, pp. 199-216, 2001.
    • (2001) Discrete Applied Mathematics , vol.112 , pp. 199-216
    • Hurink, J.1    Knust, S.2
  • 7
    • 30344452286 scopus 로고    scopus 로고
    • Two Machine Scheduling under Disruptions with Transportation Considerations
    • C. Y. Lee, J. Y. T. Leung, and G. Yu, "Two Machine Scheduling under Disruptions with Transportation Considerations," J. of Scheduling, vol. 9, pp. 35-48, 2006.
    • (2006) J. of Scheduling , vol.9 , pp. 35-48
    • Lee, C.Y.1    Leung, J.Y.T.2    Yu, G.3
  • 9
    • 0037701292 scopus 로고    scopus 로고
    • Agent-based control systems: Why are they suited to engineering complex systems?
    • N. R. Jennings and S. Bussmann, "Agent-based control systems: Why are they suited to engineering complex systems?," Control Systems Magazine, IEEE, vol. 23, pp. 61-73, 2003.
    • (2003) Control Systems Magazine, IEEE , vol.23 , pp. 61-73
    • Jennings, N.R.1    Bussmann, S.2
  • 12
    • 15744401430 scopus 로고    scopus 로고
    • Joint production and delivery scheduling in two-level supply chains: A distributed agent approach
    • W. Guohua, "Joint production and delivery scheduling in two-level supply chains: a distributed agent approach," in Systems, Man and Cybernetics, 2004 IEEE Int. Conf. on, 2004, pp. 1522-1526 vol.2.
    • (2004) Systems, Man and Cybernetics, 2004 IEEE Int. Conf. on , vol.2 , pp. 1522-1526
    • Guohua, W.1
  • 13
    • 41149151341 scopus 로고    scopus 로고
    • Decision support framework for coordinated production and transport scheduling in SCM
    • A. Bonfill, A. Espuña, and L. Puigjaner, "Decision support framework for coordinated production and transport scheduling in SCM," Computers & Chemical Engineering, vol. 32, pp. 1206-1224, 2008.
    • (2008) Computers & Chemical Engineering , vol.32 , pp. 1206-1224
    • Bonfill, A.1    Espuña, A.2    Puigjaner, L.3
  • 14
    • 0032649737 scopus 로고    scopus 로고
    • A comparative study of dispatching rules in dynamic flowshops and jobshops
    • C. Rajendran and O. Holthaus, "A comparative study of dispatching rules in dynamic flowshops and jobshops," European Journal of Operational Research, vol. 116, pp. 156-170, 1999.
    • (1999) European Journal of Operational Research , vol.116 , pp. 156-170
    • Rajendran, C.1    Holthaus, O.2
  • 15
    • 0036069575 scopus 로고    scopus 로고
    • The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey
    • F. T. S. Chan, H. K. Chan, and H. C. W. Lau, "The State of the Art in Simulation Study on FMS Scheduling: A Comprehensive Survey," The Int. J. of Advanced Manufacturing Technology, vol. 19, pp. 830-849, 2002.
    • (2002) The Int. J. of Advanced Manufacturing Technology , vol.19 , pp. 830-849
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3
  • 18
    • 0019180974 scopus 로고
    • The contract net protocol: High-level communication and control in a distributed problem solver
    • R. G. Smith, "The contract net protocol: High-level communication and control in a distributed problem solver," IEEE Transactions on Computers, vol. 29, pp. 1104-1113, 1980.
    • (1980) IEEE Transactions on Computers , vol.29 , pp. 1104-1113
    • Smith, R.G.1
  • 20


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.